Year Built: 2025
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm. The associated structures include water tanks, sprinkler tanks, pump house, and prefabricated containerized electrical rooms located within the center of the site, as well as a temporary substation and utility connections to the boundary of the site.

  • The first two-storey data center (Building A), completed in 2024, is located to the south-west of the site and has a gross floor area of 28,573 sqm. It includes 26 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that are 25m in height. The facility also includes 26 ventilation shafts located above the northern end of each emergency generator, measuring 20m in height.
  • The second two-storey data center (Building B) will be located to the north-west of the site, immediately north of Building A, and will have a gross floor area of 21,725 sqm. It will include 18 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts located above the southern end of each emergency generator, measuring 20m in height.
  • The last two-storey data center (Building C) will be constructed last and will be located in the eastern part of the site on a north-south axis, with a gross floor area of 28,573 sqm. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts located above the western end of each emergency generator, measuring 20m in height.

Map and Nearby Locations

This Facility ( Co. Dublin, D22 T2P7 )
Amazon AWS Sites
Nearby Facilities

ThreeInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Valley TwoInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Park GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Ridge TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Edge PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us CyrusOne: DUB1 Bldg 2
Second data centre block on CyrusOne's Grange Castle DUB1 campus (Building B under SD18A/0134), on a cleared pad east of Building 1. Permission extended in 2023; construction not started.
NN milesInterested in this information?Contact us Plaza BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Station GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us CyrusOne: DUB1 Bldg 1
First building on CyrusOne's Grange Castle DUB1 campus: a two-storey data centre with an attached three-storey office block on Conchobar Murray Avenue, built 2019-2021 by Structure Tone, with 16 standby generators and rooftop solar.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks
Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20...

Amazon Settles With Two Former AWS Managers Over Data Center Kickbacks

October 27, 2026 Amazon AWS

Amazon has settled its civil claims against two former AWS real estate managers it accused of taking kickbacks on Northern Virginia data center deals. The company told a federal court on October 20 that it had reached the agreement with Carl Nelson and Casey Kirschner, less than two weeks before...

Read more
Read Amazon Plans Second Missouri Campus With Up To 15 Data Center Buildings
[Amazon Web Services](https://baxtel.com/data-centers/amazon-aws) plans up to 15 more data center buildings on as much as 890 acres in [Missouri](https://baxtel.com/regions/missouri)'s Montgomery C...

Amazon Plans Second Missouri Campus With Up To 15 Data Center Buildings

October 26, 2026 Amazon AWS

Amazon Web Services plans up to 15 more data center buildings on as much as 890 acres in Missouri's Montgomery County, a second campus that would sit closer to Danville, several miles from the Project Green build already under construction near New Florence. Amazon representative Brian Bolton...

Read more
Read Umatilla Declares Emergency Over Oregon Data Center Permit Pause
The city of Umatilla, Oregon, has declared a state of emergency over Governor Tina Kotek's order pausing state environmental permits for new and expanded data centers, an escalation of local pushba...

Umatilla Declares Emergency Over Oregon Data Center Permit Pause

October 25, 2026 Oregon

The city of Umatilla, Oregon, has declared a state of emergency over Governor Tina Kotek's order pausing state environmental permits for new and expanded data centers, an escalation of local pushback against the statewide freeze. Five of the six city council members present voted for the...

Read more
Read Amazon Pledges €16B For Germany In 2027, Including €4.8B For AWS Frankfurt
Amazon plans to invest more than €16 billion ($18 billion) in Germany in 2027, including €4.8 billion to expand the [AWS Europe (Frankfurt) region](https://press.aboutamazon.com/de/2026/10/invest-i...

Amazon Pledges €16B For Germany In 2027, Including €4.8B For AWS Frankfurt

October 21, 2026 Amazon AWS

Amazon plans to invest more than €16 billion ($18 billion) in Germany in 2027, including €4.8 billion to expand the AWS Europe (Frankfurt) region, the company said on Oct. 20. Chancellor Friedrich Merz and federal economy and energy minister Katherina Reiche appeared with Amazon chief global...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?