0.03 miles
|
Point ProInterested in this information?Contact us
|
|
|
0.17 miles
|
HubInterested in this information?Contact us
|
The site started construction in 2012.
|
|
0.22 miles
|
South PlazaInterested in this information?Contact us
|
|
|
0.25 miles
|
Center GammaInterested in this information?Contact us
|
|
|
0.58 miles
|
BetaInterested in this information?Contact us
|
|
|
0.75 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
1.79 miles
|
ProInterested in this information?Contact us
|
|
|
1.88 miles
|
CenterInterested in this information?Contact us
|
|
|
1.93 miles
|
North ParkInterested in this information?Contact us
|
|
|
2.02 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
2.60 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
2.63 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
2.65 miles
|
ValleyInterested in this information?Contact us
|
|
|
2.67 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
4.10 miles
|
Edge PointInterested in this information?Contact us
|
|
|
4.17 miles
|
TowerInterested in this information?Contact us
|
|
|
4.20 miles
|
East CenterInterested in this information?Contact us
|
|
|
4.28 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.08 miles
|
Metro TowerInterested in this information?Contact us
|
|
|
7.12 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.12 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.15 miles
|
North RidgeInterested in this information?Contact us
|
|
|
7.22 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
7.31 miles
|
RidgeInterested in this information?Contact us
|
|
|
7.33 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.35 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.13 miles
|
Point UltraInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.21 miles
|
Center PrimeInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.26 miles
|
Cloud CenterInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.34 miles
|
HubInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
16.81 miles
|
Global StationInterested in this information?Contact us
|
|
|
16.81 miles
|
Station TwoInterested in this information?Contact us
|
|
|
16.82 miles
|
Station BetaInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.84 miles
|
Ridge BetaInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.86 miles
|
Metro ValleyInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.91 miles
|
Metro HubInterested in this information?Contact us
|
|
|
16.95 miles
|
WestInterested in this information?Contact us
|
|
|
17.08 miles
|
Point GammaInterested in this information?Contact us
|
|
|
17.41 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.44 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.47 miles
|
North HubInterested in this information?Contact us
|
|
|
17.49 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.89 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
17.92 miles
|
East CampusInterested in this information?Contact us
|
|
|
18.00 miles
|
CentralInterested in this information?Contact us
|
|
|
18.69 miles
|
Park PlusInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
18.72 miles
|
South CampusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.92 miles
|
Center BetaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.95 miles
|
Center OneInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.13 miles
|
ParkInterested in this information?Contact us
|
|
|
19.26 miles
|
Core StationInterested in this information?Contact us
|
|
|
19.31 miles
|
West PointInterested in this information?Contact us
|
|
|
19.42 miles
|
TwoInterested in this information?Contact us
|
Construction started in 2012.
|