|
0.34 miles
|
East StationInterested in this information?Contact us
|
|
|
0.36 miles
|
Global ParkInterested in this information?Contact us
|
|
|
0.40 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
0.43 miles
|
Point UltraInterested in this information?Contact us
|
The site started construction in 2012.
|
|
0.58 miles
|
West PlazaInterested in this information?Contact us
|
|
|
0.60 miles
|
MaxInterested in this information?Contact us
|
|
|
1.64 miles
|
West TowerInterested in this information?Contact us
|
|
|
1.73 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
1.78 miles
|
Center PlusInterested in this information?Contact us
|
|
|
1.87 miles
|
HubInterested in this information?Contact us
|
|
|
2.88 miles
|
HubInterested in this information?Contact us
|
|
|
2.93 miles
|
CenterInterested in this information?Contact us
|
|
|
2.96 miles
|
CoreInterested in this information?Contact us
|
|
|
3.00 miles
|
Station GammaInterested in this information?Contact us
|
|
|
4.50 miles
|
Plaza TwoInterested in this information?Contact us
|
|
|
4.57 miles
|
North RidgeInterested in this information?Contact us
|
|
|
4.62 miles
|
UltraInterested in this information?Contact us
|
|
|
4.69 miles
|
BetaInterested in this information?Contact us
|
|
|
7.64 miles
|
North RidgeInterested in this information?Contact us
|
|
|
7.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.72 miles
|
RidgeInterested in this information?Contact us
|
|
|
7.79 miles
|
East TowerInterested in this information?Contact us
|
|
|
7.88 miles
|
Point OneInterested in this information?Contact us
|
|
|
7.90 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.92 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.68 miles
|
Station ProInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.75 miles
|
Hub MaxInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.80 miles
|
EdgeInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.88 miles
|
ProInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
17.04 miles
|
MetroInterested in this information?Contact us
|
|
|
17.05 miles
|
Global PlazaInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
17.07 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
17.07 miles
|
West HubInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
17.09 miles
|
WestInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
17.17 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
17.21 miles
|
CloudInterested in this information?Contact us
|
|
|
17.34 miles
|
North ParkInterested in this information?Contact us
|
|
|
17.64 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.67 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.69 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.71 miles
|
CampusInterested in this information?Contact us
|
|
|
17.73 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
18.13 miles
|
MetroInterested in this information?Contact us
|
|
|
18.15 miles
|
Metro CenterInterested in this information?Contact us
|
|
|
18.24 miles
|
GammaInterested in this information?Contact us
|
|
|
18.99 miles
|
Edge RidgeInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
19.02 miles
|
Central PlazaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.22 miles
|
Point UltraInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.25 miles
|
EdgeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.38 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
19.51 miles
|
Point OneInterested in this information?Contact us
|
|
|
19.56 miles
|
Metro ParkInterested in this information?Contact us
|
|
|
19.67 miles
|
Edge TowerInterested in this information?Contact us
|
Construction started in 2012.
|