Texas Data Center Market

Latest Podcast

The Texas data center market is located in the region of South Central US and within United States. Texas has 1139 facilities.

The top providers in Texas are Crusoe (20 sites) and Google with 30 facilities . The most popular facilities are Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy and CyrusOne Carrollton.

Read More

Market Facts

Texas Data Center Map

Texas Power Growth Over Time

+147% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Texas

Crusoe
Site
Power
Operational
6
618.0
Construction
14
Planned
5
Prospective Expansion
2
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
20
View Provider
Google
Site
Power
Operational
6
281.0
Construction
24
Planned
11
Prospective Expansion
4
Land Bank
1
In Doubt
0
Withdrawn
1
Decommissioned
0
Totals
30
View Provider
Lancium
Site
Power
Operational
2
1025.0
Construction
1
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Microsoft Azure
Site
Power
Operational
32
807.35
Construction
10
Planned
7
Prospective Expansion
1
Land Bank
2
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
42
View Provider

Largest Data Centers in Texas

Location About Total SqFt Power (MW)
Lancium: Abilene
Lancium's Clean Campus in north Abilene is a powered-land campus. It hosts the eight Stargate dat...
NN Request Dataset
ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Park MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
BitDeer: Rockdale, TX
Bitdeer operates its long-standing Rockdale data center at the former Alcoa industrial complex an...
NN Request Dataset
Valley PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset

Regions in Texas

Data Center Events in Texas See all

17 events
Event Starts in Details
14 days
View Reuters Energy LIVE 2026
Organized by:
Reuters Events
Type:
Power
Description:

Energy LIVE 2026 is Reuters Events' annual US energy leadership summit, held December 8-9, 2026 at the Marriott Marquis Houston. It brings together utilities, power producers, grid operators, oil, gas and LNG companies, nuclear developers, data center operators, and investors. Reuters Events expects 1,500+ senior attendees and 75+ exhibitors, with projects worth a combined $755 billion represen...

56 days
View Advancing Nuclear Power Construction 2027
Organized by:
Advancing Construction
Type:
Data Center Power
Description:

Advancing Nuclear Power Construction is a three-day technical and executive conference organized by Advancing Construction, a division of Hanson Wade Group. Taking place January 19–21, 2027, at the Hyatt Regency Dallas in Dallas, Texas, the summit gathers more than 60 project owners, EPC contractors, specialty trades, reactor developers, and engineering firms focused on project delivery across ...

62 days
View ERCOT Power NEXT 2027
Organized by:
Infocast
Type:
Data Center Power
Description:

ERCOT Power NEXT is a three-day executive power and energy conference organized by Infocast, taking place January 25–27, 2027, at the Hilton Austin in Austin, Texas. Expanding on Infocast's long-running ERCOT Market Summit, the event convenes more than 800 participants and over 115 speakers across 29 sessions. Attendees include wholesale power generators, electric utilities, ERCOT officials, st...

91 days
View Energy HPC & AI Conference 2027
Organized by:
Rice University Ken Kennedy Institute
Type:
Data Center Enterprise IT
Description:

The Energy HPC & AI Conference is the annual meeting hosted by the Ken Kennedy Institute at Rice University, held February 23–25, 2027 at the BioScience Research Collaborative in Houston, Texas. The 2027 edition marks the conference's 20th year. It is the energy industry's central forum for high-performance computing, computational science and engineering, machine learning, and data science, dr...

99 days
View 2027 ASHRAE Data Center and AI Integration Conference
Organized by:
ASHRAE
Type:
Data Center
Description:

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) holds its first Data Center and AI Integration Conference from March 3 to 5, 2027, at the Hilton Dallas Lincoln Centre by the Galleria in Dallas, Texas. The conference covers how to design, operate, and optimize data center facilities for AI workloads, with a focus on power density, cooling efficiency, and su...

104 days
View CERAWeek 2027
Organized by:
S&P Global
Type:
Data Center Power
Description:

CERAWeek 2027 is S&P Global's annual energy conference, chaired by S&P Global Vice Chairman Daniel Yergin. S&P Global runs it through its S&P Global Energy division, formerly S&P Global Commodity Insights. It runs March 8-12, 2027, in Houston at the Hilton Americas-Houston and the George R. Brown Convention Center. CERAWeek 2026 drew more than 2,470 companies, 2,200 C-suite leaders and 588 gove...

120 days
View RE+ Texas 2027
Organized by:
Solar Energy Industries Association
Type:
Data Center Power
Description:

RE+ Texas is an annual regional clean energy conference and exhibition organized by the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) through RE+ Events. The 2027 edition convenes March 24 to 25, 2027, at the George R. Brown Convention Center in Houston, Texas. Co-located with RE+ Microgrids, the event brings together more than 1,500 clean energy profes...

146 days
View GCPA Spring Conference 2027
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association's Spring 2027 Conference runs April 19 to 21, 2027, at Hilton Americas-Houston. The spring meeting covers ERCOT and Gulf Coast power markets. Registration opens in early 2027. No agenda, speakers, or sponsors are published yet. The 2026 spring conference expected 600+ attendees, citing 650 attendees in 2025. Programming Focus The 2026 edition covered these topic...

147 days
View Energy Storage Summit USA 2027
Organized by:
Informa
Type:
Power
Description:

Energy Storage Summit USA 2027 is the ninth annual executive conference organized by Solar Media (Informa Markets), taking place April 20–21, 2027, at the Renaissance Dallas at Plano Legacy West Hotel in the Dallas metro area. The two-day gathering convenes more than 400 senior decision-makers across the energy storage, electric utility, power generation, and digital infrastructure sectors, foc...

195 days
View Permian Power Conference 2027
Organized by:
The Power Connection
Type:
Data Center Power
Description:

The Permian Power Conference is a two-day executive gathering held June 7–8, 2027, at the Horseshoe Arena in Midland, Texas. Produced by The Power Connection, the conference connects power generators, electric utilities, and oil and gas producers with data center developers, artificial intelligence infrastructure operators, and infrastructure financiers. The forum addresses regional power infra...

280 days
View Datacloud USA x Metro Connect Fall 2027
Organized by:
Datacloud
Type:
Data Center Telecom & Networks
Description:

Datacloud USA x Metro Connect Fall is an executive digital infrastructure conference co-located with Metro Connect Fall, uniting the data center, cloud, and fiber sectors. Organized by Datacloud, the 2027 edition takes place from August 31 through September 2, 2027, at the Fairmont Austin in Austin, Texas, with pre-conference activities opening on August 30. The gathering convenes approximately...

293 days
View ACP RECHARGE: Energy Storage Conference 2027
Organized by:
American Clean Power Association
Type:
Power
Description:

ACP RECHARGE is the annual energy storage conference of the American Clean Power Association (ACP). The 2027 edition takes place September 13 to 15, 2027, at the Austin Marriott Downtown in Austin, Texas. Registration for 2027 has not opened yet. The 2026 edition, held in Aurora, Colorado, drew 600 attendees, more than 75 speakers, and 15 exhibitors. Programming Focus The 2027 program has not b...

294 days
View Gastech 2027
Organized by:
dmg events
Type:
Data Center Power
Description:

Gastech 2027 is an exhibition and conference covering natural gas, LNG, low-carbon solutions, electrification and AI for energy. The organizer is dmg events. It runs September 14-17, 2027, at the George R. Brown Convention Center in downtown Houston. The event site cites 60,000 attendees from 150 countries, 800 exhibiting companies, 800 speakers and 200 sessions across 15 programs. Gastech 2026...

314 days
View GCPA Fall Conference 2027
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association's Fall 2027 Conference runs October 4 to 6, 2027, at the AT&T Hotel & Conference Center in Austin, Texas. It is GCPA's largest yearly meeting on ERCOT and Gulf Coast power markets. Registration opens in summer 2027. No agenda, speakers, or sponsors are published yet. The 2025 fall conference drew 875 attendees, and the 2026 edition projected 850+. Programming Fo...

335 days
View Data Center World Power 2027
Organized by:
AFCOM
Type:
Data Center Power
Description:

Data Center World Power returns to the Gaylord Texan Resort & Convention Center in Grapevine, Texas, from October 25 to 27, 2027. Organised by AFCOM and Informa Connect as part of the broader Data Center World event portfolio, the three-day gathering is dedicated exclusively to the power, energy procurement, and electrical infrastructure challenges facing the data center industry. The event uni...

510 days
View GCPA Spring Conference 2028
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association has scheduled its Spring 2028 Conference for April 17 to 19, 2028, in Houston, Texas. GCPA has not announced a venue, agenda, or registration date. Its 2026 and 2027 spring conferences use Hilton Americas-Houston. The spring meeting covers ERCOT and Gulf Coast power markets. The 2025 spring conference drew 650 attendees. Who Should Attend Data center developers ...

678 days
View GCPA Fall Conference 2028
Organized by:
Gulf Coast Power Association
Type:
Data Center Power
Description:

The Gulf Coast Power Association has scheduled its Fall 2028 Conference for October 2 to 4, 2028, in Austin, Texas. GCPA has not announced a venue, agenda, or registration date. Its 2025, 2026, and 2027 fall conferences use the AT&T Hotel & Conference Center. The fall meeting is GCPA's largest, with 875 attendees in 2025. Who Should Attend Data center developers and operators active in Texas Ut...

About This Metro

There are 4 hubs of data center activity in Texas: Dallas Fort Worth, Austin, Houston, and San Antonio. However, the Dallas metro dominates the state.

Get Quotes

Related News See all

Read Texas Resumes Data Center Permits, Issues Air Permit for SpaceX Starbase
Texas environmental regulators have resumed issuing data center permits, ending a pause that Governor Greg Abbott ordered on Sept. 21. The Texas Commission on Environmental Quality received ![rocke...

Texas Resumes Data Center Permits, Issues Air Permit for SpaceX Starbase

November 19, 2026 Texas

Texas environmental regulators have resumed issuing data center permits, ending a pause that Governor Greg Abbott ordered on Sept. 21. The Texas Commission on Environmental Quality received notice from Abbott's office on Nov. 13 that the state's grid operator had finished gathering data...

Read more
Read ChronoScale Takes 50% Stake In STN's 350MW Odessa AI Campus
ChronoScale Holdings is taking a 50% stake in STN's AI data center campus in Odessa, Texas, under a development partnership announced Nov. 18. Each company will contribute $390 million in value to ...

ChronoScale Takes 50% Stake In STN's 350MW Odessa AI Campus

November 19, 2026 STN

ChronoScale Holdings is taking a 50% stake in STN's AI data center campus in Odessa, Texas, under a development partnership announced Nov. 18. Each company will contribute $390 million in value to the 50/50 venture, which is planned to house compute for an unnamed frontier AI lab across three...

Read more
Read SpaceX Proposes $24B Gas Plant And Super-Compute Facility At Starbase
The City of Starbase will consider a property tax abatement for a [SpaceX](https://baxtel.com/data-centers/spacex) gas-fired power plant and super-compute facility at its Dec. 9 meeting. SpaceX pro...

SpaceX Proposes $24B Gas Plant And Super-Compute Facility At Starbase

November 18, 2026 SpaceX

The City of Starbase will consider a property tax abatement for a SpaceX gas-fired power plant and super-compute facility at its Dec. 9 meeting. SpaceX proposes to build, own and operate the project on a 444-acre tract east of Brownsville, Texas, with an estimated $24 billion investment for the...

Read more
Read Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center
Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, [announced](https://www.gigaenergy.com/news/giga-news-hunt-county...

Giga Energy Signs $1B, 10-Year Lease for 60MW Hunt County Data Center

November 18, 2026 Giga Energy

Giga Energy has signed a 10-year lease worth about $1 billion at its Project Clay data center in Hunt County, Texas. The agreement, announced on November 17, covers 60MW of capacity for an undisclosed U.S.-based AI cloud provider. Giga Energy develops, owns, and operates the campus, Reuters...

Read more
Read Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center
Core Scientific has registered a $1.3 billion plan to build a data center building at its [285MW Hunt County campus](https://baxtel.com/data-center/core-scientific-hunt-county-tx) outside Dallas. T...

Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center

November 16, 2026 Core Scientific

Core Scientific has registered a $1.3 billion plan to build a data center building at its 285MW Hunt County campus outside Dallas. The filing with the Texas Department of Licensing and Regulation covers a 341,326 sq ft core-and-shell building at 4852 County Road 3507 in Quinlan, about 53 miles...

Read more
Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.