OneInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Tucson, AZ 85747, United States
Withdrawn
Project cancelled before construction
Operated by:

Amazon: Project Blue

Lot Size: 290 acres
This site is leased from Beale Infrastructure in the Beale: Project Blue building

AWS’s proposed 630 MW campus was withdrawn over water constraints, despite its $3.6B valuation.

Amazon Web Services (AWS) had been planning a major data center campus in Tucson, Arizona, for a project codenamed "Project Blue." The intended development was a sprawling 290-acre site that was reportedly set to host at least three data centers, with some sources suggesting as many as 10 buildings had been planned. These buildings were projected to span a total of 2 million square feet.

Construction on the first phase was originally scheduled to begin in 2026 and finish by 2029, with the first data centers potentially becoming operational in 2027.

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Sites within 15 miles of RidgeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Beale: Project Blue
Project Blue, a massive 630 MW data center campus proposed by Beale Infrastructure and linked to Amazon Web Services (AWS), was withdrawn due to water constraints, despite a proposed investment of $3.6 billion.
NN milesInterested in this information?Contact us TECfusions: Tucson, AZ
Sat on eight acres in Pima County, the 133,450 sq ft (12,400 sqm) building offers 40,790 sq ft (3,790 sqm) of raised floor.
NN milesInterested in this information?Contact us Aphorio Carter: Tucson, AZ
Located on an eight-acre site in Pima County, Arizona, the 133,450 sq ft (12,400 sqm) facility includes 40,790 sq ft (3,790 sqm) of raised floor space and is fully leased to TECfusions.
NN milesInterested in this information?Contact us Ark: Tucson
NN milesInterested in this information?Contact us FirstTelecom: Tucson
NN milesInterested in this information?Contact us Simply Bits-Tucson
Simply Bits operates Simply Bits DC1, a 10,570 sq ft data center located in Tucson.
NN milesInterested in this information?Contact us DakotaPros: Tucson
DakotaPro employs 20+ people in Southern Arizona and operates a 14,400-square foot colocation facility and data center.
NN milesInterested in this information?Contact us Lumen Tucson 1

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read Generac Secures $8bn Backup Generator Deal With Amazon
Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. ...

Generac Secures $8bn Backup Generator Deal With Amazon

September 26, 2026 Amazon AWS

Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. Amazon will also have the option to buy nearly 1.7 million Generac shares. “It provides visibility...

Read more
Read Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio
Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joi...

Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio

September 21, 2026 Amazon AWS

Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joint venture between Rio Tinto and Alcoa. Its smelting process uses proprietary inert anodes instead...

Read more
Read Qualcomm And AWS Collaborate On Custom AI Silicon For Large-Scale Data Centers
Qualcomm is partnering with Amazon to develop customized AI infrastructure solutions. Under the multi-generational partnership, Qualcomm Technologies and Amazon will develop custom silicon for larg...

Qualcomm And AWS Collaborate On Custom AI Silicon For Large-Scale Data Centers

September 08, 2026 Amazon AWS

Qualcomm is partnering with Amazon to develop customized AI infrastructure solutions. Under the multi-generational partnership, Qualcomm Technologies and Amazon will develop custom silicon for large-scale AI data centers, focusing on AI inference and optical connectivity of up to 1.6T. The...

Read more
Read Amazon Acquires 8,000-Acre Texas Site for Gas-Powered Data Center
Amazon has acquired an 8,000-acre site in Pecos, Texas, where it plans to develop a data center powered by an on-site natural gas plant that could become one of the largest in the US. According to ...

Amazon Acquires 8,000-Acre Texas Site for Gas-Powered Data Center

August 10, 2026 Amazon AWS

Amazon has acquired an 8,000-acre site in Pecos, Texas, where it plans to develop a data center powered by an on-site natural gas plant that could become one of the largest in the US. According to Cleanview reporting, Amazon acquired the GW Ranch site from Pacifico Energy for the planned...

Read more
Read AWS Eyes Data Center Development at 4.5GW Gas Plant in Pennsylvania
Amazon Web Services (AWS) is exploring a potential data center development at a natural gas power plant near Pittsburgh, Pennsylvania. First reported by TribLive, Amazon is considering a data cente...

AWS Eyes Data Center Development at 4.5GW Gas Plant in Pennsylvania

August 07, 2026 Amazon AWS

Amazon Web Services (AWS) is exploring a potential data center development at a natural gas power plant near Pittsburgh, Pennsylvania. First reported by TribLive, Amazon is considering a data center campus next to the planned Homer City Redevelopment gas plant in Indiana County. “As part of our...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?