Latest Podcast Street AddressInterested in this information?Contact us, Co. Dublin, D22 T2P7, Ireland
Operational
Fully operational facility
Operated by:

Amazon: Grange Castle

Short Code: DUB069
Year Built: 2024
Floors: 2

Sites on this Campus:

░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm. The associated structures include water tanks, sprinkler tanks, pump house, and prefabricated containerized electrical rooms located within the center of the site, as well as a temporary substation and utility connections to the boundary of the site.

  • The first two-storey data center (Building A), completed in 2024, is located to the south-west of the site and has a gross floor area of 28,573 sqm. It includes 26 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that are 25m in height. The facility also includes 26 ventilation shafts located above the northern end of each emergency generator, measuring 20m in height.
  • The second two-storey data center (Building B) will be located to the north-west of the site, immediately north of Building A, and will have a gross floor area of 21,725 sqm. It will include 18 emergency generators located at ground floor level within a compound to the northern side of the data center with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts located above the southern end of each emergency generator, measuring 20m in height.
  • The last two-storey data center (Building C) will be constructed last and will be located in the eastern part of the site on a north-south axis, with a gross floor area of 28,573 sqm. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts located above the western end of each emergency generator, measuring 20m in height.

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Global CampusInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of TwoInterested in this information?Contact us

Distance Site About
0.07 miles Edge ValleyInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
0.12 miles CyrusOne : DUB I Bldg 2
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
0.12 miles Prime CampusInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
0.13 miles CyrusOne Dublin I
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
0.19 miles CyrusOne : DUB I Bldg 3
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
0.22 miles Hub MaxInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
0.24 miles Hub PrimeInterested in this information?Contact us
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
0.29 miles PointInterested in this information?Contact us
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
0.31 miles HubInterested in this information?Contact us
0.34 miles AlphaInterested in this information?Contact us
0.39 miles EdgeInterested in this information?Contact us
0.40 miles Vantage: Dublin DUB1
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
0.40 miles Vantage: DUB 12
This facility is part of Vantage's DUB1 Campus in Dublin, Ireland.
0.41 miles Center MaxInterested in this information?Contact us
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
0.41 miles Ridge TwoInterested in this information?Contact us
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
0.44 miles EastInterested in this information?Contact us
0.45 miles South PlazaInterested in this information?Contact us
0.51 miles Vantage: DUB 13
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
0.53 miles Metro RidgeInterested in this information?Contact us
0.57 miles Digital Profile Park Dublin
Digital Realty owns the 10 acre site at Profile Park and will have access to both power and fiber. The company has secured planning approval to construct 193,384 gross sq ft in two phases and over four buildings.
0.57 miles East TowerInterested in this information?Contact us
0.58 miles Digital Realty: DUB14
Digital Realty opened its second data center on the Profile Park campus in Dublin, Ireland in 2019.
0.58 miles Equinix Dublin DB2
Located in Grange Castle business park, DB2 is a former Telecity site that was acquired by Equinix in January 2016.
0.59 miles Digital Realty: DUB15
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
0.61 miles Digital Realty: DUB16
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
0.61 miles EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
0.62 miles Equinix: DB8
Equinix was planning to construct a facility at Profile Park, Nangor Road, Clondalkin in Dublin. The site was originally planned to be powered by the electric grid, but after failing to secure a permanent supply, Equinix adjusted the proposal to use gas power.
0.67 miles PlusInterested in this information?Contact us
0.68 miles Edgeconnex Dublin
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
0.70 miles Metro ParkInterested in this information?Contact us
Commissioned in 2009, the site was Microsoft's first data center outside of the United States.
0.75 miles Edgeconnex: DUB02
0.79 miles EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
0.81 miles Edgeconnex: DUB03
0.88 miles Digital Realty: DUB4
Digital Realty's DUB4 data center is situated in Grand Castle Park, Dublin, next to its DUB3 facility.
0.92 miles Digital Realty: DUB3
Located in the Grange Castle data centre cluster, the DUB3 data center offers 59,202 sqft of space and power densities of up to 2kW per square meter, with 4.6MW available for the entire data center.
0.94 miles CyrusOne Dublin Grange Castle
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
1.07 miles Echelon: DUB 40
Echelon Data Centres’ DUB40 is planned to be located outside of Dublin, in a data center cluster known as Grange Castle.
2.08 miles Equinix Dublin DB1
2.09 miles Equinix: Citywest Dublin
The BT data centre is adjacent to Equinix's DB1 site.
2.37 miles K2: DUB 6
K2 Data Centers completed the purchase of a 4.6-acre site in Citywest Business Park, Dublin, in July 2020 for approximately €3 million.
2.45 miles CampusInterested in this information?Contact us
2.45 miles Keppel DC Dublin1
3.00 miles Echelon: DUB13
Echelon Data Centres has challenged a South Dublin County Council (SDCC) ruling to block the expansion of its DUB10 data center campus in Clondalkin, Dublin, Ireland.
3.07 miles Echelon Clondalkin
Echelon’s DUB10 campus will provide 90MW+ of IT load and includes a grid substation as well as on-site power generation.
3.09 miles Echelon: DUB11
Echelon's DUB11 marks the second building of its Clondalkin campus, following the energization of the first building in Q4 2023.
3.11 miles Echelon: DUB12
Echelon's DUB12 marks the third building of its Clondalkin campus.
3.82 miles Digital Realty: Dublin 1
3.83 miles Digital Realty: Dublin 2
3.86 miles North StationInterested in this information?Contact us
3.93 miles East PlazaInterested in this information?Contact us
4.52 miles Global StationInterested in this information?Contact us
4.54 miles Ridge AlphaInterested in this information?Contact us
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
4.64 miles Hub OneInterested in this information?Contact us
6.77 miles Kyndryl: Dublin
6.88 miles Cloud CampusInterested in this information?Contact us
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
6.93 miles Equinix: DB5x
Equinix's fifth data center in Ireland opened in Q4 2022, located in the former Clyde House in Blanchardstown.
6.93 miles MaxInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
6.93 miles Center ThreeInterested in this information?Contact us
6.94 miles Equinix: DB6x
DB6x is part of a three-building campus(DB5x, DB6x, DB7x) proposed in a 2020 planning application.
6.94 miles Valley PrimeInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
6.95 miles RidgeInterested in this information?Contact us
6.96 miles Equinix: DB7x
Equinix has begun construction of its DB7x data center at its Blanchardstown campus in Profile Park, Grange Castle Business Park, Clondalkin, Dublin, Ireland, with the facility expected to deliver initial capacity by early 2028. Based on cost benchmarks, the project is estimated to provide 9MW of IT load, serving as a retail IBX expansion leveraging existing campus infrastructure.
6.99 miles West PlazaInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.02 miles Ridge TwoInterested in this information?Contact us
7.02 miles Plaza GammaInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
7.03 miles PlazaInterested in this information?Contact us
7.16 miles Keppel Dublin 2
Built in 2013, Keppel acquired the Ballycoolin site – previously owned by Dataplex – in 2017.
7.21 miles K2: DUB 4
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
7.21 miles Servecentric Blanchardstown
7.22 miles RidgeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.25 miles K2: DUB 5
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
7.25 miles Equinix: Ballycoolin
The Ballycoolin data center is a 40,000 sq ft (3,716 sqm) facility on Dublin's north side. It has 7,000 sq ft (650 sqm) of fully allocated data halls.
7.28 miles K2 Dublin 1
7.30 miles TowerInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.35 miles Center PrimeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.36 miles Blanchardstown Dublin - Digital Realty
Digital Realty’s Blanchardstown Data Centre is a Tier Ill designed building, the two-story building is 120,000sqft. The facility also hosts Servecentric Blanchardstown in the building.
7.37 miles CenterInterested in this information?Contact us
7.38 miles Station ProInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.45 miles CenterInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.48 miles CloudInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.49 miles Campus PlusInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.52 miles Pure DC: DUB 01
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.55 miles EngineNode: Meath DC4
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.56 miles Pure DC: DUB 02
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.58 miles EngineNode: Meath DC3
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.59 miles Pure DC: DUB 03
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
7.62 miles EngineNode: Meath DC2
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.63 miles EngineNode Meath
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
7.75 miles Equinix Dublin DB4
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
7.81 miles Equinix Dublin DB3
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
8.44 miles Energia: Huntstown, Dublin
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
8.47 miles Energia: Huntstown 2
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
11.10 miles Central TowerInterested in this information?Contact us
11.18 miles Hyperscale Data CenterInterested in this information?Contact us
11.19 miles Cloud ParkInterested in this information?Contact us
11.19 miles PlazaInterested in this information?Contact us
11.22 miles East TowerInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
11.22 miles Digital Realty: Clonshaugh
Located within easy access of Dublin Airport, via city’s many transport links, Digital Realty’s Clonshaugh data centers (DUB11 and DUB12) provide 10,219m2(110,000f 2) of highly-connected premium customer space.
11.23 miles Edge TowerInterested in this information?Contact us
11.23 miles East ParkInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
11.27 miles Hyperscale Data CenterInterested in this information?Contact us
11.27 miles Valley MaxInterested in this information?Contact us
11.30 miles Hyperscale Data CenterInterested in this information?Contact us
11.35 miles GTT Dublin International Exchange Center
11.39 miles Vodafone Dublin
11.42 miles Verizon Dublin
11.43 miles Metro RidgeInterested in this information?Contact us
11.49 miles TwoInterested in this information?Contact us
12.32 miles Hub TwoInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.37 miles Prime PlazaInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.43 miles East RidgeInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.46 miles PlazaInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.47 miles Tower UltraInterested in this information?Contact us
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
12.56 miles West ParkInterested in this information?Contact us
Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.

Point MaxInterested in this information?Contact us Data Center Photos See all

Amazon submitted plans to build a huge, 20,739 sq metre (223,000 sq feet) data centre in Mulhuddart, close to a huge biologics facility owned by pharma giant Bristol-Myers Squibb.
Rendering of a New Amazon Data Centre in Mulhuddart near Dublin
Source: Fingal County Council

Amazon submitted plans to build a huge, 20,739 sq metre (223,000 sq feet) data centre in Mulhuddart, close to a huge biologics facility owned by pharma giant Bristol-Myers Squibb.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read Amazon Acquires 8,000-Acre Texas Site for Gas-Powered Data Center
Amazon has acquired an 8,000-acre site in Pecos, Texas, where it plans to develop a data center powered by an on-site natural gas plant that could become one of the largest in the US. According to ...

Amazon Acquires 8,000-Acre Texas Site for Gas-Powered Data Center

August 10, 2026 Amazon AWS

Amazon has acquired an 8,000-acre site in Pecos, Texas, where it plans to develop a data center powered by an on-site natural gas plant that could become one of the largest in the US. According to Cleanview reporting, Amazon acquired the GW Ranch site from Pacifico Energy for the planned...

Read more
Read AWS Eyes Data Center Development at 4.5GW Gas Plant in Pennsylvania
Amazon Web Services (AWS) is exploring a potential data center development at a natural gas power plant near Pittsburgh, Pennsylvania. First reported by TribLive, Amazon is considering a data cente...

AWS Eyes Data Center Development at 4.5GW Gas Plant in Pennsylvania

August 07, 2026 Amazon AWS

Amazon Web Services (AWS) is exploring a potential data center development at a natural gas power plant near Pittsburgh, Pennsylvania. First reported by TribLive, Amazon is considering a data center campus next to the planned Homer City Redevelopment gas plant in Indiana County. “As part of our...

Read more
Read AWS Withdraws From Planned Data Center Campus Near Maryland Nuclear Plant
Amazon Web Services (AWS) has dropped plans for a data center campus next to Maryland's Calvert Cliffs Nuclear Power Plant. The proposed project in Lusby, Calvert County, would have included eight ...

AWS Withdraws From Planned Data Center Campus Near Maryland Nuclear Plant

August 05, 2026 Amazon AWS

Amazon Web Services (AWS) has dropped plans for a data center campus next to Maryland's Calvert Cliffs Nuclear Power Plant. The proposed project in Lusby, Calvert County, would have included eight buildings totaling 2.46 million square feet (228,540 sqm) and around 500MW of capacity, powered...

Read more
Read AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn
Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to de...

AWS Plans 800,000 sq ft Data Center Campus at GWU Site in Ashburn

July 31, 2026 Amazon AWS

Details have emerged about Amazon's latest planned data center campus in Northern Virginia. Loudoun County Supervisor Juli E. Briskman (D-Algonkian) said this week that Amazon has filed plans to develop a four-building, 800,000 sq ft (74,320 sqm) data center campus at the former George Washington...

Read more
Read AWS Proposes $1.2 Billion Data Center Campus Outside Housto
Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Ea...

AWS Proposes $1.2 Billion Data Center Campus Outside Housto

July 08, 2026 Amazon AWS

Amazon Web Services (AWS) is planning a new data center campus in Boling, Texas, outside Houston. Filed under Amazon Data Services with the Texas Department of Licensing and Regulation, “Project Eagle” will include four buildings on a roughly 2,700-acre site in Wharton County near FM 1301 and FM...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?