The site started construction in 2012.
|
|
0.22 miles
|
East HubInterested in this information?Contact us
|
|
|
0.25 miles
|
PrimeInterested in this information?Contact us
|
|
|
0.36 miles
|
PointInterested in this information?Contact us
|
|
|
0.60 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
1.74 miles
|
OneInterested in this information?Contact us
|
|
|
1.83 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
1.88 miles
|
Global PlazaInterested in this information?Contact us
|
|
|
1.98 miles
|
PointInterested in this information?Contact us
|
|
|
2.67 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
2.70 miles
|
Tower AlphaInterested in this information?Contact us
|
|
|
2.73 miles
|
Station PlusInterested in this information?Contact us
|
|
|
2.76 miles
|
Center ProInterested in this information?Contact us
|
|
|
4.22 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
4.29 miles
|
Plaza ThreeInterested in this information?Contact us
|
|
|
4.33 miles
|
Core CampusInterested in this information?Contact us
|
|
|
4.40 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.29 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.34 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.34 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.37 miles
|
CoreInterested in this information?Contact us
|
|
|
7.43 miles
|
Cloud TowerInterested in this information?Contact us
|
|
|
7.53 miles
|
CampusInterested in this information?Contact us
|
|
|
7.54 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.57 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.33 miles
|
SouthInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.40 miles
|
Tower GammaInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.45 miles
|
West PointInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
9.53 miles
|
UltraInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
16.87 miles
|
Valley GammaInterested in this information?Contact us
|
|
|
16.87 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
16.87 miles
|
PrimeInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.90 miles
|
Valley ThreeInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.91 miles
|
Core ParkInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.98 miles
|
Plaza ThreeInterested in this information?Contact us
|
|
|
17.02 miles
|
Ridge AlphaInterested in this information?Contact us
|
|
|
17.15 miles
|
BetaInterested in this information?Contact us
|
|
|
17.46 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.49 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.50 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.53 miles
|
TowerInterested in this information?Contact us
|
|
|
17.55 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.95 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
17.98 miles
|
Cloud ValleyInterested in this information?Contact us
|
|
|
18.06 miles
|
Central StationInterested in this information?Contact us
|
|
|
18.77 miles
|
Ridge ThreeInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
18.81 miles
|
MetroInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.00 miles
|
Point ProInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.03 miles
|
EdgeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
19.19 miles
|
MetroInterested in this information?Contact us
|
|
|
19.33 miles
|
PointInterested in this information?Contact us
|
|
|
19.37 miles
|
ProInterested in this information?Contact us
|
|
|
19.49 miles
|
Station PlusInterested in this information?Contact us
|
Construction started in 2012.
|