AWS Proposes $1.2 Billion Data Center Campus Outside Housto
July 08, 2026
Amazon AWS
The facility is located in the IDA Business and Technology Park, Donore Road, Drogheda, Co Meath.
| Distance | Site | About |
|---|---|---|
| 0.10 miles | Hyperscale Data Center Request Dataset |
Amazon is constructing a two-story data center spanning 28,566 square meters (307,400 square feet) at the Drogheda IDA Business & Technology Park.
|
| 1.51 miles | Premier Periclase: Drogheda |
Proposed by Premier Periclase Limited, the development at the Boyne Road facility in Drogheda includes a 26,550 sqm three-story data center and a dedicated energy center powered primarily by natural gas.
|
| 1.51 miles | Greencoat: Drogheda Energy Park |
Greencoat Renewables and Schroders Greencoat launched a 50/50 green digital infrastructure joint venture to develop Drogheda Energy Park in County Louth, Ireland in March, 2026.
|
| 19.25 miles | EngineNode: Meath DC2 |
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
| 19.28 miles | EngineNode Meath |
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
| 19.28 miles | EngineNode: Meath DC3 |
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
| 19.31 miles | EngineNode: Meath DC4 |
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
| 19.83 miles | Hyperscale Data Center Request Dataset |
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
| 19.84 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Clonee Campus in Ireland.
|
| 19.84 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Clonee Campus in Ireland.
|
| 19.87 miles | Hyperscale Data Center Request Dataset |
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
| 19.88 miles | Hyperscale Data Center Request Dataset |
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
| 19.90 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Clonee Campus in Ireland.
|
| 19.93 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Clonee Campus in Ireland.
|
| 19.93 miles | Hyperscale Data Center Request Dataset |
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
| 19.95 miles | Hyperscale Data Center Request Dataset |
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
|
| 19.97 miles | Hyperscale Data Center Request Dataset |
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
July 08, 2026
Amazon AWS
July 06, 2026
Amazon AWS
July 02, 2026
Amazon AWS
June 22, 2026
Amazon AWS
June 12, 2026
Amazon AWS
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas