0.10 miles
|
Prime PointInterested in this information?Contact us
|
|
|
0.87 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
0.90 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
0.94 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
1.12 miles
|
West PlazaInterested in this information?Contact us
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
|
1.33 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
1.35 miles
|
RidgeInterested in this information?Contact us
|
|
|
1.35 miles
|
Point BetaInterested in this information?Contact us
|
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
|
|
1.37 miles
|
East CampusInterested in this information?Contact us
|
|
|
1.45 miles
|
Station MaxInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
1.57 miles
|
MetroInterested in this information?Contact us
|
|
|
1.58 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
1.67 miles
|
Prime RidgeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
1.74 miles
|
East ParkInterested in this information?Contact us
|
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
|
1.76 miles
|
East TowerInterested in this information?Contact us
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
|
1.78 miles
|
Campus MaxInterested in this information?Contact us
|
|
|
1.82 miles
|
Opus Interactive Manassas
|
|
|
1.85 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
1.85 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
1.86 miles
|
AlphaInterested in this information?Contact us
|
|
|
1.86 miles
|
Iron Mountain VA-2
|
|
|
1.87 miles
|
PrimeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
1.93 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
1.93 miles
|
ProInterested in this information?Contact us
|
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
|
1.96 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
1.98 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
2.01 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
2.01 miles
|
Cloud CenterInterested in this information?Contact us
|
|
|
2.01 miles
|
Plaza MaxInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
2.02 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
2.03 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
2.10 miles
|
HubInterested in this information?Contact us
|
|
|
2.13 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
2.16 miles
|
Prime HubInterested in this information?Contact us
|
|
|
2.17 miles
|
ThreeInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
2.21 miles
|
Stack: NVA02H
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.24 miles
|
Metro ValleyInterested in this information?Contact us
|
|
|
2.27 miles
|
Station MaxInterested in this information?Contact us
|
|
|
2.29 miles
|
Stack: NVA02I
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.34 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
2.35 miles
|
Data Center Edge District
|
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
|
|
2.37 miles
|
Stack: NVA02G
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.38 miles
|
Stack: NVA02J
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.41 miles
|
ValleyInterested in this information?Contact us
|
|
|
2.42 miles
|
Stack: NVA02E
|
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
|
|
2.43 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
2.45 miles
|
Core PlazaInterested in this information?Contact us
|
|
|
2.47 miles
|
Stack: NVA02D
|
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
|
|
2.51 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
2.53 miles
|
Stack: NVA02F
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.54 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
2.56 miles
|
Stack: Bristow Campus (NVA02K)
|
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
|
|
2.58 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
2.59 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
2.62 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
2.66 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
2.67 miles
|
Corscale: Gainesville Crossing
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
2.68 miles
|
Evoswitch USA WDC 1
|
|
|
2.68 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
2.68 miles
|
East HubInterested in this information?Contact us
|
|
|
2.68 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
2.68 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
2.69 miles
|
Stack: NVA02C
|
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
|
|
2.71 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
|
2.74 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
|
2.79 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
2.86 miles
|
Core PointInterested in this information?Contact us
|
|
|
2.86 miles
|
East CampusInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
2.88 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
2.91 miles
|
Hub PrimeInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
2.91 miles
|
Park GammaInterested in this information?Contact us
|
|
|
2.92 miles
|
Hub OneInterested in this information?Contact us
|
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
|
3.07 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
3.10 miles
|
Global TowerInterested in this information?Contact us
|
|
|
3.14 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
3.16 miles
|
Center GammaInterested in this information?Contact us
|
|
|
3.19 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
3.21 miles
|
CentralInterested in this information?Contact us
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
|
3.22 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
3.22 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
3.25 miles
|
HubInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
|
3.26 miles
|
QTS Manassas DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.26 miles
|
West CenterInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
3.29 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
3.31 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
3.33 miles
|
HubInterested in this information?Contact us
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
|
3.36 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
3.37 miles
|
Park ThreeInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
3.38 miles
|
Core CampusInterested in this information?Contact us
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
|
3.40 miles
|
South StationInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
3.41 miles
|
TPC: Manassas, VA
|
|
|
3.42 miles
|
Park BetaInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
|
3.42 miles
|
QTS: Manassas DC4
|
|
|
3.46 miles
|
UltraInterested in this information?Contact us
|
Amazon is building another data center in it's Innovation Drive campus.
|
|
3.46 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
3.48 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
3.49 miles
|
East HubInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
3.51 miles
|
QTS Manassas DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
3.52 miles
|
HubInterested in this information?Contact us
|
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
|
3.54 miles
|
Valley UltraInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
3.55 miles
|
QTS: Manassas DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.58 miles
|
QTS Manassas DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
3.59 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
3.63 miles
|
QTS: Manassas DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
3.64 miles
|
Plaza GammaInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
3.82 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
|
3.89 miles
|
NorthInterested in this information?Contact us
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
|
4.05 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
4.08 miles
|
Digital Realty: IAD50
|
|
|
4.16 miles
|
Digital Realty: IAD51
|
|
|
4.19 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
4.24 miles
|
Digital Realty: 9905 Godwin
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
4.27 miles
|
WestInterested in this information?Contact us
|
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
|
|
4.31 miles
|
Cloud HubInterested in this information?Contact us
|
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
|
|
4.33 miles
|
North ParkInterested in this information?Contact us
|
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
|
|
4.35 miles
|
CloudHQ: Manassas MDC Campus
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
4.37 miles
|
Hub GammaInterested in this information?Contact us
|
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
|
|
4.45 miles
|
Hub PrimeInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
4.45 miles
|
Equinix Manassas DC14
|
|
|
4.47 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
4.56 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
4.56 miles
|
StationInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
4.60 miles
|
Campus UltraInterested in this information?Contact us
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
|
4.96 miles
|
CloudHQ: MCC7
|
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
|
|
5.05 miles
|
CloudHQ MCC2
|
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
|
|
5.23 miles
|
CyrusOne: Vint Hill
|
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
|
|
5.23 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
5.28 miles
|
CloudHQ Manassas MCC1
|
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
|
|
5.35 miles
|
CloudHQ: MCC4
|
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
|
|
5.40 miles
|
OVH US East Vint Hill
|
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
|
|
5.41 miles
|
CloudHQ MCC3
|
CloudHQ MCC3 is a part of The MCC data center campus.
|
|
5.43 miles
|
Prime StationInterested in this information?Contact us
|
|
|
5.43 miles
|
PrimeInterested in this information?Contact us
|
|
|
5.46 miles
|
Core TowerInterested in this information?Contact us
|
|
|
5.46 miles
|
CloudHQ: MCC6Z
|
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
|
|
5.50 miles
|
OVH: Vint Hill Bldg 2
|
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
|
|
5.50 miles
|
CloudHQ: MCC5
|
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
|
|
5.55 miles
|
CloudHQ: MCC6A
|
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
|
|
5.79 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
6.01 miles
|
Vint Hill Corners
|
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
|
|
7.71 miles
|
Headwaters: Catlett, VA
|
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
|
|
9.70 miles
|
Parkstone Tech Park
|
|
|
10.94 miles
|
Hub GammaInterested in this information?Contact us
|
Amazon Data Services acquired 91 acres in Manassas for $218m
|
|
11.32 miles
|
Station GammaInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
11.36 miles
|
Global StationInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
11.40 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
11.40 miles
|
Core TowerInterested in this information?Contact us
|
|
|
11.44 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
11.45 miles
|
WestInterested in this information?Contact us
|
|
|
11.46 miles
|
West CampusInterested in this information?Contact us
|
|
|
11.47 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
11.48 miles
|
Metro RidgeInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
11.49 miles
|
GlobalInterested in this information?Contact us
|
|
|
11.50 miles
|
Park TwoInterested in this information?Contact us
|
|
|
11.54 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
11.61 miles
|
TwoInterested in this information?Contact us
|
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
|
|
11.67 miles
|
BetaInterested in this information?Contact us
|
|
|
11.69 miles
|
Station MaxInterested in this information?Contact us
|
|
|
11.72 miles
|
PointInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
11.77 miles
|
TwoInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
11.82 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
11.82 miles
|
Edge RidgeInterested in this information?Contact us
|
|
|
11.91 miles
|
Park OneInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
11.91 miles
|
West HubInterested in this information?Contact us
|
|
|
11.93 miles
|
Maple Tree Farm
|
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
|
|
11.98 miles
|
PrimeInterested in this information?Contact us
|
|
|
12.00 miles
|
SouthInterested in this information?Contact us
|
|
|
12.07 miles
|
South TowerInterested in this information?Contact us
|
|
|
12.11 miles
|
South StationInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
12.37 miles
|
BetaInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
12.45 miles
|
CloudInterested in this information?Contact us
|
|
|
12.49 miles
|
PrimeInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
12.55 miles
|
Quantico Ridge Data Center
|
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
|
|
12.56 miles
|
Tower OneInterested in this information?Contact us
|
|
|
12.58 miles
|
PowerHouse Arcola
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
12.62 miles
|
PowerHouse: Arcola Bldg B
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
12.66 miles
|
PointInterested in this information?Contact us
|
|
|
12.68 miles
|
Metro CampusInterested in this information?Contact us
|
|
|
12.68 miles
|
CentralInterested in this information?Contact us
|
|
|
12.74 miles
|
Plaza MaxInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
12.74 miles
|
West ValleyInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
12.75 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
12.76 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
12.78 miles
|
Center PrimeInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
12.83 miles
|
Yondr Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
12.86 miles
|
PlusInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
12.87 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
12.87 miles
|
MetroInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
12.90 miles
|
Core ParkInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
12.90 miles
|
Yondr Arcola, VA
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
12.93 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
12.99 miles
|
Point MaxInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
13.02 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
13.08 miles
|
Core ValleyInterested in this information?Contact us
|
|
|
13.13 miles
|
North RidgeInterested in this information?Contact us
|
|
|
13.20 miles
|
UltraInterested in this information?Contact us
|
|
|
13.28 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
13.37 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
13.52 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
13.57 miles
|
Ridge OneInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
13.59 miles
|
Core ParkInterested in this information?Contact us
|
|
|
13.60 miles
|
West HubInterested in this information?Contact us
|
|
|
13.71 miles
|
BetaInterested in this information?Contact us
|
|
|
13.76 miles
|
Stack: Loudoun County Campus
|
Stack Infrastructure is further expanding in Virginia with a new 122-acre campus in Loudoun County, near Dulles Airport.
|
|
13.81 miles
|
Stack: Loudoun 2
|
This facility is part of Stack's Loudoun County Campus is Virginia.
|
|
13.92 miles
|
ThreeInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
13.93 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
13.93 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
13.97 miles
|
MaxInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
13.98 miles
|
CyrusOne: NVA9 Bldg 1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
14.03 miles
|
CyrusOne: NVA9 Bldg 2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
14.04 miles
|
PointInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
14.24 miles
|
Core CenterInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
14.26 miles
|
Prime StationInterested in this information?Contact us
|
|
|
14.30 miles
|
East RidgeInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
14.30 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
14.36 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
14.38 miles
|
Core TowerInterested in this information?Contact us
|
|
|
14.43 miles
|
PlusInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
14.47 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
14.49 miles
|
Station BetaInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
15.48 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.54 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.58 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
15.63 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.09 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
16.59 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
16.64 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
16.88 miles
|
CoreSite Reston VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
16.94 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
16.94 miles
|
44351 Import Plz
|
|
|
16.94 miles
|
StationInterested in this information?Contact us
|
|
|
16.95 miles
|
Import Plz, Ashburn
|
|
|
16.97 miles
|
TwoInterested in this information?Contact us
|
|
|
16.98 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
17.00 miles
|
EdgeInterested in this information?Contact us
|
|
|
17.00 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
17.00 miles
|
Edge StationInterested in this information?Contact us
|
|
|
17.00 miles
|
Cloud RidgeInterested in this information?Contact us
|
|
|
17.01 miles
|
West StationInterested in this information?Contact us
|
|
|
17.01 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
17.04 miles
|
QTS Ashburn-Shellhorn
|
|
|
17.04 miles
|
Metro CenterInterested in this information?Contact us
|
|
|
17.05 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
17.09 miles
|
Station ProInterested in this information?Contact us
|
|
|
17.10 miles
|
EastInterested in this information?Contact us
|
|
|
17.12 miles
|
QTS Ashburn-Shellhorn DC2
|
|
|
17.13 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
17.14 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
17.14 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
17.15 miles
|
Valley GammaInterested in this information?Contact us
|
|
|
17.15 miles
|
West HubInterested in this information?Contact us
|
|
|
17.17 miles
|
Metro ValleyInterested in this information?Contact us
|
|
|
17.17 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
17.17 miles
|
Central PointInterested in this information?Contact us
|
|
|
17.17 miles
|
PointInterested in this information?Contact us
|
|
|
17.18 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
|
17.19 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
17.20 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
17.20 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
|
17.21 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
17.21 miles
|
CoreSite Reston Campus VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
17.21 miles
|
Center PlusInterested in this information?Contact us
|
|
|
17.21 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
17.22 miles
|
QTS: ASH2 DC2
|
DC2 is the second building of Ashburn's Lockridge ASH2 Campus.
|
|
17.22 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
17.22 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
17.24 miles
|
Centersquare: IAD2-B
|
|
|
17.26 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
17.27 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
17.27 miles
|
Park MaxInterested in this information?Contact us
|
|
|
17.28 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
17.28 miles
|
QTS Ashburn Lockridge
|
QTS Lockridge ASH2 hyperscale campus is located in Sterling, Virginia. Comprising two bookend buildings on a tight infill site, the two-story single-use facilities span a 28-acre campus.
|
|
17.28 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
17.28 miles
|
CoreSite VA2
|
|
|
17.28 miles
|
EdgeInterested in this information?Contact us
|
|
|
17.31 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
17.32 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
17.32 miles
|
Deft: DRT-IAD1
|
|
|
17.34 miles
|
Prime StationInterested in this information?Contact us
|
|
|
17.35 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
17.35 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
17.35 miles
|
Campus BetaInterested in this information?Contact us
|
|
|
17.35 miles
|
Plaza AlphaInterested in this information?Contact us
|
|
|
17.36 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
17.38 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
17.38 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
|
17.42 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
17.42 miles
|
ParkInterested in this information?Contact us
|
|
|
17.44 miles
|
H5: Herndon
|
|
|
17.44 miles
|
Lumen Herndon 3
|
|
|
17.44 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
17.45 miles
|
Lumen Herndon 1
|
|
|
17.47 miles
|
Stack: NVA04B
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
17.48 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
17.48 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
17.49 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.51 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.51 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
17.53 miles
|
Stack: NVA04C
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
17.55 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
17.57 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
17.59 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.59 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
17.68 miles
|
West PointInterested in this information?Contact us
|
|
|
17.70 miles
|
Active Infra: Spring Valley Expansion
|
|
|
17.70 miles
|
Active Infra: Spring Valley Tech Park
|
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
|
|
17.71 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
17.72 miles
|
Digital Realty: IAD43
|
|
|
17.76 miles
|
BetaInterested in this information?Contact us
|
|
|
17.76 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
17.77 miles
|
Vantage VA16
|
|
|
17.79 miles
|
Central TowerInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.80 miles
|
Vantage VA15
|
In July 2025, Vantage completed the topping out of the fifth building at its data center campus in Ashburn, Loudoun County, Virginia.
|
|
17.80 miles
|
44372 Round Table: Digital Realty
|
|
|
17.80 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
17.81 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
17.84 miles
|
ThreeInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.85 miles
|
44274 Round Table (Bldg L)
|
|
|
17.87 miles
|
Tower OneInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
17.88 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
17.92 miles
|
PowerHouse: Pacific Bldg C
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
17.93 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
17.94 miles
|
Vantage: VA23
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
17.94 miles
|
Vantage VA2 Campus
|
On 18.6 acres east of Route 28 in Sterling, Virginia, Vantage Data Centers is developing its VA2 campus.
|
|
17.95 miles
|
Connect Data Centers: Sterling, VA
|
|
|
17.98 miles
|
Digital Realty: Broderick Drive
|
|
|
17.98 miles
|
PowerHouse: Pacific Bldg B
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
18.00 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
18.00 miles
|
Vantage: VA22
|
This facility is part of Vantage's Ashburn VA2 Campus in Virginia.
|
|
18.01 miles
|
Equinix DC13
|
|
|
18.02 miles
|
Vantage VA12
|
|
|
18.04 miles
|
44751 Round Table (Bldg P)
|
|
|
18.06 miles
|
Sabey: Intergate.Ashburn (Building B)
|
|
|
18.07 miles
|
CloudHQ Ashburn Campus
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
18.07 miles
|
Sabey Intergate.Ashburn (Building A)
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
18.08 miles
|
CloudHQ: LC1B
|
|
|
18.08 miles
|
Vantage VA13
|
|
|
18.08 miles
|
Vantage VA14
|
|
|
18.08 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019.
|
|
18.08 miles
|
PowerHouse Pacific
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
18.10 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
18.11 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
18.12 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
|
18.12 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
18.14 miles
|
FastServ Ashburn
|
|
|
18.15 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
18.16 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
18.18 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
18.20 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
18.21 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
18.27 miles
|
DataBank Ashburn IAD3
|
|
|
18.27 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
18.28 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
18.33 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
18.33 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
18.35 miles
|
Equinix DC21
|
|
|
18.35 miles
|
NTT: VA9
|
|
|
18.35 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
18.42 miles
|
Tower ProInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
18.43 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
18.43 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
18.44 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
18.44 miles
|
NTT VA5
|
|
|
18.46 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
18.46 miles
|
Equinix Ashburn DC11
|
|
|
18.46 miles
|
Equinix Ashburn DC6
|
|
|
18.47 miles
|
Equinix Ashburn DC5
|
|
|
18.47 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
18.49 miles
|
Equinix Ashburn DC1
|
|
|
18.49 miles
|
Equinix Ashburn DC4
|
|
|
18.50 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
18.50 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
18.51 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
18.51 miles
|
NTT: VA8
|
|
|
18.52 miles
|
NTT Ashburn Campus
|
|
|
18.54 miles
|
Cologix: Ashburn ASH2
|
Cologix has acquired 38 acres in Ashburn’s "Data Center Alley" for a new AI-ready interconnection hub.
|
|
18.54 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
|
18.54 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
18.57 miles
|
NTT VA4
|
|
|
18.58 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
18.61 miles
|
Ridge ProInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
18.63 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
18.71 miles
|
Global ValleyInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
18.71 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
18.75 miles
|
Cologix: ASH1-N
|
This facility is part of Cologix ASH1 campus in Ashburn.
|
|
18.76 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
18.77 miles
|
CyrusOne: Broadlands Expansion
|
|
|
18.77 miles
|
Rackspace Ashburn IAD3
|
|
|
18.77 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
18.82 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
18.82 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
18.82 miles
|
CyrusOne: Broadlands Boulevard
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
18.86 miles
|
44470 Chillum - Digital Realty
|
|
|
18.87 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
18.87 miles
|
PowerHouse ABX1
|
|
|
18.90 miles
|
21710 Charles View
|
|
|
18.90 miles
|
GammaInterested in this information?Contact us
|
|
|
18.91 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
18.91 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
18.94 miles
|
Lumen Ashburn
|
|
|
18.95 miles
|
SAMX data center campus
|
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
|
|
18.98 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
19.01 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
19.01 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
19.02 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
19.03 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
19.07 miles
|
Central ParkInterested in this information?Contact us
|
|
|
19.08 miles
|
21641 Charles View
|
|
|
19.09 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
19.10 miles
|
Equinix DC15
|
|
|
19.12 miles
|
NTT VA2
|
|
|
19.15 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
19.17 miles
|
Equinix DC16
|
|
|
19.20 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
19.20 miles
|
Convergent Technology Park
|
Convergent VA has submitted revised conceptual plans for the Convergent Technology Park in Remington, Fauquier County, Virginia.
|
|
19.22 miles
|
East PointInterested in this information?Contact us
|
|
|
19.23 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
19.25 miles
|
PointOne: Remington Expansion
|
|
|
19.27 miles
|
PrimeInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
19.32 miles
|
CoreInterested in this information?Contact us
|
|
|
19.32 miles
|
PointOne: Remington Technology Park
|
In March 2018, Alberta-based PointOne Holdings Inc. received approval to rezone 234 acres on Lucky Hill Road, Remington, for a data center project.
|
|
19.32 miles
|
Center UltraInterested in this information?Contact us
|
|
|
19.34 miles
|
Campus OneInterested in this information?Contact us
|
|
|
19.36 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
19.37 miles
|
MaxInterested in this information?Contact us
|
|
|
19.38 miles
|
CenterInterested in this information?Contact us
|
|
|
19.38 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
19.40 miles
|
PointInterested in this information?Contact us
|
|
|
19.42 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
19.43 miles
|
Compass Loudoun County
|
|
|
19.44 miles
|
Gigaland: Remington, VA
|
Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. However, the company now plans to propose a smaller project for the site.
|
|
19.51 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
19.55 miles
|
CyrusOne Northern Virginia Sterling V
|
|
|
19.55 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
19.67 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
19.81 miles
|
CyrusOne Sterling VIII
|
|
|
19.83 miles
|
Park OneInterested in this information?Contact us
|
|
|
19.83 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
19.83 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
19.84 miles
|
COPT: 45761 Maries Rd
|
|
|
19.84 miles
|
COPT: 45771 Maries Rd
|
|
|
19.85 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.91 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
19.93 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
19.94 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
19.94 miles
|
Centersquare: Sterling DC2
|
|
|
19.96 miles
|
East CenterInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.98 miles
|
PlazaInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
19.99 miles
|
Campus ProInterested in this information?Contact us
|
|