0.08 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
0.21 miles
|
PointInterested in this information?Contact us
|
|
|
0.21 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
1.61 miles
|
MetroInterested in this information?Contact us
|
|
|
1.68 miles
|
WestInterested in this information?Contact us
|
|
|
1.74 miles
|
Central PlazaInterested in this information?Contact us
|
|
|
1.83 miles
|
UltraInterested in this information?Contact us
|
|
|
4.09 miles
|
ProInterested in this information?Contact us
|
|
|
4.10 miles
|
Park GammaInterested in this information?Contact us
|
|
|
4.22 miles
|
GlobalInterested in this information?Contact us
|
|
|
4.23 miles
|
Core PlazaInterested in this information?Contact us
|
|
|
4.25 miles
|
West HubInterested in this information?Contact us
|
The site started construction in 2012.
|
|
4.50 miles
|
CentralInterested in this information?Contact us
|
|
|
4.82 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
5.75 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.81 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.83 miles
|
Tower TwoInterested in this information?Contact us
|
|
|
5.85 miles
|
BetaInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.90 miles
|
Ridge OneInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.91 miles
|
CenterInterested in this information?Contact us
|
|
|
5.95 miles
|
Metro HubInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.96 miles
|
Park ProInterested in this information?Contact us
|
|
|
5.97 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.98 miles
|
TowerInterested in this information?Contact us
|
|
|
6.00 miles
|
OneInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
6.04 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
6.04 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
6.10 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
6.18 miles
|
Point UltraInterested in this information?Contact us
|
|
|
12.92 miles
|
Metro PointInterested in this information?Contact us
|
|
|
13.02 miles
|
SouthInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
13.03 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
13.04 miles
|
MetroInterested in this information?Contact us
|
|
|
13.06 miles
|
CloudInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
13.06 miles
|
Campus PlusInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
13.08 miles
|
TwoInterested in this information?Contact us
|
|
|
13.20 miles
|
Park ThreeInterested in this information?Contact us
|
|
|
13.59 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.60 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.63 miles
|
TwoInterested in this information?Contact us
|
|
|
13.64 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
14.06 miles
|
Hub TwoInterested in this information?Contact us
|
|
|
14.10 miles
|
Central HubInterested in this information?Contact us
|
|
|
14.16 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
14.70 miles
|
Metro PointInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
14.73 miles
|
Point ProInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
14.94 miles
|
Park PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
14.97 miles
|
Hub ThreeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
15.25 miles
|
Cloud RidgeInterested in this information?Contact us
|
|
|
15.39 miles
|
Tower OneInterested in this information?Contact us
|
|
|
15.44 miles
|
PlazaInterested in this information?Contact us
|
|
|
15.56 miles
|
South TowerInterested in this information?Contact us
|
Construction started in 2012.
|
|
17.06 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
17.15 miles
|
Central TowerInterested in this information?Contact us
|
|
|
17.33 miles
|
TwoInterested in this information?Contact us
|
|
|
17.38 miles
|
Hub OneInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|