|
0.09 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
0.16 miles
|
EdgeInterested in this information?Contact us
|
|
|
0.24 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
0.38 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.42 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.46 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.51 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.52 miles
|
CloudInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.54 miles
|
Edge RidgeInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.77 miles
|
PointInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.78 miles
|
TowerInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.99 miles
|
EdgeInterested in this information?Contact us
|
|
|
6.06 miles
|
Station PlusInterested in this information?Contact us
|
|
|
6.18 miles
|
Central StationInterested in this information?Contact us
|
|
|
6.22 miles
|
Hub BetaInterested in this information?Contact us
|
|
|
6.91 miles
|
Global ParkInterested in this information?Contact us
|
|
|
6.99 miles
|
East PointInterested in this information?Contact us
|
|
|
7.06 miles
|
OneInterested in this information?Contact us
|
|
|
7.15 miles
|
South CampusInterested in this information?Contact us
|
|
|
7.28 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
7.31 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
7.45 miles
|
Edge ValleyInterested in this information?Contact us
|
The site started construction in 2012.
|
|
7.53 miles
|
CloudInterested in this information?Contact us
|
|
|
7.56 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
7.88 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
7.89 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
7.97 miles
|
EdgeInterested in this information?Contact us
|
|
|
7.98 miles
|
UltraInterested in this information?Contact us
|
|
|
7.99 miles
|
West HubInterested in this information?Contact us
|
|
|
8.02 miles
|
Campus ProInterested in this information?Contact us
|
|
|
16.35 miles
|
Metro RidgeInterested in this information?Contact us
|
|
|
16.44 miles
|
Cloud CenterInterested in this information?Contact us
|
|
|
16.52 miles
|
Hub ProInterested in this information?Contact us
|
|
|
16.61 miles
|
CentralInterested in this information?Contact us
|
|
|
16.75 miles
|
Park ProInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.79 miles
|
Center ProInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.80 miles
|
Tower ProInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.82 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
17.17 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.17 miles
|
CentralInterested in this information?Contact us
|
|
|
17.18 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.20 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.21 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.52 miles
|
Global HubInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.52 miles
|
Ridge UltraInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
17.61 miles
|
Global CenterInterested in this information?Contact us
|
|
|
17.68 miles
|
West HubInterested in this information?Contact us
|
|
|
17.69 miles
|
Cloud PointInterested in this information?Contact us
|
|
|
17.77 miles
|
TwoInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.77 miles
|
WestInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.56 miles
|
Cloud CenterInterested in this information?Contact us
|
|
|
18.71 miles
|
PointInterested in this information?Contact us
|
|
|
18.73 miles
|
Station UltraInterested in this information?Contact us
|
|
|
18.89 miles
|
ParkInterested in this information?Contact us
|
Construction started in 2012.
|