|
0.07 miles
|
RidgeInterested in this information?Contact us
|
|
|
0.07 miles
|
Hub ThreeInterested in this information?Contact us
|
|
|
0.13 miles
|
South TowerInterested in this information?Contact us
|
|
|
0.14 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
0.65 miles
|
Connect Data Centers: Hilliard, OH
|
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
2.23 miles
|
Point PrimeInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
2.24 miles
|
Expedient Dublin (CMH2)
|
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
|
2.25 miles
|
CampusInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
2.26 miles
|
Tower TwoInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
2.28 miles
|
East ParkInterested in this information?Contact us
|
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
|
2.51 miles
|
DartPoints: Dublin, OH
|
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
|
2.68 miles
|
Hub TwoInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
2.75 miles
|
North TowerInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
2.76 miles
|
Valley ProInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
2.89 miles
|
PlazaInterested in this information?Contact us
|
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
|
2.93 miles
|
Expedient Upper Arlington
|
|
|
3.06 miles
|
Edge ValleyInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
3.15 miles
|
South PlazaInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
4.36 miles
|
CloudInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
|
4.40 miles
|
ParkInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
|
4.45 miles
|
Cloud StationInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
|
4.49 miles
|
Cloud TowerInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
|
4.55 miles
|
EastInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio.
|
|
5.23 miles
|
StationInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
5.31 miles
|
TwoInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
5.35 miles
|
Park ThreeInterested in this information?Contact us
|
|
|
5.37 miles
|
Station ProInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
5.44 miles
|
MetroInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
6.56 miles
|
BetaInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
6.58 miles
|
HubInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
6.65 miles
|
EdgeInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
6.67 miles
|
RidgeInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
7.10 miles
|
Kyndryl: Columbus
|
|
|
7.43 miles
|
Karis: Galloway, Ohio
|
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
|
|
8.04 miles
|
Cologix Columbus COL1, COL2
|
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
|
8.05 miles
|
Cologix COL3
|
|
|
8.20 miles
|
Cologix Columbus COL4
|
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
|
9.14 miles
|
Expedient: Lewis Center (CMH3)
|
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
|
9.36 miles
|
Lumen: 580 North 4th
|
|
|
9.70 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
9.72 miles
|
Lumen: 266 North 5th
|
|
|
9.74 miles
|
Cogent: 240 North 5th
|
|
|
9.76 miles
|
Racksquared 2560 Value Way
|
|
|
9.77 miles
|
CityNet Columbus
|
|
|
9.77 miles
|
WOW! 226 N 5th
|
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
|
9.77 miles
|
Lumen: 226 North Fifth
|
|
|
9.92 miles
|
Racksquared 325 E Spring St
|
|
|
9.95 miles
|
US Signal Columbus
|
DC power w/battery backup available
Multiple diverse power feeds from utility grids
|
|
9.95 miles
|
CENTRA: 180 East Broad (CMH01)
|
|
|
9.98 miles
|
Centersquare: Columbus CMH1
|
DCI Technology Holdings owns the building and is CenturyLink's landlord.
|
|
10.12 miles
|
Crown Castle 101 E Town
|
Crown Castle acquired Lightower in 2017
|
|
10.52 miles
|
eNET Columbus
|
|
|
11.01 miles
|
WeConnect Westerville
|
|
|
11.12 miles
|
Cologix: Columbus COL5
|
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
|
11.18 miles
|
Cologix: COL6
|
This planned facility is part of Cologix COL5 campus in Columbus.
|
|
11.22 miles
|
MicroLink: Mansfield Campus
|
MicroLink is planning to build a data center in Columbus, Ohio.
|
|
13.19 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
14.86 miles
|
TowerInterested in this information?Contact us
|
Amazon is constructing a two building data center campus in Marysville, Ohio, potentially spanning 500,000 square feet.
|
|
14.96 miles
|
North CenterInterested in this information?Contact us
|
This facility is part of Amazon's Marysville Campus in Ohio.
|
|
15.50 miles
|
CeraNet Columbus
|
|
|
16.04 miles
|
Tower MaxInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
16.17 miles
|
Core ValleyInterested in this information?Contact us
|
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
|
16.24 miles
|
Center GammaInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
16.43 miles
|
StationInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
16.51 miles
|
Tower ThreeInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
17.19 miles
|
Discover Financial Services New Albany
|
|
|
17.23 miles
|
Edged Energy: Columbus CMH01
|
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
|
|
17.49 miles
|
TJX Corporate Techno
|
|
|
17.53 miles
|
Compass New Albany
|
|
|
17.67 miles
|
Compugen New Albany
|
|
|
17.81 miles
|
Stack: NAL01B
|
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
|
|
17.96 miles
|
STACK New Albany NAL01
|
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
|
18.20 miles
|
Compass Groveport AEP II
|
American Electric Power invested approximately $125 million into the data center on Hamilton Road
|
|
18.58 miles
|
DataCanopy: Columbus
|
|
|
18.69 miles
|
Station ThreeInterested in this information?Contact us
|
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
|
|
19.13 miles
|
TwoInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.17 miles
|
BetaInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.31 miles
|
QTS: Babbitt Rd, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
19.40 miles
|
Cloud PointInterested in this information?Contact us
|
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
|
|
19.41 miles
|
Metro TowerInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.55 miles
|
ParkInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.57 miles
|
CloudInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.60 miles
|
Hub ProInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
19.61 miles
|
Hub PlusInterested in this information?Contact us
|
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
|
|
19.92 miles
|
QTS: New Albany 1 DC2
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
|
19.94 miles
|
QTS: New Albany 1 DC1
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|