Operational
Fully operational facility
Operated by:

Amazon: 7951 Loisdale

Year Built: 2026
Floors: 2
Lot Size: 18 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.

They were replaced by a 100-foot-tall data center and an adjoining 55,500-square-foot generator yard. Standing at two stories, the building has a gross area of 240,000 square feet. The overall site totals 17.5 acres

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

PlazaInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Ridge OneInterested in this information?Contact us

Distance Site About
4.79 miles Starwood: Alexandria, VA
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
8.67 miles TAC: Northern Virginia
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
11.61 miles Element Critical VA1
11.63 miles Equinix Vienna DC7
11.99 miles Cogent Vienna
12.03 miles 8100 Boone - Digital Realty
12.34 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
12.35 miles Lumen McLean 1
13.36 miles Equinix Vienna DC8
13.54 miles Lumen DC4
13.90 miles CoreSite DC2
13.93 miles Verizon: 1120 Vermont
Former XO Communications site
13.94 miles Cogent: 1120 Vermont
13.94 miles Lumen DC 1
13.95 miles CoreSite DC1 - 1275 K Street NW
1275 K Street is Washington DC's Network Hotel
13.98 miles Lumen DC2
13.98 miles Verizon: 1220 L
14.48 miles EdgeInterested in this information?Contact us
14.92 miles Quantico Ridge Data Center
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
15.33 miles Center BetaInterested in this information?Contact us
Amazon Data Services acquired 91 acres in Manassas for $218m
15.48 miles Verizon: 4301 Connecticut
16.13 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
16.20 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
16.33 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
16.54 miles North RidgeInterested in this information?Contact us
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
16.56 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
16.61 miles PointInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
16.75 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
16.76 miles GammaInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
16.79 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
16.83 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
16.89 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
16.91 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
16.97 miles CloudHQ Manassas MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
17.01 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
17.03 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
17.12 miles Digital Realty: 9905 Godwin
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
17.13 miles Hub PrimeInterested in this information?Contact us
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
17.15 miles SouthInterested in this information?Contact us
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
17.24 miles GammaInterested in this information?Contact us
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
17.26 miles Metro PointInterested in this information?Contact us
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
17.29 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
17.29 miles CoreSite Reston Campus VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
17.33 miles Digital Realty: IAD51
17.33 miles CoreSite VA2
17.35 miles CloudHQ: Manassas MDC Campus
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
17.37 miles Digital Realty: IAD50
17.40 miles CoreSite Reston VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
17.46 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
17.47 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
17.48 miles Parkstone Tech Park
17.50 miles QTS: Manassas DC3
This facility is part of QTS Data Center Campus in Manassas.
17.56 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
17.58 miles QTS: Manassas DC2
This facility is part of QTS Data Center Campus in Manassas.
17.59 miles QTS Manassas DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
17.60 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
17.63 miles QTS Manassas DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
17.66 miles North StationInterested in this information?Contact us
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
17.68 miles TPC: Manassas, VA
17.74 miles QTS: Manassas DC4
17.74 miles Center MaxInterested in this information?Contact us
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
17.74 miles HubInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
17.77 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
17.79 miles Hub GammaInterested in this information?Contact us
Amazon is building another data center in it's Innovation Drive campus.
17.86 miles QTS Manassas DC5
This facility is part of QTS Data Center Campus in Manassas.
17.86 miles Tower UltraInterested in this information?Contact us
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
17.87 miles Stack: Northern Virginia NVA05
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
17.88 miles Tower MaxInterested in this information?Contact us
17.90 miles RidgeInterested in this information?Contact us
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
17.91 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
17.91 miles TwoInterested in this information?Contact us
17.92 miles Edge RidgeInterested in this information?Contact us
17.94 miles Tower AlphaInterested in this information?Contact us
17.96 miles Edge CampusInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
17.98 miles ThreeInterested in this information?Contact us
17.98 miles Equinix Manassas DC14
18.01 miles Global CampusInterested in this information?Contact us
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
18.01 miles Edge PlazaInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
18.01 miles Global PointInterested in this information?Contact us
18.02 miles Central CenterInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
18.02 miles Valley BetaInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
18.07 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
18.08 miles Verizon: 7777 Infantry Ridge
Former AOL data center
18.16 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
18.18 miles EastInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
18.26 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
18.29 miles BetaInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
18.34 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
18.35 miles H5: Herndon
18.42 miles CentralInterested in this information?Contact us
18.44 miles Prime TowerInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
18.45 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
18.46 miles PlusInterested in this information?Contact us
18.47 miles Ridge MaxInterested in this information?Contact us
18.53 miles Metro CampusInterested in this information?Contact us
18.53 miles Hub MaxInterested in this information?Contact us
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
18.54 miles Center PlusInterested in this information?Contact us
18.55 miles Core RidgeInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
18.58 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
18.61 miles Cloud RidgeInterested in this information?Contact us
18.61 miles VAZATA Northern Virginia (NoVa One)
18.61 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
18.61 miles Evoswitch USA WDC 1
18.65 miles ProInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
18.66 miles Lumen Herndon 3
18.68 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
18.68 miles Lumen Herndon 1
18.68 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
18.68 miles Stack: NVA02C
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
18.69 miles Stack: NVA02B
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
18.71 miles Stack: Northern Virginia, NVA02
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
18.74 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
18.87 miles Stack: NVA02D
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
18.93 miles Stack: NVA02F
This facility is part of Stack's NVA02 Campus in Northern Virginia.
18.94 miles Stack: NVA02G
This facility is part of Stack's NVA02 Campus in Northern Virginia.
18.98 miles Stack: NVA02E
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
19.07 miles West ValleyInterested in this information?Contact us
19.07 miles RidgeInterested in this information?Contact us
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
19.09 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
19.10 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
19.13 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
19.13 miles Park AlphaInterested in this information?Contact us
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
19.15 miles Ridge ProInterested in this information?Contact us
19.17 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
19.21 miles East ParkInterested in this information?Contact us
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
19.21 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
19.24 miles Stack: NVA02J
This facility is part of Stack's NVA02 Campus in Northern Virginia.
19.24 miles Stack: NVA02I
This facility is part of Stack's NVA02 Campus in Northern Virginia.
19.25 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
19.25 miles CentralInterested in this information?Contact us
19.26 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
19.26 miles East TowerInterested in this information?Contact us
19.31 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
19.31 miles Tower PrimeInterested in this information?Contact us
19.31 miles Stack: Bristow Campus (NVA02K)
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
19.34 miles Hub MaxInterested in this information?Contact us
19.36 miles Tower GammaInterested in this information?Contact us
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
19.36 miles Stack: NVA02H
This facility is part of Stack's NVA02 Campus in Northern Virginia.
19.37 miles Center OneInterested in this information?Contact us
19.39 miles CampusInterested in this information?Contact us
19.46 miles Opus Interactive Manassas
19.49 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
19.52 miles PrimeInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
19.53 miles Iron Mountain VA-2
19.60 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
19.67 miles PointInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
19.71 miles Tower PrimeInterested in this information?Contact us
19.77 miles West ValleyInterested in this information?Contact us
19.78 miles Plaza BetaInterested in this information?Contact us
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
19.79 miles West CampusInterested in this information?Contact us
19.80 miles ValleyInterested in this information?Contact us
19.83 miles Hub GammaInterested in this information?Contact us
19.85 miles Center ThreeInterested in this information?Contact us

Global CenterInterested in this information?Contact us Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

583
Facilities
65
Markets

News See all

Read AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn
Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to de...

AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn

July 31, 2026 Amazon AWS

Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to develop a four-building, 800,000 sq ft (74,320 sqm) data center campus at the former George Washington...

Read more
Read AWS Proposes $1.2 Billion Data Center Campus Outside Housto
Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Ea...

AWS Proposes $1.2 Billion Data Center Campus Outside Housto

July 08, 2026 Amazon AWS

Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Eagle” will include four buildings on a roughly 2,700-acre site in Wharton County near FM 1301 and FM...

Read more
Read Amazon Expands Mumbai Data Center Land Lease by four Acres
Amazon has leased an additional four acres of land at its site in Powai, Mumbai, expanding its data center footprint in India. According to *The Economic Times*, the land has been leased from Larse...

Amazon Expands Mumbai Data Center Land Lease by four Acres

July 06, 2026 Amazon AWS

Amazon has leased an additional four acres of land at its site in Powai, Mumbai, expanding its data center footprint in India. According to The Economic Times, the land has been leased from Larsen & Toubro Ltd under a 17-year agreement through Amazon Data Services, the company's primary data...

Read more
Read AWS reports record expansion in 2025, adding 1.2GW of data centre capacity in Q4 alone
Amazon Web Services (AWS) highlighted strong expansion in its latest sustainability report, saying it added more data centre capacity globally than any other company last year, including over 1.2GW...

AWS reports record expansion in 2025, adding 1.2GW of data centre capacity in Q4 alone

July 02, 2026 Amazon AWS

Amazon Web Services (AWS) highlighted strong expansion in its latest sustainability report, saying it added more data centre capacity globally than any other company last year, including over 1.2GW in Q4 alone. Between October 2024 and October 2025, AWS added a total of 3.8GW. CEO Andy Jassy said...

Read more
Read Amazon Employees Back Data Center Regulations, Allege Workplace Retaliation
Three Amazon employees have alleged that the company retaliated against them after they testified in support of a Seattle data center moratorium. According to reports, the employees—Darius Irani, P...

Amazon Employees Back Data Center Regulations, Allege Workplace Retaliation

June 22, 2026 Amazon AWS

Three Amazon employees have alleged that the company retaliated against them after they testified in support of a Seattle data center moratorium. According to reports, the employees—Darius Irani, Patrick Schloesser, and Liesl Wigand, all members of Amazon Employees for Climate Justice (AECJ)—were...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?