Pennsylvania Data Center Market

Latest Podcast
The Pennsylvania data center market joins two established colocation metros, Philadelphia and Pittsburgh, with one of the largest development pipelines in PJM. Developers come for nuclear plants, Marcellus Shale gas, retired coal and steel sites, and land between the Northeast and the Midwest. Utility load queues, a new large-load tariff and township zoning fights set the pace. Read More

Market Facts

Pennsylvania Data Center Map

Pennsylvania Power Growth Over Time

+99% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Pennsylvania

Aligned
Site
Power
Operational
0
0.0
Construction
1
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
PowerHouse Data Centers
Site
Power
Operational
0
0.0
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Amazon AWS
Site
Power
Operational
1
50.0
Construction
2
Planned
3
Prospective Expansion
2
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Chirisa Investments
Site
Power
Operational
0
0.0
Construction
1
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Pennsylvania

Location About Total SqFt Power (MW)
EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Big Digital Energy: Midland, PA
Big Digital Energy, formerly Mawson Infrastructure Group, runs a Bitcoin mining data center in mo...
NN Request Dataset
TierPoint: TEK Building 4
TierPoint's Allentown data center is Building 4 on the former Bell Labs TekPark campus near Brein...
NN Request Dataset NN Request Dataset
CoreWeave: Allentown TekPark
CoreWeave runs a high-density GPU deployment in TierPoint's Allentown data center, Building 4 on ...
NN Request Dataset
Iron Mountain The Underground
Iron Mountain's WPA-1 is a colocation data center 220 feet underground in a former limestone mine...
NN Request Dataset

Regions in Pennsylvania

Data Center Events in Pennsylvania See all

2 events
Event Starts in Details
149 days
View Advancing Data Center Construction Mid-Atlantic 2027
Organized by:
Advancing Construction
Type:
Data Center
Description:

Advancing Data Center Construction Mid-Atlantic is an executive gathering organized by Advancing Construction, a division of Hanson Wade Group, focused on digital infrastructure delivery across Mid-Atlantic and Northeastern hubs. Scheduled for April 26 to 28, 2027 at the Wyndham Grand Pittsburgh Downtown, the conference brings together more than 100 industry leaders, including hyperscale owners...

228 days
View RE+ Mid-Atlantic 2027
Organized by:
Solar Energy Industries Association
Type:
Power
Description:

RE+ Mid-Atlantic 2027 is a regional clean energy conference and exhibition for the solar and energy storage market. It runs July 14 to 15, 2027, at the Pennsylvania Convention Center in Philadelphia. The Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA) produce the event through RE+ Events. The event brings together buyers, suppliers, distributors, and cons...

About Pennsylvania

Pennsylvania Data Center Market Overview

Pennsylvania has two long-standing colocation markets and a fast-growing belt of hyperscale and AI campuses between them. Philadelphia anchors the east on the Northeast fiber corridor. Pittsburgh anchors the west on Marcellus Shale gas and river sites. Since 2024, developers have filed plans for gigawatt campuses in the northeast, the Lehigh Valley, the Susquehanna Valley and south-central Pennsylvania. Power, not demand, decides which of them get built.

History

Pennsylvania's data-center story starts in its telecom buildings. Philadelphia's carrier hotel at 401 North Broad Street went up between 1929 and 1931 as a railroad freight terminal. SunGard leased disaster-recovery space there in 1984, and carriers followed. Switch and Data ran colocation in both Philadelphia and Pittsburgh by 2000. Equinix bought Switch and Data in 2010.

The 2010s added suburban and rural sites. TierPoint grew its largest Pennsylvania campus at TekPark, a 1987 Bell Labs complex in the Lehigh Valley. Iron Mountain runs a data center 220 feet underground in a former limestone mine at Boyers. Keystone NAP stacked modular halls on the former U.S. Steel Fairless Works in Bucks County and closed at the end of 2021.

Bitcoin mining arrived next on waste-coal and nuclear power. Stronghold Digital mined at its Scrubgrass and Panther Creek plants. Bitfarms, now Keel Infrastructure, bought Stronghold in March 2025 and ended mining in June 2026. Talen Energy opened its first data center beside the Susquehanna nuclear plant in early 2023. In March 2024 Talen sold that campus to Amazon Web Services (AWS) for $650 million. Amazon pledged $20 billion for Pennsylvania data centers in June 2025. A month later, an energy summit in Pittsburgh drew about $90 billion of pledges.

Data Centers in Pennsylvania Today

The Philadelphia region holds the state's densest colocation. Center City carrier hotels serve enterprises, carriers and cloud on-ramps. Hyperscale growth sits in the suburbs, the Lehigh Valley and Lancaster County. Amazon is building in Falls Township in Bucks County, and CoreWeave is building in Lancaster.

The Pittsburgh region pairs a small downtown colocation market with large power-led builds on old industrial land. Aligned is building at Shippingport, and Switch owns land for a campus at Wampum. A planned gas-fired redevelopment of the former Homer City coal plant sits at the region's eastern edge.

Northeast Pennsylvania has become the busiest filing ground. Lackawanna County alone holds more than a dozen proposals, including Corscale's Project Gravity at Archbald. Nebius has started its first phase at Highridge in Schuylkill County. In south-central Pennsylvania, PowerHouse Data Centers is building near Carlisle. Corscale also plans two campuses near Harrisburg.

Why Build Data Centers in Pennsylvania?

  • Power supply. Four operating nuclear plants and Marcellus Shale gas make Pennsylvania the largest net exporter of electricity among the states.
  • Brownfield land. Retired coal plants, steel mills and industrial parks offer transmission, water and industrial zoning.
  • Location. The state sits between the New York, Washington and Midwest markets, with long-haul fiber along its highways and rail lines.
  • Tax treatment. Since 2022, qualifying data-center equipment has been exempt from state sales and use tax.
  • Climate. Cool winters and mild summers cut the hours of mechanical cooling.

What Limits Data Center Growth in Pennsylvania?

  • Grid access. PPL Electric Utilities reported 31.8 GW of advanced-stage data-center requests in August 2026. That total far exceeds what its system can serve soon.
  • Large-load tariff. The Pennsylvania Public Utility Commission (PUC) issued a model tariff in May 2026 for loads above 50 MW. It guides utilities to require collateral, minimum bills and upfront payment for grid upgrades.
  • Local approvals. Townships have denied or stalled several large campuses, and appeals now run through the courts. State lawmakers floated a statewide moratorium in March 2026.
  • Permits before construction. The state requires every permit before groundwork. A major-source air permit for on-site gas generation takes well over a year.
  • Air quality. The Philadelphia area is an ozone non-attainment zone. That status tightens limits on generators and on-site power plants.

Pennsylvania Data Center Trends

  • Gigawatt land plays. Developers file for far more power than utilities can deliver, and many sites change hands before groundbreaking.
  • Bring your own power. A 4.5 GW gas plant is planned for the Homer City campus, and other western sites plan fuel cells or on-site gas.
  • Crypto to AI. Miners have switched off rigs to chase AI tenants. Talen's mine beside Susquehanna closed in 2025, and Keel stopped mining in 2026.
  • Nuclear deals. Data-center buyers now sign long-term contracts with nuclear plants. The Susquehanna sale set the pattern for the state.

Power and Policy in Pennsylvania

PJM Interconnection runs the grid across the whole state. The PUC regulates the investor-owned utilities: PECO around Philadelphia, PPL in the east and center, and Duquesne Light in Pittsburgh. FirstEnergy Pennsylvania serves much of the rest of the state. Rural electric co-ops and dozens of municipal boroughs serve smaller areas outside PUC rate rules. The PUC's May 2026 large-load order guides each utility's own tariff filings. The Department of Environmental Protection (DEP) issues most air permits, but the Allegheny County Health Department runs its own air program.

Get Quotes

Related News See all

Read Prologis Sells 1M Sq Ft Lehigh Valley Warehouse To Fluidstack For $162.9M
[Prologis](https://baxtel.com/data-centers/prologis) has sold a one-million-square-foot warehouse in Northampton, Pennsylvania, to the AI cloud provider [Fluidstack](https://baxtel.com/data-centers...

Prologis Sells 1M Sq Ft Lehigh Valley Warehouse To Fluidstack For $162.9M

November 26, 2026 Prologis

Prologis has sold a one-million-square-foot warehouse in Northampton, Pennsylvania, to the AI cloud provider Fluidstack for $162.9 million. The price works out to about $161 per square foot, Data Center Dynamics reported, citing Commercial Property Executive. Prologis owned and developed the...

Read more
Read Arrests Follow Threats To Olyphant Council Over $101M Data Center Deal
Police in Olyphant, Pennsylvania, have arrested suspects over threats to borough council members after the council approved a $101 million data center settlement. Olyphant police say council member...

Arrests Follow Threats To Olyphant Council Over $101M Data Center Deal

November 26, 2026 Scranton (Northeast Pennsylvania)

Police in Olyphant, Pennsylvania, have arrested suspects over threats to borough council members after the council approved a $101 million data center settlement. Olyphant police say council members were threatened in person and on social media. The threats followed the council's 5-2 vote on...

Read more
Read AMD Named Tenant for 5C's 160MW Project Phoenix Data Center
AMD is the intended end user of a proposed data center in Mount Carmel Township, [Pennsylvania](https://baxtel.com/regions/pennsylvania), under an executed lease agreement. The conditional use appl...

AMD Named Tenant for 5C's 160MW Project Phoenix Data Center

November 20, 2026 5C Data Centers

AMD is the intended end user of a proposed data center in Mount Carmel Township, Pennsylvania, under an executed lease agreement. The conditional use application on file with the township lists AMD as the tenant of the first building, The News-Item reported. The project, called Project Phoenix,...

Read more
Read Invitium Energy Agrees 2GW Generation Deal To Power QTS Salem Township Campus
PPL's Invitium Energy venture [has agreed to supply](https://www.prnewswire.com/news-releases/ppl-corporation-delivers-strong-third-quarter-2026-earnings-raises-longterm-eps-growth-outlook-30293202...

Invitium Energy Agrees 2GW Generation Deal To Power QTS Salem Township Campus

November 10, 2026 QTS Data Centers

PPL's Invitium Energy venture has agreed to supply about 2GW of generation to QTS Data Centers' Salem Township, Pennsylvania, project. The 20-year initial term allows multiple five-year renewals, and the term sheet is nonbinding and subject to conditions precedent. The term sheet advances...

Read more
Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read LS Electric Wins $138m Switchgear Order for Bloom Fuel Cells at Pennsylvania Data Center
South Korean electrical equipment maker LS Electric has secured a 185.3 billion won ($138.5m) order from Bloom Energy to supply switchgear and distribution transformers for fuel cells at a Pennsylv...

LS Electric Wins $138m Switchgear Order for Bloom Fuel Cells at Pennsylvania Data Center

October 14, 2026 Pennsylvania

South Korean electrical equipment maker LS Electric has secured a 185.3 billion won ($138.5m) order from Bloom Energy to supply switchgear and distribution transformers for fuel cells at a Pennsylvania data center. Deliveries of the 38kV equipment are expected between April and July next year....

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Documents

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.