The Kuala Lumpur Data Center Map Has 22 Sites

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

NTT's Sora Data Centre
Posted in NTT Cyberjaya 4
Source: Shaw Architect
Ground Floor Plan for CBJ3 and CBJ4
Posted in NTT Cyberjaya 4
CB5 and CB6 Expansion Plans
Posted in NTT Cyberjaya 4
Sectional Perspective
Posted in NTT Cyberjaya 4
Source: Shaw Architect
Cyberjaya 4 Lounge Area
Posted in NTT Cyberjaya 4
Seamless Cloud for the World
Posted in NTT Cyberjaya 4
CBJ4 Office Area
Posted in NTT Cyberjaya 4
Reception Counter
Posted in NTT Cyberjaya 4
Source: H Lin Ho
Drop Off Area
Posted in NTT Cyberjaya 4
Source: H Lin Ho
NOC Room
Posted in NTT Cyberjaya 4
Source: H Lin Ho
Lobby Area
Posted in NTT Cyberjaya 4
Source: H Lin Ho
Large Bonsai Tree
Posted in NTT Cyberjaya 4
Source: H Lin Ho
Contained Colocation Room
Posted in NTT Cyberjaya 4
Nexcenter Hallway at CBJ4
Posted in NTT Cyberjaya 4
NTT's MSC Global Solution Center (Office)
Posted in NTT Cyberjaya 4
View of CBJ3 and CBJ4
Posted in NTT Cyberjaya 4
Source: Leang Wai Loon
2017 Cyberjaya4 Expansion
Posted in NTT Cyberjaya 4
MSC Global Solution Office
Posted in NTT Cyberjaya 4
NTT Malaysia Cyberjaya 4 Data Center
Posted in NTT Cyberjaya 4
Source: NTT
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Loading Bay
Posted in NTT Cyberjaya 4

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.

Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Posted in NTT Cyberjaya 4

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.

Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Posted in NTT Cyberjaya 4

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.

NTT provides power capacity and associate cooling of at least 3kVA per rack.

Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Posted in NTT Cyberjaya 4

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Source: NTT

Largest Datacenters in Kuala Lumpur

Gross SqFt Gross SqFt Power (MW) Power (MW)
Bridge Data Centres Cyberjaya MY01 157,500 25.60
VADS Cyberjaya Klang Valley (KVDC) 90,000 20.00
AIMS Kuala Lumpur Menara 8.00
CSF Computer Exchange 2 (CX2)
NTT Cyberjaya 1
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Data Center Construction in Kuala Lumpur

Company Region Name Site Name Building SqFt Gross SqFt Power (MWs) Estimated Launch
Bridge Data Centres Kuala Lumpur Bridge Data Centres MY03 16.0 Jun 01 2022
Total 0 0 16.0