This facility is part of Google's New Albany campus in Ohio.
Google plans to invest 600 million euros ($685.98 million) to build the Fredericia data center in Denmark.
Google's first data center in Germany, in Hanau's Wolfgang technology park east of Frankfurt, home of the Google Cloud Frankfurt region.
Google completed the expansion of its Douglas County data center in 2016.
In 2022, Google purchased a 36-hectare site in the Feluy industrial zone of Ecaussinnes, near La Louvière in the Belgian province of Hainaut.
This facility is part of Google's Project Zodiac located in Fort Wayne, Indiana.
Cancelled Google data centre project on land in Mittenwalde-Schenkendorf, south of Berlin.
This facility is part of Google's Project Zodiac located in Fort Wayne, Indiana.
This data center is a part of Google's Lockbourne Campus in Ohio.
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
In 2023, Google secured a long-term lease agreement for a substantial data center in Navi Mumbai, spanning 381,000 sq ft (35,400 sqm).
This facility is part of Google's Project Zodiac located in Fort Wayne, Indiana.
In 2013, Google paid PepsiCo Inc. $24.5 million for an idled Gatorade plant next to its Mayes County industrial plant. The 1.4 million-square-foot former Gatorade plant is one of the largest industrial buildings in the state.
Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.
Google has been granted permission for a new data center campus in the Hainaut municipality of Farciennes, Belgium. The campus will span some 53,000 sqm (570,500 sq ft).
Google is building a two-building data center campus on North Cole Street in American Township, north of Lima in Allen County, Ohio.
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
In 2023, A company affiliated with Google purchased 143 acres of land in the same South Carolina industrial site where Google operates an existing data center.
In February 2026, the Sand Springs City Council approved the rezoning for "Project Spring," a Google-backed data center campus located just eight miles west of downtown Tulsa.
Google plans to invest more than $400 million in Storey County in 2024 alone.
This facility is part of a new Google data center campus in Armstrong County, West Texas.
Google is expanding its infrastructure in central Finland with the acquisition of approximately 900 hectares in the municipality of Vaala for a potential data center development.
Zodiac 9 is a planned data center building in the third phase of Google's Project Zodiac campus in Fort Wayne, Indiana.
Hyperscale OperatorInterested in this information?Contact us operates Rowan Digital Infrastructure's Hyperscale Data CenterInterested in this information?Contact us campus in Medina County, Texas.
This facility is part of Google's Project Pegasus in LaGrange, Georgia.
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
Google is spending $15 billion on new data centers and other digital infrastructure in the Indian state of Andhra Pradesh.
Epping Forest District Council resolved in December 2025 to grant outline planning permission for Google's data centre campus at North Weald Airfield, subject to a legal agreement.
Google is the registered occupant of CyrusOne's DFW7 data center, under construction on Asphalt Drive in north Fort Worth.
Google's second data center building on its Lancaster, Ohio campus, east of building 1 on Technology Place. Same single-story design, about 291,000 sq ft, built in 2024-2025 with its own pair of AEP 138 kV feeds.
This facility will be a part of Google's Redhawk campus in Mesa, AZ.
Google is evaluating market demand and adjusting its plan to build a new data center in Tainan.
The $1 billion data center development is located at the Port of Little Rock on approximately 383 acres of heavy industrial-zoned land.
In 2026, Google purchased approximately 1,700 acres of land in Putnam County, West Virginia, for a multi-billion-dollar data center campus.
This facility is part of Google's New Albany campus in Ohio.
This facility is part of Google's New Albany campus in Ohio.
This facility is part of Google's New Albany campus in Ohio.
This facility is part of Google's New Albany campus in Ohio.
This facility is part of Google's New Albany campus in Ohio.
Google is set to build a $3 billion data center campus project in Stillwater. The project, planned for 400 acres of state-owned land north of the former Armstrong facility, could include up to six data centers.
As part of a £5 billion two-year commitment to the UK, Google has opened a new data centre in Waltham Cross, Hertfordshire.
Google's Red Oak 1 is the first building on its second Dallas-area campus, on 166 acres at FM 664 and State Highway 342 in Red Oak, Ellis County.
After nearly two decades of strategic waiting, Google is officially advancing its first company-owned data center in Austria, located in Kronstorf (Linz-Land district).
This facility is part of Google's Hermantown data center campus in Minnesota.
This facility is part of Google's South Haskell County Campus in Lueders.
Building 1 of Google's Project Cannoli campus in Van Buren Township, Michigan: a one-story, 313,078 sq ft data center on the Haggerty Road side of the site, cooled by 17 dual-cell cooling towers. Construction is set to start in 2026.
Building 3 of Google's Project Cannoli campus in Van Buren Township, Michigan: a one-story, 87,513 sq ft data center near Hannan Road. The 2026 development agreement prepares its pad now and defers the building to a later phase.
Google is preparing to build its first self-owned data center in France, marking a major milestone for its infrastructure in the country.
The data center uses 100% renewable energy to power its operations. Google has invested heavily in renewable energy projects in Belgium, including wind farms and solar plants, to ensure that the facility is powered by clean energy.
This facility is part of Google's Hermantown data center campus in Minnesota.
This facility is part of Google's Hermantown data center campus in Minnesota.
Google's Project Roman is a planned hyperscale data center campus about 22 miles north of Hereford in Deaf Smith County, Texas, paired with co-located renewable generation.
Google has officially submitted a proposal to Hermantown to construct a massive data center campus.
Google: Meitner 3A is the third of three data center buildings under construction at Google's Meitner Energy Center northeast of Pampa, Texas.
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
Google: Meitner 1A is the first of three data center buildings under construction at Google's Meitner Energy Center northeast of Pampa, Texas.
Google: Meitner 2A is the second of three data center buildings under construction at Google's Meitner Energy Center northeast of Pampa, Texas.
Google's second Project Clydesdale data center is planned to begin construction in early 2027.
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
This facility is part of Google's Berkeley County Campus in South Carolina.
Google has confirmed its plans to construct a data center in Ridgeville, South Carolina. The company aims to invest $510 million in a 231-acre site along Research Center Drive and Highway 17A in Dorchester County’s Pine Hill Business Campus.
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
Google acquired a 312-acre plot of land in Botetourt County, Virginia, for $14 million. The land, located at the Greenfield industrial park, is intended for the development of a new data center.
Google: Meitner Expansion covers the future phases planned beyond the first three buildings at Google's Meitner Energy Center northeast of Pampa, Texas.
In February 2018 Google broke ground on their $600 million datacenter in Montgomery County, Tennessee. It is located at the former Hemlock Semiconductor plant at 100 Solar Way.
North Carolina Data Center Corridor
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
Google-linked Homebound Group has filed plans for a second data center building at its Haskell campus.
This facility is part of Google's Project Maize in Indiana.
This facility is part of Google's Berkeley County Campus in South Carolina.
Google's first data center in Thailand will be situated in a WHA industrial estate within the Eastern Economic Corridor of Chonburi.
Google is building a 1.4-million-square-foot data center campus in Haskell County.
This facility is part of Google's South Haskell County Campus in Lueders.
Groot LLC has proposed "Project Pyramid," a five-building data center campus in West Memphis, Arkansas. Local media speculates that Google may be involved.
Google is exploring plans to build up to six data centers near the Duane Arnold Energy Center (DAEC) in Linn County, Iowa.
Google is building a new cable landing station on the UH West Oʻahu campus in Hawaii. The 34,585 sq ft (3,215 sqm) facility is set to host six generators and three air-cooled chillers.
Google is building a new cable landing station in Lagoa, on São Miguel island in the Azores, to house its Nuvem and Sol submarine cables.
Google is planning a second data center campus in Wilbarger County, Texas, on about 267 acres of the former Oklaunion Power Station site near Vernon.
The southern of two data halls at Google's Project Dazzler campus along Gallia Pike in Franklin Furnace, Scioto County, Ohio. It is the first of the two to be built, with completion planned for March 2029.
Land west of Gallia Pike that Google has set aside for two more data center buildings at its Project Dazzler campus in Franklin Furnace, Scioto County, Ohio. Google has not announced construction dates.
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
The second of four planned data halls at Google's Project Tembo campus in the Switchgrass Industrial Park south of Cheyenne, Wyoming.
This facility is part of Google's South Haskell County Campus in Lueders.
This facility is part of Google's South Haskell County Campus in Lueders.
This facility is part of a new Google data center campus in Armstrong County, West Texas.
The third of four planned data halls at Google's Project Tembo campus in the Switchgrass Industrial Park south of Cheyenne, Wyoming.
This facility is part of a new Google data center campus in Armstrong County, West Texas.
Planned expansion of Google's Lockbourne data center campus in south Columbus, Ohio, on the undeveloped part of the campus parcel.
This facility is part of a new Google data center campus in Armstrong County, West Texas.
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
This data center is a part of Google's Omaha Campus.
Hyperscale OperatorInterested in this information?Contact us is the listed occupant of the CyrusOne DFW11 data center on CyrusOne's Bosque County campus beside Calpine's Thad Hill Energy Center, Texas.
Google is pausing its $200 million data center project in Chile to address environmental concerns and revise its design.
This facility is part of a new Google data center campus in Armstrong County, West Texas.
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
This facility is part of Google's Berkeley County Campus in South Carolina.
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
This facility is part of Google's Berkeley County Campus in South Carolina.
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
Project Kestrel, a major new data center development, is officially taking flight in Kansas City, Missouri, following the acquisition of 430 acres of land near the Kansas City International Airport by Google affiliate Shenandoah Computing LLC.
This facility is part of Google's Berkeley County Campus in South Carolina.
The facility sits half an hour north of Charleston and since it first opened, Google has pumped $1.8 billion into the decade-old site, which is in Moncks Corner.
Google planned Midlothian 4 as a single-story data center at the south end of its Midlothian campus, then dropped it from the site plan in 2026.
The last of four planned data halls at Google's Project Tembo campus in the Switchgrass Industrial Park south of Cheyenne, Wyoming. Google targets campus completion in the first half of 2031.
Google's first Minnesota data center is a proposed multi-billion-dollar hyperscale facility anchoring Ryan Companies' 482-acre Project Skyway technology park in Pine Island.
This facility will be part of Google's Cedar Rapids campus in Iowa.
This facility will be part of Google's Cedar Rapids campus in Iowa.
This facility will be part of Google's Cedar Rapids campus in Iowa.
This data center is a part of Google's Omaha Campus.
This facility will be part of Google's Cedar Rapids campus in Iowa.
This facility is part of Google's "Project Spring" near downtown Tulsa.
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
This facility is part of Google's Project Zodiac located in Fort Wayne, Indiana.
Google is spending $15 billion on new data centers and other digital infrastructure in the Indian state of Andhra Pradesh.
Google is spending $15 billion on new data centers and other digital infrastructure in the Indian state of Andhra Pradesh.
This facility is part of Google's Project Zodiac located in Fort Wayne, Indiana.
Building 2 of Google's Project Cannoli campus in Van Buren Township, Michigan: a two-story data center with about 952,000 sq ft of floor area on a 509,741 sq ft footprint, at the center of the site. Construction is set to start in 2026.
Building 4 is a planned data center building on Google's campus near Monrovia in Morgan County, Indiana.
Google’s ambitious billion-dollar data center expansion in Finland is currently stalled as the tech giant awaits clarity on a proposed 40-fold increase in electricity taxes.
Google's Midlothian 5 is a one-story data center under construction since January 2026 on the central pad of its Midlothian campus in Ellis County.
The Google White Oak Technology Park (also designated as the Columbia County Data Center) is an 8.07 million-square-foot hyperscale campus situated on 1,900 acres in Appling, Columbia County, Georgia.
Project Loch is designed to feature three massive data center buildings, each supported by its own dedicated on-site power substation to handle high-density cloud and AI workloads.
This facility is part of Google's Project Loch in Richmond, Virginia.
Google's Midlothian 6 is a planned one-story data center near Railport Parkway on its Midlothian campus in Ellis County, added in a 2026 site-plan revision.
This facility is part of Google's Project Loch in Richmond, Virginia.
This data center is a part of Google's Omaha Campus.
In May 2025, the Chesterfield Board of Supervisors approved the rezoning of nearly 979 acres at the planned Upper Magnolia Green West technology village.
Google is planning to develop a $576 million data center campus along 76th Avenue SW and Edgewood Road SW in the Big Cedar Industrial Center. The site will spread out over an area of 1,396 acres.
This facility is part of Google's Project Peanut in Chesterfield County, Virginia.
Project Peanut is Google’s first active, multi-phase data center campus development in eastern Chesterfield County, located on a 300-plus acre site adjacent to the Meadowville Technology Park.
This facility is part of Google's Project Peanut in Chesterfield County, Virginia.
Building 1 is the first data center on Google's Southlands campus in Council Bluffs, Iowa. The single-story building has three sections totaling about 848,000 square feet, with diesel generator yards along its north side.
Google is planning a data center campus on about 2,500 acres off Three Way Road in Archer County, Texas, south of Wichita Falls.
Proposed in June 2026 by MidAmerican Energy, the Salix Data Center project is a planned 900-acre campus in Salix, Iowa.
North Carolina Data Center Corridor
Hyperscale OperatorInterested in this information?Contact us is expanding its data center footprint outside Charlotte, North Carolina. Hyperscale OperatorInterested in this information?Contact us’s proposed expansion is on about 38.26 acres in Lenoir, adjacent to its data center campus at 708 Lynhaven Drive.
North Carolina Data Center Corridor
Hyperscale OperatorInterested in this information?Contact us is planning to expand its data center footprint outside Charlotte, North Carolina. Hyperscale OperatorInterested in this information?Contact us’s proposed expansion is on about 21.63 acres in Lenoir, adjacent to its data center campus in Lenoir.
North Carolina Data Center Corridor
Google's first data center building on its Lancaster, Ohio campus: a single-story hall of about 289,000 sq ft on Technology Place, off Whiley Road. Site work began in late 2021 and the building was completed in 2024.
North Carolina Data Center Corridor
Hyperscale OperatorInterested in this information?Contact us first announced plans to develop a data center in Caldwell County back in 2007. At the time, it said it would invest $1.2 billion in the 337,000 square foot (31,310 sqm) facility over two phases, which was expanded around 2013.
Land Google bought beside its Lancaster, Ohio campus in 2025 and 2026 for future buildings. Google has not announced or filed a building here yet.
Google’s ambitious billion-dollar data center expansion in Finland is currently stalled as the tech giant awaits clarity on a proposed 40-fold increase in electricity taxes.
Google has filed plans for "Project Raspberry" a data center development located on 343.6 acres within the Greenfield Industrial Campus in Botetourt County, Virginia.
This facility is part of "Project Raspberry" in Botetourt County, Virginia.
This facility is part of "Project Raspberry" in Botetourt County, Virginia.
Hyperscale OperatorInterested in this information?Contact us is the listed occupant of the CyrusOne DFW10 data center on CyrusOne's Bosque County campus beside Calpine's Thad Hill Energy Center, Texas.
Google is building a $500 million digital exchange hub of more than 7,000 square meters at Cabeza de Toro in Punta Cana, Dominican Republic.
Google's Taylor Lake data center at 4400 River Trail Way in The Dalles, Oregon, on 23 acres Google bought from the Port of The Dalles in 2015. Google dedicated it in March 2018.
The first data center at Google's new Tulsa County campus is under construction and scheduled to open in 2027.
Google is expanding its presence in Texas with a new data center in Wilbarger County, which is located in the North Texas region with Vernon as the county seat.
A third data center is planned as part of Google's four-phase Project Clydesdale development in Tulsa County.
The fourth planned data center would complete the currently envisioned four-phase Google campus in Tulsa County.
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019.
Google's hyperscale data center on the site of the retired Widows Creek coal plant in Jackson County, Alabama. Operating since 2019 on an original $600M build, the campus is undergoing a $1.5B expansion across 2026 to 2027 that pushes Google's total investment in the site past $2 billion.
Phase II is expected to see Google build 280,000 square feet more.
Building 2 is one of the first two data center buildings on Google's campus near Monrovia in Morgan County, Indiana.
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
Google is the registered operator of Building 1 at Skybox Datacenters' PowerCampus Dallas in Lancaster, south of Dallas.
Google has withdrawn its proposal to build a 468-acre data center in Franklin Township, Indiana.
The multi-billion dollar Google data center campus in Fort Wayne, known as Project Zodiac, is an expansive economic development project currently under construction and partially operational as of late 2025.
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
Future phases of Homebound Group's Google-linked Journey campus in Haskell County, beyond Journey 1A and 2A.
This facility is a part of Google's Dalles Campus in Oregon.
In 2017, Google acquired a 131-hectare (324-acre) plot of land in Aabenraa, adjacent to the site of Apple's defunct data center project.
This facility is part of Google's Berkeley County Campus in South Carolina.
Building 7 is a data center under construction on Google's Southlands campus in Council Bluffs, Iowa. Iowa DNR issued its generator permits in March 2026.
One of Google's two original 2006 buildings at 4200 Columbia Road in The Dalles. Google stripped the hall in 2025 and razed it in 2026; the city approved a 77,000 sq ft replacement on the same footprint in August 2026.
Google invested an additional $600 million to complete the phase development at its data center campus in The Dalles, Oregon, in 2015.
Building 6 is the south-east single-story hall on Google's Southlands campus in Council Bluffs, Iowa, completed in 2026.
Google owns about 1,273 acres along Rumble Road near Interstate 75 in Monroe County, between Atlanta and Macon, and plans three two-story data centers of about 600,000 sq ft each.
Google's first Malaysian data center, at Elmina Business Park outside Kuala Lumpur.
This data center is part of Google's Lincoln campus in Nebraska.
This data center is part of Google's Lincoln campus in Nebraska.
This facility is part of Google's Berkeley County Campus in South Carolina.
Google Cloud's Turin region runs one of its zones in Noovle's data center in Moncalieri, south of Turin.
Google Cloud's Turin region runs one of its zones in Noovle's data center in Rivoli, west of Turin.
Google Cloud's Milan region runs one of its zones in Noovle's data center in Cassina de' Pecchi, east of Milan.
Google Cloud's Milan region runs one of its zones in Noovle's data center in Santo Stefano Ticino, west of Milan.
Google Cloud's Turin region runs in three Noovle data centers around Turin; this site is its zone in Noovle's Cebrosa building in Settimo Torinese.
The first of two Google data centers at 3500 River Road in The Dalles, Oregon, on the 74-acre former aluminum smelter site. The 288,530 sq ft building became operational in December 2024.
This data center is a part of Google's Papillion Campus in Nebraska.
Building 4 is the first of the single-story east halls on Google's Southlands campus in Council Bluffs, Iowa, built in 2023 and 2024.
Building 3 is the four-story data center on Google's Southlands campus in Council Bluffs, Iowa, announced in 2015 as a $1 billion investment and built in three sections.
The first phase of the campus, located at the Mid-America Industrial Park in Mayes County, was a 130,000 sq ft (12,000 sq m) facility worth $600m, which came online in 2011; four years after Google bought the property.
In late 2023, Google officially began construction on its third Dutch data center in Winschoten, Groningen.
Google's Omaha data center campus on Blair High Road encompasses approximately four data center buildings, totaling about 1,432,280 gross square feet in floor area.
Building 8 is a planned data center on Google's Southlands campus in Council Bluffs, Iowa. Iowa DNR issued its generator permits in June 2026.
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
Google is exploring a large data center campus at Gylderåsen in Våler, Østfold, south of Oslo.
In 2018, Google spent $600m to add a four-story facility to the campus.
This data center is a part of Google's Mayes County campus in Oklahoma.
This data center is a part of Google's Mayes County campus in Oklahoma.
This data center is a part of Google's Papillion Campus in Nebraska.
Building 2 on Google's Southlands campus in Council Bluffs, Iowa: seven connected two-story halls built in 2013 to 2015.
Building 5 is the second of the single-story east halls on Google's Southlands campus in Council Bluffs, Iowa, built in 2024 and 2025.
This data center is a part of Google's Kansas City Campus in Missouri.
Alphabet, Google's parent company, is expanding its US footprint with plans to establish two new data center campuses in Dorchester County. The project represents a $2 billion investment and is expected to create 200 new operational jobs.
Google-linked Homebound Group has filed plans for the first disclosed data center building at its Haskell campus.
Google's first Norwegian data center campus, at Gromstul in Skien, Telemark, where the first building started operating in 2026.
In 2019, Google announced further $600 million expansion, bringing its total investment in Oklahoma to over $3 billion.
This facility will be part of Google's Stillwater Data Center Campus in Oklahoma.
This facility will be part of Google's Stillwater Data Center Campus in Oklahoma.
This facility will be part of Google's Stillwater Data Center Campus in Oklahoma.
This facility will be part of Google's Stillwater Data Center Campus in Oklahoma.
This facility will be part of Google's Stillwater Data Center Campus in Oklahoma.
This facility is part of Google's Berkeley County Campus in South Carolina.
The tech giant’s newest date center project in Lincoln is under construction on roughly 580 acres in Nebraska.
The second of two Google data centers at 3500 River Road in The Dalles, Oregon, on the former aluminum smelter site. The city approved the 290,000 sq ft building in January 2024.
The Armstrong County AI Data Center project, spearheaded by Crusoe Energy, has been redesigned from its original plan.
Google occupies Building 3 at Skybox Datacenters' PowerCampus Austin in Hutto, northeast of Austin, Texas.
This data center is a part of Google's Kansas City Campus in Missouri.
Google occupies Building 1 at Skybox Datacenters' PowerCampus Austin in Hutto, northeast of Austin, Texas.
This data center is a part of Google's Mayes County campus in Oklahoma.
Google owns about 62 hectares (154 acres) of vacant land on boulevard de Melocheville in Beauharnois, beside the Beauharnois generating station, for a planned data centre. Google announced the US$600 million project in 2021, but the site is undeveloped and its power supply is not yet approved. Google's Montreal cloud region runs in three third-party colocation facilities.
Google's Red Oak 2 is the second data center building on its Red Oak campus in Ellis County, under construction next to Red Oak 1.
This data center is part of Google's Lockbourne Campus in Ohio.
This data center is a part of Google's Mayes County campus in Oklahoma.
Google's first Texas data center, building 1 of five on its Midlothian campus in Ellis County, a two-story building completed in 2020.
Google's Midlothian 3 is building 3 of five on its Midlothian campus, a long single-story data center with two modular electrical buildings and its own substation.
Quest is a Google-linked Homebound Group data center site on about 336 acres north of Loop Road in Haskell County, Texas, near Google's Thelma campus.
Ranger is a Google data center site on about 1,314 acres along FM 600 in Haskell County, Texas, west of Google's Thelma campus.
This data center is a part of Google's Kansas City Campus in Missouri.
This facility is part of Google's Berkeley County Campus in South Carolina.
Google is exploring the possibility of establishing a hyperscale data center near Ho Chi Minh City, Vietnam, with potential operation targeted for 2027. These plans are currently under internal discussion.
Google's Midlothian 2 is building 2 of five on its Midlothian campus in Ellis County, a two-story twin of the first building completed in 2020.
This data center is a part of Google's Lockbourne Campus in Ohio.
This data center is part of Google's Lockbourne Campus in Ohio.
Hyperscale OperatorInterested in this information?Contact us Cloud's Stockholm region (europe-north2), run from undisclosed colocation data centers in the Stockholm area.
Google's Midlothian 7 is land Google holds for a future seventh building on its Midlothian campus in Ellis County.
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
Hyperscale OperatorInterested in this information?Contact us broke ground on its fourth Dutch data center campus in Westpoort, Netherlands in April 2024.
Building 3 is a planned data center building on Google's campus near Monrovia in Morgan County, Indiana.
Zodiac 7 is a planned data center building in the third phase of Google's Project Zodiac campus in Fort Wayne, Indiana.
Zodiac 8 is a planned data center building in the third phase of Google's Project Zodiac campus in Fort Wayne, Indiana.
Building 5 is a planned data center building on Google's campus near Monrovia in Morgan County, Indiana.
Building 6 is a planned data center building on Google's campus near Monrovia in Morgan County, Indiana.
Google is converting the former ANCO windshield-wiper plant on Royal Road in Michigan City, Indiana, into a data center.
Google is building a data center campus near Monrovia in Morgan County, Indiana, with up to six data center buildings.
Google is building a cable landing station in the Cantabria science and technology park in Santander for its Sol transatlantic subsea cable.
The first of two data halls at Google's Project Spade campus in New Florence, Montgomery County, Missouri. Google plans to bring it online in 2028.
The northern of two data halls at Google's Project Dazzler campus along Gallia Pike in Franklin Furnace, Scioto County, Ohio. Google plans to finish it in June 2029.
The second of two data halls at Google's Project Spade campus in New Florence, Montgomery County, Missouri. Google targets completion of the campus in 2029.
The first of four planned data halls at Google's Project Tembo campus in the Switchgrass Industrial Park south of Cheyenne, Wyoming. Google targets initial operations in the second half of 2028.
Google occupies Building 2 at Skybox Datacenters' PowerCampus Austin in Hutto, northeast of Austin, Texas.
Google's first self-built data center in Sweden, in Horndal, Avesta kommun, with completion targeted for 2028.
Google's proposed data center campus at Torsboda Industrial Park in Timrå kommun, north of Sundsvall, to be built in stages.
Google has proposed the Thurrock Data Centre, up to four data center buildings on the former Arena Essex raceway site off Arterial Road in West Thurrock, Essex. The outline application was submitted to Thurrock Council in 2025 and is awaiting a decision.
Google's planned Dietzenbach data center south of Frankfurt, the focus of its EUR 5.5 billion German investment program.
Hyperscale OperatorInterested in this information?Contact us's data center plot on a former concrete plant in Babenhausen, southeast of Frankfurt.
Google's planned five-building data center campus in the Fliegerhorst business park at Erlensee, east of Hanau.
Hyperscale OperatorInterested in this information?Contact us is building a data center campus in the UMW High Value Manufacturing Park at Serendah, Selangor.
Hyperscale OperatorInterested in this information?Contact us is building two data center blocks on leased land at Eco Business Park V, Puncak Alam.
Hyperscale OperatorInterested in this information?Contact us owns land at Eco Business Park V, Puncak Alam, next to the data centers it is building there.
Hyperscale OperatorInterested in this information?Contact us is building a second data center site at Elmina Business Park, which it will lease from Sime Darby Property.
November 23, 2026 Google
Lea County commissioners approved $130 billion in industrial revenue bonds for Project Rancho, a Google data center planned west of Hobbs, New Mexico. The 4-1 vote came at a Nov. 19 meeting in Lovington, where the board also rejected a proposed six-month moratorium on data center development, the...
Read more
November 23, 2026 Northern Virginia
Blue Owl Digital Infrastructure Trust closed the purchase of a 54MW data center in Gainesville, Virginia, for $779.5 million, an SEC filing shows. The trust's subsidiary NVA11C LLC bought the membership interests in GCDC Purchaser Phase 3 LLC, which holds title to the building, from US GCDC...
Read more
November 23, 2026 Spain
Spain's Council of Ministers approved a royal decree on Nov. 20 that ties large data centers' grid access to renewable energy use. Royal Decree 1032/2026 was published in the Official State Gazette on Nov. 21 and entered into force on Nov. 22. The approval follows Baxtel's October...
Read more
November 23, 2026 Zurich
Green Datacenter AG now sends waste heat from its Dielsdorf data centers into a district heating network that will eventually serve up to 11,500 households. The Swiss operator and utility Energie 360° commissioned the network's energy center on Nov. 19, and the first apartment buildings in...
Read more
November 22, 2026 Omaha
Cogent Communications agreed to sell three data centers to Saragon Infrastructure for $35 million in cash, Cogent's announcement said. Saragon is a portfolio company of I Squared Capital, and the facilities are in Omaha, Nebraska; Tacoma, Washington; and Cheyenne, Wyoming. Cogent expects the...
Read more
November 20, 2026 Virginia: Rural
Microsoft has applied to the US Army Corps of Engineers for a five-building data center campus on 316.7 acres in Mecklenburg County, Virginia. Microsoft filed the application, labeled LVL-16, with the corps' Norfolk District under Section 404 of the Clean Water Act. The Norfolk District is...
Read more
Jan 05, 2026 Eric Bell Dallas