|
0.10 miles
|
GammaInterested in this information?Contact us
|
|
|
0.11 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
0.17 miles
|
StationInterested in this information?Contact us
|
|
|
0.75 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.77 miles
|
PointInterested in this information?Contact us
|
|
|
0.81 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.86 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.91 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.94 miles
|
SouthInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.94 miles
|
MaxInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
1.00 miles
|
Hub GammaInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
1.10 miles
|
CenterInterested in this information?Contact us
|
|
|
1.19 miles
|
Tower TwoInterested in this information?Contact us
|
|
|
1.25 miles
|
West PointInterested in this information?Contact us
|
|
|
1.30 miles
|
CoreInterested in this information?Contact us
|
|
|
2.22 miles
|
EdgeInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
2.23 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
2.29 miles
|
Station ProInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.37 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
2.37 miles
|
Cloud StationInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.41 miles
|
TowerInterested in this information?Contact us
|
|
|
2.43 miles
|
CloudInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.54 miles
|
Park AlphaInterested in this information?Contact us
|
Construction started in 2012.
|
|
4.03 miles
|
Ridge UltraInterested in this information?Contact us
|
|
|
4.12 miles
|
PointInterested in this information?Contact us
|
|
|
4.30 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
4.35 miles
|
Tower PlusInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|
|
9.65 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.80 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.89 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
|
|
11.95 miles
|
Tower ThreeInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
11.99 miles
|
PlusInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.17 miles
|
SouthInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.24 miles
|
ParkInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.44 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.53 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.64 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.74 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.91 miles
|
TwoInterested in this information?Contact us
|
|
|
12.95 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
13.01 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
13.03 miles
|
SouthInterested in this information?Contact us
|
|
|
13.46 miles
|
Core RidgeInterested in this information?Contact us
|
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
|
|
14.17 miles
|
Rowan Percheron
|
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
|
|
14.24 miles
|
MetroInterested in this information?Contact us
|
|
|
14.26 miles
|
Global RidgeInterested in this information?Contact us
|
|
|
14.28 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
14.31 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
15.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.00 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.05 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.06 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.40 miles
|
Edge StationInterested in this information?Contact us
|
|
|
16.41 miles
|
StationInterested in this information?Contact us
|
|
|
16.43 miles
|
North ParkInterested in this information?Contact us
|
|
|
16.44 miles
|
Center AlphaInterested in this information?Contact us
|
|
|
16.91 miles
|
Campus GammaInterested in this information?Contact us
|
|
|
16.92 miles
|
AlphaInterested in this information?Contact us
|
|
|
16.98 miles
|
Global PointInterested in this information?Contact us
|
|
|
16.98 miles
|
Prime PointInterested in this information?Contact us
|
|
|
17.04 miles
|
Hub TwoInterested in this information?Contact us
|
The site started construction in 2012.
|
|
17.17 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
17.55 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
18.70 miles
|
MaxInterested in this information?Contact us
|
|
|
18.79 miles
|
UltraInterested in this information?Contact us
|
|
|
18.84 miles
|
Metro HubInterested in this information?Contact us
|
|
|
18.93 miles
|
Hub MaxInterested in this information?Contact us
|
|