Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
1.87 miles
|
HubInterested in this information?Contact us
|
|
|
1.90 miles
|
South HubInterested in this information?Contact us
|
The site started construction in 2012.
|
|
1.98 miles
|
CentralInterested in this information?Contact us
|
|
|
1.98 miles
|
East CampusInterested in this information?Contact us
|
|
|
2.01 miles
|
East CampusInterested in this information?Contact us
|
|
|
2.02 miles
|
Station PlusInterested in this information?Contact us
|
|
|
4.62 miles
|
HubInterested in this information?Contact us
|
|
|
4.65 miles
|
Center AlphaInterested in this information?Contact us
|
|
|
4.66 miles
|
GlobalInterested in this information?Contact us
|
|
|
4.69 miles
|
EdgeInterested in this information?Contact us
|
|
|
6.04 miles
|
EastInterested in this information?Contact us
|
|
|
6.11 miles
|
Hub GammaInterested in this information?Contact us
|
|
|
6.12 miles
|
Campus ProInterested in this information?Contact us
|
|
|
6.20 miles
|
East ParkInterested in this information?Contact us
|
|
|
7.79 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
7.86 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
7.92 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.93 miles
|
BetaInterested in this information?Contact us
|
|
|
7.95 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.02 miles
|
Edge PlazaInterested in this information?Contact us
|
|
|
8.12 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.16 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
10.61 miles
|
Central ValleyInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
10.67 miles
|
Edge StationInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
10.76 miles
|
North TowerInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
10.83 miles
|
South CenterInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
18.82 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
18.83 miles
|
ThreeInterested in this information?Contact us
|
|
|
18.84 miles
|
ThreeInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
18.86 miles
|
ValleyInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
18.87 miles
|
Campus PlusInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
18.93 miles
|
SouthInterested in this information?Contact us
|
|
|
18.97 miles
|
Park ProInterested in this information?Contact us
|
|
|
19.10 miles
|
PointInterested in this information?Contact us
|
|
|
19.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.45 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.46 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.49 miles
|
East CampusInterested in this information?Contact us
|
|
|
19.51 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.91 miles
|
West ValleyInterested in this information?Contact us
|
|
|
19.94 miles
|
PrimeInterested in this information?Contact us
|
|
|
19.96 miles
|
Tower PrimeInterested in this information?Contact us
|
Amazon plans a $4.8 billion data center campus with 16 buildings to be developed in four phases. Each phase will cover 125 acres and include four 215,000-square-foot buildings, totaling 3.4 million square feet.
|