Amazon: Warrenton, VA

Lot Size: 42 acres

Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.

  • In April 2024, Warrenton town staff approved the site development plan for Amazon's proposed 220,000-square-foot data center campus.
  • The 42 acre parcel located at 719 Blackwell Road, slated for a data center campus, was purchased by Amazon Web Services, Inc. in September 2021 for nearly $40 million.
  • The 37-foot-tall building would be approximately 1,500 feet from the closest residence with “ample landscaping” that would shield the facility from the east and west.
  • Fauquier County and 10 local residents have filed a lawsuit in the Fauquier Circuit Court to try to stop an Amazon data center in Warrenton, Northern Virginia.

Map and Nearby Locations:

This Facility
Amazon AWS Sites
Nearby Facilities

Sites within 15 miles of Cloud Campus

Distance Site About
2.55 miles Maple Tree Farm
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
5.60 miles Vint Hill Corners
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
6.12 miles OVH: Vint Hill Bldg 2
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
6.22 miles OVH US East Vint Hill
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
6.41 miles CyrusOne: Vint Hill
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
9.35 miles Hyperscale Data Center Request Dataset
9.42 miles Hyperscale Data Center Request Dataset
9.47 miles Hyperscale Data Center Request Dataset
9.56 miles Hyperscale Data Center Request Dataset
9.56 miles Headwaters: Catlett, VA
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
10.11 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
10.17 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
10.25 miles Hyperscale Data Center Request Dataset
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
10.26 miles Hyperscale Data Center Request Dataset
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
10.28 miles Hyperscale Data Center Request Dataset
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
10.28 miles Hyperscale Data Center Request Dataset
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
10.57 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
10.59 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
10.64 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
10.68 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
10.72 miles NTT Gainesville VA Campus
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
10.80 miles 8217 Linton Hall (VA4) Digital Realty
10.90 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
11.31 miles Yondr: Bristow Bldg 2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
11.50 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
11.61 miles Hyperscale Data Center Request Dataset
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
11.68 miles Hyperscale Data Center Request Dataset
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
11.69 miles Hyperscale Data Center Request Dataset
11.82 miles Hyperscale Data Center Request Dataset
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
11.87 miles Hyperscale Data Center Request Dataset
11.89 miles Hyperscale Data Center Request Dataset
11.89 miles Hyperscale Data Center Request Dataset
11.94 miles Hyperscale Data Center Request Dataset
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
11.99 miles Hyperscale Data Center Request Dataset
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
12.01 miles Hyperscale Data Center Request Dataset
12.01 miles Hyperscale Data Center Request Dataset
12.02 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
12.13 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
12.15 miles Corscale: Gainesville Crossing
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
12.17 miles Hyperscale Data Center Request Dataset
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
12.18 miles Hyperscale Data Center Request Dataset
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
12.24 miles Hyperscale Data Center Request Dataset
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
12.32 miles Hyperscale Data Center Request Dataset
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
12.37 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
12.43 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
12.46 miles Convergent Technology Park
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
12.69 miles SAMX data center campus
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
12.75 miles Hyperscale Data Center Request Dataset
12.80 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
12.81 miles Hyperscale Data Center Request Dataset
13.07 miles Stack: NVA02H
This facility is part of Stack's NVA02 Campus in Northern Virginia.
13.10 miles Stack: Bristow Campus (NVA02K)
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
13.13 miles PointOne: Remington Expansion
13.16 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
13.18 miles Stack: NVA02J
This facility is part of Stack's NVA02 Campus in Northern Virginia.
13.19 miles Stack: NVA02I
This facility is part of Stack's NVA02 Campus in Northern Virginia.
13.28 miles PointOne: Remington Technology Park
In March 2018, Alberta-based PointOne Holdings Inc. received approval to rezone 234 acres on Lucky Hill Road, Remington, for a data center project.
13.29 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
13.33 miles Hyperscale Data Center Request Dataset
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
13.37 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
13.41 miles Iron Mountain VA-2
13.41 miles Opus Interactive Manassas
13.42 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
13.47 miles Stack: NVA02E
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
13.50 miles Stack: NVA02F
This facility is part of Stack's NVA02 Campus in Northern Virginia.
13.52 miles Stack: NVA02G
This facility is part of Stack's NVA02 Campus in Northern Virginia.
13.54 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
13.55 miles Hyperscale Data Center Request Dataset
13.55 miles Hyperscale Data Center Request Dataset
13.57 miles Hyperscale Data Center Request Dataset
13.57 miles Hyperscale Data Center Request Dataset
13.57 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
13.58 miles Gigaland: Remington, VA
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
13.58 miles Stack: NVA02D
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
13.62 miles Hyperscale Data Center Request Dataset
13.63 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
13.64 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
13.69 miles Hyperscale Data Center Request Dataset
13.72 miles Stack: Northern Virginia, NVA02
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
13.72 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
13.75 miles Stack: NVA02B
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
13.76 miles Stack: NVA02C
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
13.76 miles Hyperscale Data Center Request Dataset
13.82 miles Hyperscale Data Center Request Dataset
13.84 miles Hyperscale Data Center Request Dataset
13.84 miles Evoswitch USA WDC 1
13.84 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
13.84 miles VAZATA Northern Virginia (NoVa One)
13.89 miles Hyperscale Data Center Request Dataset
13.92 miles Hyperscale Data Center Request Dataset
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
13.95 miles Hyperscale Data Center Request Dataset
13.96 miles Hyperscale Data Center Request Dataset
13.98 miles Hyperscale Data Center Request Dataset
13.99 miles Hyperscale Data Center Request Dataset
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
14.05 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
14.09 miles Hyperscale Data Center Request Dataset
14.23 miles Hyperscale Data Center Request Dataset
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
14.25 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
14.40 miles Hyperscale Data Center Request Dataset
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
14.45 miles Hyperscale Data Center Request Dataset
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
14.46 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
14.53 miles Hyperscale Data Center Request Dataset
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
14.56 miles Hyperscale Data Center Request Dataset
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
14.58 miles Hyperscale Data Center Request Dataset
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
14.61 miles Hyperscale Data Center Request Dataset
14.66 miles Hyperscale Data Center Request Dataset
Amazon is building another data center in it's Innovation Drive campus.
14.66 miles QTS Manassas DC5
This facility is part of QTS Data Center Campus in Manassas.
14.67 miles Hyperscale Data Center Request Dataset
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
14.68 miles Hyperscale Data Center Request Dataset
14.69 miles Stack: Northern Virginia NVA05
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
14.74 miles QTS: Manassas DC4
14.76 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
14.83 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
14.83 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
14.85 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
14.86 miles Hyperscale Data Center Request Dataset
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
14.87 miles QTS Manassas DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
14.88 miles QTS Manassas DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
14.91 miles QTS: Manassas DC2
This facility is part of QTS Data Center Campus in Manassas.
14.95 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
14.96 miles TPC: Manassas, VA
15.00 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
15.00 miles QTS: Manassas DC3
This facility is part of QTS Data Center Campus in Manassas.
15.02 miles Hyperscale Data Center Request Dataset
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
15.04 miles Digital Realty: IAD50
15.07 miles CloudHQ: Manassas MDC Campus
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
15.08 miles Digital Realty: IAD51
15.13 miles Hyperscale Data Center Request Dataset
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
15.15 miles Hyperscale Data Center Request Dataset
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
15.17 miles Hyperscale Data Center Request Dataset
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
15.27 miles Hyperscale Data Center Request Dataset
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
15.29 miles Hyperscale Data Center Request Dataset
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
15.30 miles Digital Realty: 9905 Godwin
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
15.43 miles Hyperscale Data Center Request Dataset
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
15.43 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
15.55 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
15.55 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
15.55 miles CloudHQ Manassas MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
15.69 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
15.70 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
15.72 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
15.72 miles Verizon: 7777 Infantry Ridge
Former AOL data center
15.75 miles Equinix Manassas DC14
15.80 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
15.83 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
15.92 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
15.93 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
17.66 miles XX Tech Park
The proposed XX Tech Park rezoning could include over 4.6 million square feet of data centers in an area characterized by working farmland, less than a mile from the new State Park at Culpeper Battlefields.
19.42 miles Hyperscale Data Center Request Dataset
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
19.44 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
19.47 miles Hyperscale Data Center Request Dataset
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
19.51 miles Hyperscale Data Center Request Dataset
Amazon Data Services acquired 91 acres in Manassas for $218m
19.53 miles Hyperscale Data Center Request Dataset
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
19.56 miles Hyperscale Data Center Request Dataset
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
19.58 miles Hyperscale Data Center Request Dataset
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
19.60 miles Hyperscale Data Center Request Dataset
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
19.61 miles Hyperscale Data Center Request Dataset
19.74 miles Hyperscale Data Center Request Dataset
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
19.77 miles Hyperscale Data Center Request Dataset
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
19.81 miles Yondr Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
19.83 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
19.89 miles Yondr Arcola, VA
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.

North Park Data Center Photos (See all)

An aerial rendering of the AWS Warrenton Data Center
Source: Bohler Engineering
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

564
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?