0.13 miles
|
Amazon IAD1
|
|
0.15 miles
|
Amazon IAD22
|
|
0.67 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
1.24 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
1.27 miles
|
IBM Softlayer Chantilly WDC01
|
|
1.70 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
1.79 miles
|
Amazon 25420 Sutton Bay
|
|
1.83 miles
|
Amazon 25410 Sutton Bay
|
|
2.06 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
2.10 miles
|
Amazon 13600 EDS Drive
|
|
2.22 miles
|
Amazon 25020 Willard Road
|
|
2.22 miles
|
Amazon Willard Road (Land)
|
|
2.36 miles
|
Amazon IAD61
|
|
2.47 miles
|
Amazon IAD-63
|
|
2.61 miles
|
Amazon Prediction Lane
|
|
2.75 miles
|
InfoRelay Herndon
|
|
4.62 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
4.80 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
4.89 miles
|
CyrusOne Sterling IX
|
|
4.93 miles
|
Amazon Fadeley II
|
|
4.97 miles
|
Google: Arcola 2
|
|
4.99 miles
|
Amazon Fadeley I
|
|
5.06 miles
|
Amazon Fadeley III
|
|
5.13 miles
|
Google Dulles Arcola Center
|
|
5.37 miles
|
PowerHouse Arcola
|
|
5.50 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
5.56 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
5.64 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
5.84 miles
|
AWS: 22945 International Dr
|
|
5.86 miles
|
Cogent: 510 Huntmar
|
|
5.92 miles
|
AWS: 22868 International Dr
|
|
5.92 miles
|
Equinix DC97
|
|
5.92 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
5.92 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
5.98 miles
|
Lumen Herndon 3
|
|
5.99 miles
|
Lumen Herndon 1
|
|
6.02 miles
|
Amazon IAD-58
|
|
6.02 miles
|
Cyxtera IAD2-B
|
|
6.03 miles
|
Amazon 41992 John Mosby Highway
|
|
6.04 miles
|
AWS: 22900 Platform Plz
|
|
6.05 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
6.06 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
6.10 miles
|
Amazon IAD-57
|
|
6.17 miles
|
Amazon IAD12
|
|
6.20 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
6.25 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
6.29 miles
|
Amazon IAD16
|
|
6.34 miles
|
Amazon IAD-88
|
|
6.35 miles
|
Amazon IAD-56
|
|
6.36 miles
|
Amazon 45111 Loudoun Downs
|
|
6.36 miles
|
Amazon IAD15
|
|
6.41 miles
|
Amazon IAD-51
|
|
6.45 miles
|
45900 Pathfinder Plz
|
|
6.46 miles
|
Microsoft IAD11
|
|
6.50 miles
|
AWS: 45950 Pathfinder Plz
|
|
6.52 miles
|
Amazon IAD76
|
|
6.54 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
6.55 miles
|
AWS: 45930 Pathfinder Plz
|
|
6.59 miles
|
EdgeCore: Sterling, NV
|
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.61 miles
|
EdgeCore: Ashburn, AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.65 miles
|
QTS Ashburn Lockridge
|
|
6.66 miles
|
Amazon 22420 Kipper
|
|
6.66 miles
|
44351 Import Plz
|
|
6.67 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
6.71 miles
|
Amazon 22370 Kipper
|
|
6.72 miles
|
Microsoft Aldie
|
|
6.76 miles
|
Import Plz, Ashburn
|
|
6.87 miles
|
Vantage VA2 Campus
|
|
6.89 miles
|
QTS Ashburn-Shellhorn
|
|
6.91 miles
|
InfoRelay Reston
|
|
6.93 miles
|
QTS Ashburn-Shellhorn DC2
|
|
6.96 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
6.97 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
7.00 miles
|
Vantage VA12
|
|
7.01 miles
|
Sentinel Ashburn
|
|
7.06 miles
|
Digital Realty: IAD43
|
|
7.07 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
7.13 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
7.13 miles
|
Amazon IAD-67
|
|
7.17 miles
|
Vantage VA11
|
|
7.17 miles
|
Vantage VA13
|
|
7.18 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
7.18 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
7.18 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
7.23 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
7.26 miles
|
43881 Devin Shafron (Bldg B)
|
|
7.26 miles
|
PowerHouse Pacific
|
|
7.28 miles
|
AOL: 7777 Infantry Ridge
|
|
7.28 miles
|
Digital Realty: Broderick Drive
|
|
7.29 miles
|
43915 Devin Shafron (Bldg A)
|
|
7.30 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
7.32 miles
|
43831 Devin Shafron (Bldg C)
|
|
7.35 miles
|
Equinix Manassas DC14
|
|
7.35 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
7.39 miles
|
Amazon IAD-54
|
|
7.39 miles
|
43791 Devin Shafron (Bldg D)
|
|
7.41 miles
|
43830 Devin Shafron (Bldg F)
|
|
7.48 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
7.48 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
7.48 miles
|
43790 Devin Shafron (Bldg E)
|
|
7.51 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
7.52 miles
|
44372 Round Table: Digital Realty
|
|
7.54 miles
|
44274 Round Table (Bldg L)
|
|
7.54 miles
|
44751 Round Table (Bldg P)
|
|
7.57 miles
|
ANEXIO Reston
|
|
7.57 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
7.67 miles
|
CloudHQ Ashburn Campus
|
|
7.75 miles
|
Aligned IAD02
|
|
7.76 miles
|
Equinix DC21
|
|
7.76 miles
|
Equinix DC13
|
|
7.79 miles
|
CloudHQ LC2
|
|
7.85 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
7.88 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
7.90 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
7.95 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
7.95 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
7.98 miles
|
Equinix Ashburn DC11
|
|
7.98 miles
|
Equinix Ashburn DC6
|
|
7.99 miles
|
VPLS IAD
|
|
7.99 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
8.03 miles
|
Equinix Ashburn DC1
|
|
8.05 miles
|
Equinix Ashburn DC5
|
|
8.06 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
8.07 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
8.07 miles
|
21710 Charles View
|
|
8.08 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
8.09 miles
|
Equinix Ashburn DC4
|
|
8.10 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
8.16 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
8.17 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
8.18 miles
|
FastServ Ashburn
|
|
8.19 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
8.19 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
8.19 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
8.26 miles
|
PowerHouse ABX1
|
|
8.26 miles
|
21641 Charles View
|
|
8.28 miles
|
NTT VA5
|
|
8.30 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
8.30 miles
|
ANEXIO Ashburn IAD4
|
|
8.31 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
8.32 miles
|
NTT Ashburn Campus
|
|
8.32 miles
|
Amazon 45305 Severn
|
|
8.32 miles
|
DataBank Ashburn IAD3
|
|
8.34 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
8.35 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
8.37 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
8.38 miles
|
44490 Chilum Place: Digital Realty
|
|
8.39 miles
|
Amazon 45259 Severn
|
|
8.41 miles
|
NTT VA4
|
|
8.41 miles
|
Rackspace Ashburn IAD3
|
|
8.41 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
8.45 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
8.46 miles
|
44470 Chillum - Digital Realty
|
|
8.46 miles
|
ServerCentral Ashburn DC3
|
|
8.46 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
8.47 miles
|
Lumen Ashburn
|
|
8.47 miles
|
Equinix DC15
|
|
8.48 miles
|
Amazon IAD32
|
|
8.49 miles
|
ANEXIO VA1
|
|
8.49 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
8.53 miles
|
Amazon IAD10
|
|
8.54 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
8.66 miles
|
NTT VA2
|
|
8.66 miles
|
CyrusOne Sterling VIII
|
|
8.67 miles
|
Amazon 7500 Bethlehem
|
|
8.69 miles
|
CyrusOne Northern Virginia Sterling V
|
|
8.69 miles
|
EdgeCore: Ashburn, AS01
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
8.75 miles
|
COPT: 45761 Maries Rd
|
|
8.75 miles
|
Amazon 44858 Interconnection Plaza
|
|
8.77 miles
|
Amazon 44854 Interconnection
|
|
8.78 miles
|
Amazon IAD7
|
|
8.78 miles
|
Amazon 44862 Interconnection Plaza
|
|
8.81 miles
|
Cyxtera Sterling DC2
|
|
8.82 miles
|
Cyxtera Sterling DC3
|
|
8.82 miles
|
Amazon IAD24
|
|
8.83 miles
|
COPT: 45751 Maries Rd
|
|
8.89 miles
|
Amazon IAD11
|
|
8.91 miles
|
Cyxtera Sterling DC4
|
|
8.93 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
8.93 miles
|
Amazon IAD60
|
|
8.95 miles
|
Amazon IAD71
|
|
8.96 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
8.98 miles
|
Amazon IAD-69
|
|
8.99 miles
|
Amazon IAD50
|
|
9.03 miles
|
Amazon IAD-59
|
|
9.08 miles
|
Amazon IAD-52
|
|
9.11 miles
|
EdgeCore Ashburn
|
|
9.15 miles
|
Amazon IAD14
|
|
9.44 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
9.46 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
9.49 miles
|
Amazon: 8190 Bethlehem
|
|
9.55 miles
|
Amazon Bethlehem Technology Park DC18
|
|
9.58 miles
|
Amazon Bethlehem Technology Park DC19
|
|
9.59 miles
|
Amazon Bethlehem Technology Park DC20
|
|
9.77 miles
|
Corscale: Gainesville Crossing
|
|
9.77 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
9.81 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
9.81 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
9.83 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
9.84 miles
|
Iron Mountain VA-2
|
|
9.88 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
9.94 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
10.00 miles
|
Opus Interactive Manassas
|
|
10.09 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
10.11 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
10.15 miles
|
Amazon IAD-74
|
|
10.15 miles
|
Amazon IAD-73
|
|
10.17 miles
|
9020 Freedom Center
|
|
10.25 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
10.26 miles
|
9040 Freedom Center
|
|
10.36 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
10.42 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
10.48 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
10.53 miles
|
QTS Manassas DC1
|
|
10.66 miles
|
QTS Manassas DC5
|
|
10.79 miles
|
QTS 10680 University Blvd
|
|
10.90 miles
|
Yondr Bristow Campus
|
|
10.93 miles
|
NTT Gainesville VA Campus
|
|
10.93 miles
|
Compass Loudoun County
|
|
11.33 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
11.33 miles
|
Evoswitch USA WDC 1
|
|
11.33 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
11.33 miles
|
Amazon IAD-77
|
|
11.47 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
11.50 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
11.50 miles
|
Amazon: 11150 Thomasson Barn
|
|
11.50 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
11.51 miles
|
XO Fairfax
|
|
11.54 miles
|
Amazon: 11200 Thomasson Barn
|
|
11.55 miles
|
AWS 10261 Tanner
|
|
11.56 miles
|
Google Leesburg Stonewall Park
|
|
11.56 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
11.59 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
11.65 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
11.67 miles
|
AWS IAD 101
|
|
11.68 miles
|
AWS 10281 Tanner Way
|
|
11.72 miles
|
Equinix Vienna DC8
|
|
11.79 miles
|
AWS IAD 100
|
|
12.01 miles
|
Amazon IAD-55
|
|
12.03 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
12.17 miles
|
Amazon: 15455 John Marshall
|
|
12.18 miles
|
Cogent Vienna
|
|
12.24 miles
|
Amazon 15465 John Marshall
|
|
12.27 miles
|
8100 Boone - Digital Realty
|
|
12.46 miles
|
CloudHQ MCC2
|
|
12.53 miles
|
Equinix Vienna DC7
|
|
12.58 miles
|
Element Critical VA1
|
|
12.71 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
12.77 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
12.88 miles
|
CloudHQ MCC3
|
|
12.98 miles
|
DataBank McLean IAD2
|
|
13.04 miles
|
Lumen McLean 1
|
|
13.48 miles
|
Microsoft Leesburg 1A
|
|
13.95 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
15.89 miles
|
OVH US East Vint Hill
|
|