RidgeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Beauharnois, QC, Canada
Operational
Fully operational facility
Operated by:

Google Beauharnois

Utility Provider: Hydro-Quebec
░░░░ Request Dataset MW
Total Power

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of ThreeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us OVH Beauharnois Quebec BHS
OVH data center was created on the former Rio Tinto Alcan aluminum plant that is adjacent to Hydro-Quebec's Beauharnois Power Plant.
NN milesInterested in this information?Contact us Vantage Montreal III (QC6)
Vantage’s Montreal III (QC6) campus is located close to Dorval’s Montréal-Trudeau International Airport. Montreal III is situated on an 8-acre site, which totals one data center with 140k sqft of space.
NN milesInterested in this information?Contact us Compass Montreal II
Compass's Montreal II currently supports 30MW of power, but when fully built, the site will host 50MW of total capacity and will be one of Canada’s largest wholesale data centers.
NN milesInterested in this information?Contact us Equinix: MT2
NN milesInterested in this information?Contact us Ericsson Vaudreuil
The 215,000 square foot data center was completed in December 2016. The facility has been built with N+1 redundancy across critical systems.
NN milesInterested in this information?Contact us eStruxture MTL-4 Kirkland
The site, formerly known as Cogeco Peer 1 Kirkland, was built to Tier 3 standards, the 100,000 square foot, secure facility is designed to Uptime Institute Standards and equipped with primary and secondary power redundancy.
NN milesInterested in this information?Contact us Hypertec YUL02
NN milesInterested in this information?Contact us Vantage: QC4C
QC4C data center building is the third facility of Vantage's Montreal II campus. The building spans 94,000 gross square feet of space and came online in 2022.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?