This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
In 2025, Amazon Data Services purchased a 346-acre property in Kline Township, Schuylkill County, Pennsylvania, for $178 million.
Further to the south-west, within the Camden council area, Greenbox has also begun work on an Amazon project in Gregory Hills.
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
Located in the Silverdale Industrial Estate, this new West London facility is a specialized two-story data center dedicated to AWS tape storage.
Located near to the Sydney Zoo and AirTrunk's facility
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
The campus was first developed by Talen Energy's Cumulus division before being sold to Amazon Web Services.
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
This facility is part of Amazon's New Carlisle I Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle I Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility is part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
This facility will be part of Amazon's New Carlisle II Campus in Indiana.
Amazon is planning its second campus in Villanueva de Gállego close to the existing one.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon Web Services (AWS) is moving forward with its $205 million data center project in Chile. This campus represents the first facility built by Amazon’s cloud platform in the South American country.
This planned facility will be part of Amazon's Padre Hurtado Campus in Chile.
AWS filed for a third facility in the Puente Alto commune of Santiago, but this was rejected by the SEA in 2023.
This facility is part of Amazon's Huerchuraba Campus in Santiago, Chile.
AWS is building a new, two-building data center campus in the Huechuraba suburb of Santiago, Chile, marking its second major data center project in the capital.
Amazing Web Services' Swindon facility was previously occupied by Hewlett Packard. HP had operated two data centers on the site from the 1990s up until 2020, when the facilities were decommissioned.
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
Amazon is planning a two-building campus at Linmere Island, near Houghton Regis, northwest of Luton.
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
This is the second data center building of Amazon's Didcot campus.
The Amazon's two data center campus was built adjacent to the Didcot Power Station under the pseudonym Willow Developments LLC.
The single-story facility will span 8,692 sq m (94,000 sq ft), while the two-story one will take up 20,800 sqm (224,000 sq ft).
The company also plans to deploy 52 3-MVA diesel generators for backup power, four of which would be secondary backup generators. Two additional 1MVA generators were proposed for powering administrative sections of the sit
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
Amazon Web Services (AWS) had planned a third data center campus in Louisa County, Virginia, a project that was ultimately withdrawn following community opposition.
Amazon is planning a $50m data center on a 13.2-hectare site at 54-80 Ferris Road, Cobblebank, about 40km west of Melbourne’s center.
The Summit Crossing Tech Campus proposal calls for 2.1 million SF of data centers on a 231-acre property in Massaponax.
Amazon Web Services (AWS) is set to significantly expand its data center operations by establishing a new presence in Frederick, Maryland.
Amazon Web Services (AWS) has announced plans to invest $15 billion in Hobart, Indiana, to develop a massive data center campus.
This facility will be part of Amazon's BWI- 150 campus in Maryland.
This facility will be part of Amazon's BWI-150 campus in Maryland.
This facility will be part of Amazon's BWI-150 campus in Maryland.
Amazon Web Services (AWS) has filed for another major expansion in Louisa County, Virginia, proposing the "Desper Creek Technology Campus."
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.
Amazon Data Services is moving forward with plans for a massive $3 billion data center project, code-named "Project Galaxy," in Sidney, Ohio.
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
Amazon is moving forward with a massive $10 billion data center campus in Richmond County, North Carolina.
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
Amazon's subsidiary, Amazon Data Services, Inc., acquired nearly 985 acres on the west side of Interstate 75 for $270 million, with the deal closing in late July 2025.
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
The $3 billion Amazon Web Services (AWS) data center project in Vicksburg, Mississippi, represents the largest private-sector investment in Warren County’s history.
Amazon AWS is building $11 billion data center campuses in Indiana. The company plans to build up to 30 buildings on different campuses. New Carlisle II is the second campus of Amazon in New Carlisle, Indiana.
Amazon Web Services (AWS) is set to develop data centers at the Bord na Móna Eco Energy Park in County Offaly, Ireland.
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
Amazon's Mattameade Tech campus/ Orrock Tech Campus would span 1,143 acres across Spotsylvania and Caroline counties in Virginia.
"Project Green" is a massive data center campus led by Amazon Web Services (AWS) in New Florence, Missouri, representing one of the largest private investments in the state's history.
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
This data center is a part of Amazon's Pharma City Campus in Hyderabad.
Phase II of the previously permitted Cosner Tech Campus will see the build of five data center buildings totaling 1.3 million sq ft (120,773 sqm)
On October 10, 2023, the Board of Supervisors approved a rezoning to allow for the development of a 1.9 million square ft. data center campus on approximately 329 acres.
The proposed Amazon Data Services (AWS) project in Wilmington, Ohio, is a massive $4 billion investment planned for a 471-acre campus at 1488 South U.S. 68.
AWS’s proposed 630 MW campus was withdrawn over water constraints, despite its $3.6B valuation.
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
SK Group and Amazon Web Services (AWS) are teaming up to build an AI data center in Ulsan, South Korea, with a total investment of 7 trillion won (about $5.11 billion).
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
The facility features a two-story design comprising secure ground-level offices and two levels of dedicated data hall space.
This facility is part of Amazon's New Carlisle I Campus in Indiana.
Amazon Web Services (AWS) operates a data center facility in the Kutanegara region of West Java, Indonesia.
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
Amazon is building a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.
Amazon Web Services (AWS) is securing over 400 acres in Arlington, Oregon, for a future data center campus, adding to their existing Oregon data centers in Morrow and Umatilla counties.
Amazon is developing a new data center campus on 430 acres in Covington, Georgia.
Amazon is constructing a two-story data center spanning 28,566 square meters (307,400 square feet) at the Drogheda IDA Business & Technology Park.
Planned 7.5M sq ft AWS campus on 869 acres at the former Birchwood Power Plant. $6B investment, 19 buildings across multiple phases. Project stalled pending lawsuit over the county's attempt to renegotiate the performance agreement.
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
The facility is located in the IDA Business and Technology Park, Donore Road, Drogheda, Co Meath.
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
The planned facility, spanning 1 million square feet (92,905 square meters), will be operated as a data center by a tenant rather than by the property's owner, NorthPoint Development.
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
This facility is part of Amazon's New Carlisle I Campus in Indiana.
Amazon is constructing a two-building campus in Virginia’s Stafford County. The campus consists of two data-center buildings planned on 50 acres off Old Potomac Church Road, near U.S. 1 and Stafford Hospital.
Amazon is constructing a two-building campus in Virginia’s Stafford County. The campus consists of two data-center buildings planned on 50 acres off Old Potomac Church Road, near U.S. 1 and Stafford Hospital.
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
Amazon has proposed developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia. The campus would span more than 1.7 million sq ft (157,935 sqm) at full build-out.
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
Amazon Web Services (AWS) plans to invest $10 billion to build two data center complexes at industrial parks in Madison County, an area just north of the state’s capital, Jackson.
Amazon is building a two-building data center campus along Route 3 in Stevensburg, a town in Culpeper County, Northern Virginia.
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
In 2022, Amazon Web Services (AWS) established a cloud region in Aragon, Spain.
In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.
Amazon Data Services, Inc. acquired 590 acres in Jefferson Township, Ohio for $102.4 million in 2025 for a data center campus.
In 2024, Amazon Web Services (AWS) announced an investment of 15,700 million euros in Aragon over the next decade.
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
Amazon is building another data center in it's Innovation Drive campus.
Amazon seeks to build a new data center campus on 313 acres along Flippo Drive, east of I-95.
Amazon is expanding its data center footprint with plans for the Northeast Creek Technology Campus in Louisa County, Virginia.
Amazon is planning to build data centers near the Wilderness Battlefield in Orange County, Virginia, as part of a larger 2,600-acre development project.
Mapletree Sunview 1 is a six-storey build-to-suit (“BTS”) data centre with a gross floor area of about 242,000 square feet.
Amazon Data Services Pvt Ltd has sub-leased 4.51 lakh sq ft of plot in TTC industrial area in Bonsari in Airoli for a period of 15 years (starting in August 2023.)
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
Amazon is moving forward with plans for new data centers in Sydney, Australia. The data center will have an IT capacity of 40MW, and will be the company's second facility within the Smeaton Grange Park.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
Amazon AWS is building a $11bn data center campus in Indiana. Amazon acquired more than 600 acres of agricultural land around New Carlisle in St. Joseph County in 2023 using the shell company Razor5.
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
In 2022, Amazon Web Services (AWS) launched its Chandanvelly Campus, In Hyderabad. At full buildout the campus will span 66,000 sq m (710,000 sq ft).
Amazon is developing a massive data center campus called Lake Anna Tech Campus in Louisa County, Virginia.
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
Amazon is building a data center campus on a 50-acre site in Pharma City, Hyderabad.
The second building of Amazon's Pharma City campus is being built in two phases. The first phase was completed in 2022.
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
Amazon is building a data center campus on a 48-acre site in Fab City, Hyderabad.
The second building of Amazon's Fab City campus is being built in two phases. The first phase was completed in 2022.
Amazon plans to build another data center in Loudoun County.
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
Amazon Web Services (AWS) operates a 30,000 square foot (2,790 sq m) data center located in DeSoto, outside Dallas, Texas.
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
Amazon is building a five-building data center campus in New Albany, Ohio.
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
In 2021, Amazon Web Services (AWS) opened the AWS Asia Pacific (Jakarta) Region, located in Jakarta, Indonesia.
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
On October 10, 2023, the Board of Supervisors approved a rezoning to allow for the development of a 1.9 million square ft. data center campus on approximately 329 acres.
Amazon is planning to build a data center campus on a 56-acre plot along highway 101, between Leavesly Road and Gilman Road in the City of Gilroy, California.
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
Amazon has suspended plans for this data center in Becker, Minnesota.
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
Amazon Web Services (AWS) operates a data center facility in the Margamulya region of West Java, Indonesia.
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
Amazon Data Services, Inc. acquired 590 acres in Jefferson Township, Ohio for $102.4 million in 2025 for a data center campus.
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
Amazon is building a new $87 million data center in Portage. The location is confirmed as the AmeriPlex at the Port business park north of Interstate 94 and south of the Port of Indiana-Burns Harbor on Lake Michigan.
Amazon Data Services acquired 91 acres in Manassas for $218m
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
Amazon is building a two-building data center campus along Route 3 in Stevensburg, a town in Culpeper County, Northern Virginia.
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.