0.08 miles
|
Station UltraInterested in this information?Contact us
|
|
|
0.19 miles
|
Central PlazaInterested in this information?Contact us
|
|
|
0.23 miles
|
East RidgeInterested in this information?Contact us
|
|
|
1.66 miles
|
East ValleyInterested in this information?Contact us
|
|
|
1.73 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
1.79 miles
|
Metro StationInterested in this information?Contact us
|
|
|
1.87 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
4.16 miles
|
Campus TwoInterested in this information?Contact us
|
|
|
4.17 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
4.29 miles
|
Park AlphaInterested in this information?Contact us
|
|
|
4.30 miles
|
RidgeInterested in this information?Contact us
|
|
|
4.32 miles
|
CloudInterested in this information?Contact us
|
The site started construction in 2012.
|
|
4.57 miles
|
Cloud RidgeInterested in this information?Contact us
|
|
|
4.89 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
5.79 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.83 miles
|
Edge TowerInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.85 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
5.88 miles
|
Point AlphaInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.91 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
5.93 miles
|
Cloud ValleyInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.98 miles
|
Global ValleyInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.98 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
5.99 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.01 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
6.03 miles
|
GlobalInterested in this information?Contact us
|
|
|
6.03 miles
|
East TowerInterested in this information?Contact us
|
|
|
6.08 miles
|
Central TowerInterested in this information?Contact us
|
|
|
6.11 miles
|
SouthInterested in this information?Contact us
|
|
|
6.14 miles
|
Center TwoInterested in this information?Contact us
|
|
|
6.22 miles
|
Global RidgeInterested in this information?Contact us
|
|
|
12.84 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
12.94 miles
|
Global ParkInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
12.95 miles
|
East PlazaInterested in this information?Contact us
|
|
|
12.95 miles
|
Valley TwoInterested in this information?Contact us
|
|
|
12.97 miles
|
South CenterInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
12.98 miles
|
Station AlphaInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
12.99 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
13.12 miles
|
GammaInterested in this information?Contact us
|
|
|
13.51 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.52 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.53 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.55 miles
|
EdgeInterested in this information?Contact us
|
|
|
13.56 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
13.98 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
14.02 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
14.08 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
14.63 miles
|
CenterInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
14.66 miles
|
Center PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
14.86 miles
|
Ridge BetaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
14.89 miles
|
South TowerInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
15.17 miles
|
ThreeInterested in this information?Contact us
|
|
|
15.31 miles
|
East PlazaInterested in this information?Contact us
|
|
|
15.35 miles
|
GlobalInterested in this information?Contact us
|
|
|
15.48 miles
|
Valley OneInterested in this information?Contact us
|
Construction started in 2012.
|
|
16.97 miles
|
West ValleyInterested in this information?Contact us
|
|
|
17.07 miles
|
Tower OneInterested in this information?Contact us
|
|
|
17.25 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
17.30 miles
|
Prime ParkInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|