Google: Waltham Cross

Street Address
Interested in this information? Contact us

Operated by:

Google has started building a new data centre in Waltham Cross, Hertfordshire. The data centre will be located on a 33-acre site that Google purchased in October 2020. The new data centre represents an investment of $1 billion dollars in the country.

  • The data center will be the first to be operated by Google in the UK.
  • The data centre will be built on land at Maxwell's Farm, next to the A10 Great Cambridge Road and around one mile from the M25's junction 25.
  • Google’s 2022 deal with ENGIE adds 100MW wind energy.
  • The aim is for 90% carbon-free UK operations by 2025.

Map and Nearby Locations:

This Facility
Click Map to begin Search

Sites within 15 miles of Google: Waltham Cross

Show SqM
Distance Site About
3.15 miles VIRTUS London1 Enfield
3.37 miles Coreix Enfield
5.37 miles Ark: Meridian Park
8.90 miles Google: North Weald Airfield
Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase.
8.98 miles Kao Data: Harlow
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
9.02 miles Kao Data: Harlow 2
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
9.08 miles Kao Data: Harlow 3
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
9.11 miles Kao Data: Harlow 4
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
9.22 miles INAP North London
INAP's North London data center is located within Colt's facility on Black Fan Road
9.22 miles Colt London North: Welwyn Garden City
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
10.41 miles Infinity SDC HereEast
11.76 miles Verizon London UK5
11.82 miles Level3 London (Goswell)
11.90 miles Green Mountain: London East
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
11.93 miles LDeX London LDeX1
11.96 miles Infinity Romford North and South
12.01 miles Green Mountain: London East Bldg 2
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
12.03 miles Epsilon London Telephone House
12.06 miles Colt House London
12.09 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
12.16 miles Redcentric London
12.17 miles iomart DC2 London
12.19 miles Internap London
12.21 miles Telehouse London Metro
12.23 miles Interxion London 2
12.27 miles Volta EC1
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
12.29 miles Interxion LON1 LON3
12.64 miles Kao Data: Bidder Street, Newham
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
12.73 miles Level3 London (Braham)
12.84 miles Level3 London (10 Fleet)
12.90 miles Level3 London (120 Leman)
12.97 miles Verizon London THW
12.97 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
12.98 miles Level3 London (E India Dock)
12.99 miles GTT London GS2
13.00 miles Global Switch London Docklands Campus
13.02 miles Global Switch: London South
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
13.06 miles Colt London I
13.27 miles Telehouse South
Telehouse is expanding its Telehouse South facility in London, UK.
13.28 miles aptum London
13.35 miles Coreix Docklands
13.40 miles GTT London Citi
13.53 miles Zenium London One
13.55 miles Netwise London East (NLE)
13.62 miles Visa United Kingdom
13.67 miles Digital Meridian Gate (215 Marsh)
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
13.70 miles AIMES DC3 Mastmaker Road
13.74 miles Digital Sovereign House (227 Marsh Wall)
13.84 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
13.85 miles Netwise London Central
13.90 miles DRT London (Bonnington House)
13.94 miles Digital Docklands: Cloud House
14.02 miles NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
14.02 miles Echelon LCY10
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
14.05 miles Cyxtera London LO3 & LO4
14.05 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
14.06 miles City Reach London Docklands
14.54 miles Options West London
14.58 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
14.68 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
14.79 miles Microsoft: Park Royal
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
14.79 miles Vantage London I Campus
14.94 miles Vantage London II
15.17 miles Equinix London LD3
15.46 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
16.77 miles DRT London (Chess Building)
16.82 miles OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
17.02 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
17.06 miles Redwire
17.23 miles Barclays Data Centre
17.29 miles NTT Hempstead 1
17.32 miles NTT Hempstead 3
17.60 miles NTT Hempstead 2
19.80 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
19.81 miles Thrive Luton
19.82 miles Google: Purfleet
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.

Google: Waltham Cross Data Center Photos


Illustration of Google’s new UK data Centre in Waltham Cross, Hertfordshire.
Source: Google

Operating Company

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

65 Facilities Owned
41 Markets Served
2411.8 Megawatts
View Company

News

Read More News