|
0.07 miles
|
HubInterested in this information?Contact us
|
|
|
0.07 miles
|
Station ThreeInterested in this information?Contact us
|
|
|
0.16 miles
|
PrimeInterested in this information?Contact us
|
|
|
0.36 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.41 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.46 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.49 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
4.54 miles
|
MetroInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.56 miles
|
Edge PlazaInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.79 miles
|
Station TwoInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.80 miles
|
Hub TwoInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.86 miles
|
ValleyInterested in this information?Contact us
|
|
|
5.93 miles
|
Plaza ThreeInterested in this information?Contact us
|
|
|
6.04 miles
|
ParkInterested in this information?Contact us
|
|
|
6.08 miles
|
PointInterested in this information?Contact us
|
|
|
6.76 miles
|
South TowerInterested in this information?Contact us
|
|
|
6.83 miles
|
SouthInterested in this information?Contact us
|
|
|
6.91 miles
|
Station BetaInterested in this information?Contact us
|
|
|
6.99 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.12 miles
|
Hub TwoInterested in this information?Contact us
|
|
|
7.15 miles
|
Hub AlphaInterested in this information?Contact us
|
|
|
7.29 miles
|
Station BetaInterested in this information?Contact us
|
The site started construction in 2012.
|
|
7.37 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
7.39 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
7.72 miles
|
Plaza UltraInterested in this information?Contact us
|
|
|
7.72 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
7.81 miles
|
Central ParkInterested in this information?Contact us
|
|
|
7.82 miles
|
Core CampusInterested in this information?Contact us
|
|
|
7.84 miles
|
ProInterested in this information?Contact us
|
|
|
7.86 miles
|
CampusInterested in this information?Contact us
|
|
|
16.32 miles
|
PlusInterested in this information?Contact us
|
|
|
16.41 miles
|
NorthInterested in this information?Contact us
|
|
|
16.49 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
16.58 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
16.72 miles
|
Plaza GammaInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.75 miles
|
Station MaxInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.76 miles
|
OneInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.78 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
17.13 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.14 miles
|
Center ProInterested in this information?Contact us
|
|
|
17.15 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.16 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.18 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.51 miles
|
Campus UltraInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
17.51 miles
|
Edge PlazaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.58 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
17.65 miles
|
Valley OneInterested in this information?Contact us
|
|
|
17.66 miles
|
Global ValleyInterested in this information?Contact us
|
|
|
17.76 miles
|
OneInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.76 miles
|
Valley ThreeInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.54 miles
|
Center GammaInterested in this information?Contact us
|
|
|
18.68 miles
|
Cloud StationInterested in this information?Contact us
|
|
|
18.71 miles
|
Edge ParkInterested in this information?Contact us
|
|
|
18.87 miles
|
Core TowerInterested in this information?Contact us
|
Construction started in 2012.
|