0.04 miles
|
Station TwoInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.06 miles
|
Hub AlphaInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
0.16 miles
|
Plaza ProInterested in this information?Contact us
|
|
|
0.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.67 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.71 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.77 miles
|
Station ProInterested in this information?Contact us
|
|
|
0.82 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.85 miles
|
Valley ProInterested in this information?Contact us
|
|
|
0.92 miles
|
Plaza BetaInterested in this information?Contact us
|
|
|
0.94 miles
|
East TowerInterested in this information?Contact us
|
|
|
0.94 miles
|
Hub PrimeInterested in this information?Contact us
|
|
|
1.10 miles
|
North ValleyInterested in this information?Contact us
|
|
|
1.11 miles
|
East PlazaInterested in this information?Contact us
|
|
|
1.23 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
2.44 miles
|
SouthInterested in this information?Contact us
|
|
|
2.54 miles
|
TwoInterested in this information?Contact us
|
|
|
2.60 miles
|
CoreInterested in this information?Contact us
|
|
|
2.68 miles
|
WestInterested in this information?Contact us
|
Construction started in 2012.
|
|
2.97 miles
|
Ridge PrimeInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
3.05 miles
|
Plaza PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
3.07 miles
|
PlazaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
3.15 miles
|
StationInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
4.13 miles
|
PrimeInterested in this information?Contact us
|
|
|
4.24 miles
|
PlazaInterested in this information?Contact us
|
|
|
4.39 miles
|
North ParkInterested in this information?Contact us
|
|
|
4.46 miles
|
GlobalInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|
|
9.80 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.87 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
10.03 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
|
|
12.37 miles
|
Metro TowerInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.42 miles
|
Park PlusInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.52 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.59 miles
|
Point BetaInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.66 miles
|
East ValleyInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.82 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.92 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
12.94 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
13.02 miles
|
CoreInterested in this information?Contact us
|
|
|
13.02 miles
|
North StationInterested in this information?Contact us
|
|
|
13.51 miles
|
Edge StationInterested in this information?Contact us
|
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
|
|
14.16 miles
|
Point AlphaInterested in this information?Contact us
|
|
|
14.18 miles
|
HubInterested in this information?Contact us
|
|
|
14.19 miles
|
West ParkInterested in this information?Contact us
|
|
|
14.22 miles
|
BetaInterested in this information?Contact us
|
|
|
14.71 miles
|
Rowan Percheron
|
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
|
|
16.26 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.31 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.35 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.38 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.70 miles
|
GlobalInterested in this information?Contact us
|
|
|
16.72 miles
|
Park BetaInterested in this information?Contact us
|
|
|
16.73 miles
|
OneInterested in this information?Contact us
|
|
|
16.75 miles
|
WestInterested in this information?Contact us
|
|
|
16.82 miles
|
UltraInterested in this information?Contact us
|
|
|
16.82 miles
|
TowerInterested in this information?Contact us
|
|
|
16.87 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
16.88 miles
|
StationInterested in this information?Contact us
|
|
|
16.94 miles
|
South ValleyInterested in this information?Contact us
|
The site started construction in 2012.
|
|
17.05 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
17.44 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
18.61 miles
|
East CenterInterested in this information?Contact us
|
|
|
18.70 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
18.75 miles
|
CampusInterested in this information?Contact us
|
|
|
18.84 miles
|
MaxInterested in this information?Contact us
|
|