0.03 miles
|
Campus ProInterested in this information?Contact us
|
|
|
0.19 miles
|
MaxInterested in this information?Contact us
|
The site started construction in 2012.
|
|
0.25 miles
|
Ridge OneInterested in this information?Contact us
|
|
|
0.28 miles
|
Point UltraInterested in this information?Contact us
|
|
|
0.60 miles
|
CenterInterested in this information?Contact us
|
|
|
0.77 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
1.79 miles
|
ProInterested in this information?Contact us
|
|
|
1.87 miles
|
Central ParkInterested in this information?Contact us
|
|
|
1.92 miles
|
WestInterested in this information?Contact us
|
|
|
2.01 miles
|
Central PlazaInterested in this information?Contact us
|
|
|
2.61 miles
|
MetroInterested in this information?Contact us
|
|
|
2.63 miles
|
Ridge GammaInterested in this information?Contact us
|
|
|
2.65 miles
|
ParkInterested in this information?Contact us
|
|
|
2.68 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
4.09 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
4.16 miles
|
Core CenterInterested in this information?Contact us
|
|
|
4.19 miles
|
PrimeInterested in this information?Contact us
|
|
|
4.27 miles
|
NorthInterested in this information?Contact us
|
|
|
7.05 miles
|
Campus ThreeInterested in this information?Contact us
|
|
|
7.09 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.09 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.12 miles
|
ValleyInterested in this information?Contact us
|
|
|
7.19 miles
|
Station OneInterested in this information?Contact us
|
|
|
7.28 miles
|
Global PointInterested in this information?Contact us
|
|
|
7.30 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.32 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.11 miles
|
North CenterInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.19 miles
|
HubInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.24 miles
|
Center GammaInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.32 miles
|
Ridge ProInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
16.81 miles
|
CentralInterested in this information?Contact us
|
|
|
16.82 miles
|
South TowerInterested in this information?Contact us
|
|
|
16.82 miles
|
Metro CampusInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.85 miles
|
Hub ProInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.86 miles
|
CenterInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.92 miles
|
Cloud RidgeInterested in this information?Contact us
|
|
|
16.96 miles
|
Tower OneInterested in this information?Contact us
|
|
|
17.08 miles
|
Center OneInterested in this information?Contact us
|
|
|
17.41 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.45 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.47 miles
|
Park PlusInterested in this information?Contact us
|
|
|
17.49 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.89 miles
|
Edge ParkInterested in this information?Contact us
|
|
|
17.92 miles
|
Prime StationInterested in this information?Contact us
|
|
|
18.00 miles
|
CenterInterested in this information?Contact us
|
|
|
18.69 miles
|
BetaInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
18.72 miles
|
SouthInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.92 miles
|
Central RidgeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.95 miles
|
StationInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.13 miles
|
Station TwoInterested in this information?Contact us
|
|
|
19.27 miles
|
ThreeInterested in this information?Contact us
|
|
|
19.31 miles
|
Station TwoInterested in this information?Contact us
|
|
|
19.43 miles
|
Central HubInterested in this information?Contact us
|
Construction started in 2012.
|