|
0.10 miles
|
Global HubInterested in this information?Contact us
|
|
|
0.14 miles
|
PlazaInterested in this information?Contact us
|
|
|
0.17 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
0.66 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.68 miles
|
EastInterested in this information?Contact us
|
|
|
0.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.76 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.81 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.85 miles
|
Cloud HubInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.85 miles
|
WestInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.91 miles
|
Valley TwoInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
1.01 miles
|
RidgeInterested in this information?Contact us
|
|
|
1.10 miles
|
East TowerInterested in this information?Contact us
|
|
|
1.17 miles
|
Global RidgeInterested in this information?Contact us
|
|
|
1.21 miles
|
Station TwoInterested in this information?Contact us
|
|
|
2.18 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
2.25 miles
|
Global CampusInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
2.32 miles
|
CentralInterested in this information?Contact us
|
|
|
2.33 miles
|
HubInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.36 miles
|
Point UltraInterested in this information?Contact us
|
|
|
2.39 miles
|
AlphaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.46 miles
|
Central RidgeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.49 miles
|
EdgeInterested in this information?Contact us
|
Construction started in 2012.
|
|
3.98 miles
|
Station MaxInterested in this information?Contact us
|
|
|
4.08 miles
|
Park ProInterested in this information?Contact us
|
|
|
4.25 miles
|
West PointInterested in this information?Contact us
|
|
|
4.30 miles
|
Plaza BetaInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|
|
9.61 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.68 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.76 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.85 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
|
|
12.03 miles
|
EastInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.07 miles
|
Global RidgeInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.26 miles
|
Prime StationInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.33 miles
|
TowerInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.40 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.48 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.59 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.96 miles
|
Station MaxInterested in this information?Contact us
|
|
|
12.99 miles
|
South PointInterested in this information?Contact us
|
|
|
13.06 miles
|
South StationInterested in this information?Contact us
|
|
|
13.08 miles
|
EastInterested in this information?Contact us
|
|
|
13.41 miles
|
Valley TwoInterested in this information?Contact us
|
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
|
|
14.18 miles
|
Rowan Percheron
|
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
|
|
14.28 miles
|
WestInterested in this information?Contact us
|
|
|
14.30 miles
|
Ridge OneInterested in this information?Contact us
|
|
|
14.32 miles
|
Campus UltraInterested in this information?Contact us
|
|
|
14.35 miles
|
Metro ValleyInterested in this information?Contact us
|
|
|
16.03 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.07 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.12 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.14 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.48 miles
|
Park OneInterested in this information?Contact us
|
|
|
16.49 miles
|
Central CampusInterested in this information?Contact us
|
|
|
16.50 miles
|
Central PointInterested in this information?Contact us
|
|
|
16.52 miles
|
EastInterested in this information?Contact us
|
|
|
16.95 miles
|
UltraInterested in this information?Contact us
|
|
|
16.96 miles
|
MaxInterested in this information?Contact us
|
|
|
17.02 miles
|
EastInterested in this information?Contact us
|
|
|
17.02 miles
|
Center ProInterested in this information?Contact us
|
|
|
17.08 miles
|
Ridge UltraInterested in this information?Contact us
|
The site started construction in 2012.
|
|
17.21 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
17.59 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
18.74 miles
|
Metro HubInterested in this information?Contact us
|
|
|
18.83 miles
|
MetroInterested in this information?Contact us
|
|
|
18.88 miles
|
BetaInterested in this information?Contact us
|
|
|
18.97 miles
|
Prime PlazaInterested in this information?Contact us
|
|