Cloud ValleyInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Co. Dublin, D22 T2P7, Ireland
Operational
Fully operational facility
Operated by:

Amazon: DUB079

Site: Prime TowerInterested in this information?Contact us
Short Code: Building B
Year Built: 2025
Floors: 3
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm. The associated structures include water tanks, sprinkler tanks, pump house, and prefabricated containerized electrical rooms located within the center of the site, as well as a temporary substation and utility connections to the boundary of the site.

  • The first two-storey data center (Building A), completed in 2024, is located to the south-west of the site and has a gross floor area of 28,573 sqm. It includes 26 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that are 25m in height. The facility also includes 26 ventilation shafts located above the northern end of each emergency generator, measuring 20m in height.

  • The second two-storey data center (Building B) will be located to the north-west of the site, immediately north of Building A, and will have a gross floor area of 21,725 sqm. It will include 18 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts located above the southern end of each emergency generator, measuring 20m in height.

  • The last two-storey data center (Building C) will be constructed last and will be located in the eastern part of the site on a north-south axis, with a gross floor area of 28,573 sqm. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts located above the western end of each emergency generator, measuring 20m in height.

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Central TowerInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edge RidgeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Edge StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Cloud PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Station TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us CyrusOne: DUB1 Bldg 2
Second data centre block on CyrusOne's Grange Castle DUB1 campus (Building B under SD18A/0134), on a cleared pad east of Building 1. Permission extended in 2023; construction not started.
NN milesInterested in this information?Contact us CyrusOne: DUB1 Bldg 1
First building on CyrusOne's Grange Castle DUB1 campus: a two-storey data centre with an attached three-storey office block on Conchobar Murray Avenue, built 2019-2021 by Structure Tone, with 16 standby generators and rooftop solar.
NN milesInterested in this information?Contact us StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us CyrusOne: DUB1 Bldg 3
Third building that CyrusOne markets for its Grange Castle DUB1 campus. No planning application for it has been found as of October 2026.
NN milesInterested in this information?Contact us Edge ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read Amazon Pledges €16B For Germany In 2027, Including €4.8B For AWS Frankfurt
Amazon plans to invest more than €16 billion ($18 billion) in Germany in 2027, including €4.8 billion to expand the [AWS Europe (Frankfurt) region](https://press.aboutamazon.com/de/2026/10/invest-i...

Amazon Pledges €16B For Germany In 2027, Including €4.8B For AWS Frankfurt

October 21, 2026 Amazon AWS

Amazon plans to invest more than €16 billion ($18 billion) in Germany in 2027, including €4.8 billion to expand the AWS Europe (Frankfurt) region, the company said on Oct. 20. Chancellor Friedrich Merz and federal economy and energy minister Katherina Reiche appeared with Amazon chief global...

Read more
Read Amazon Drops 800,000 Sq Ft Data Center Campus In Loudoun County Deal
Amazon Data Services has withdrawn its application to build four data centers on the former George Washington University campus in Ashburn, Virginia, ending a months-long standoff with Loudoun Coun...

Amazon Drops 800,000 Sq Ft Data Center Campus In Loudoun County Deal

October 21, 2026 Amazon AWS

Amazon Data Services has withdrawn its application to build four data centers on the former George Washington University campus in Ashburn, Virginia, ending a months-long standoff with Loudoun County. Officials announced the agreement, called Project Potomac Promise, at the Oct. 20 Board of...

Read more
Read AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana
X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the...

AEP And X-energy Study 960MW SMR Plant To Power Amazon In Indiana

October 20, 2026 Amazon AWS

X-energy and American Electric Power will study a 960 MW advanced nuclear plant at a retired coal station in Sullivan County, Indiana, with Amazon funding development work and positioned to buy the plant's output. The companies announced a joint development agreement on Oct. 19 covering...

Read more
Read AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus
Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land D...

AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus

October 07, 2026 Amazon AWS

Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land Development Plan with the Indiana County planning commission on August 28 under the project name...

Read more
Read AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania
Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussin...

AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania

October 07, 2026 Amazon AWS

Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussing potential development with Homer City Redevelopment. The proposed campus will span 1,100 acres...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?