Valley TwoInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Lockbourne, OH 43137
Operational
Fully operational facility
Operated by:

Google: Lockbourne 3

Site: MaxInterested in this information?Contact us
Short Code: Building 3
Year Built: 2025
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

This data center is a part of Google's Lockbourne Campus in Ohio.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Tower PlusInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of OneInterested in this information?Contact us

Distance Site About
0.20 miles BetaInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
0.25 miles Plaza OneInterested in this information?Contact us
This data center is a part of Google's Lockbourne Campus in Ohio.
0.41 miles West PointInterested in this information?Contact us
This data center is part of Google's Lockbourne Campus in Ohio.
0.47 miles GammaInterested in this information?Contact us
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
2.42 miles DataCanopy: Columbus
4.05 miles EdgeInterested in this information?Contact us
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
6.53 miles Carrier-Neutral Data CenterInterested in this information?Contact us
6.65 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
7.03 miles MicroLink: Mansfield Campus
MicroLink is planning to build a data center in Columbus, Ohio.
7.40 miles EdgeConneX: Ashville, Ohio
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
7.78 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
8.03 miles Carrier-Neutral Data CenterInterested in this information?Contact us
8.08 miles CENTRA: 180 East Broad (CMH01)
8.08 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
8.10 miles EdgeConneX: Ashville 2
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
8.34 miles Racksquared 325 E Spring St
8.39 miles Lumen: 226 North Fifth
8.39 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
8.42 miles Cogent: 240 North 5th
8.42 miles CityNet Columbus
8.44 miles Lumen: 266 North 5th
8.88 miles Lumen: 580 North 4th
9.84 miles Kyndryl: Columbus
10.28 miles Resilience CMH II
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
12.84 miles CeraNet Columbus
12.90 miles Karis: Galloway, Ohio
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
13.42 miles Center AlphaInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
13.53 miles PrimeInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
13.62 miles West RidgeInterested in this information?Contact us
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
13.75 miles Hub PrimeInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
13.77 miles North CampusInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
13.86 miles ThreeInterested in this information?Contact us
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
14.01 miles Racksquared 2560 Value Way
15.21 miles Expedient Upper Arlington
15.80 miles Connect Data Centers: Hilliard, OH
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
16.30 miles South ValleyInterested in this information?Contact us
16.36 miles Edge ValleyInterested in this information?Contact us
16.43 miles Station PlusInterested in this information?Contact us
16.44 miles North StationInterested in this information?Contact us
16.49 miles Global CampusInterested in this information?Contact us
16.68 miles eNET Columbus
16.77 miles Park ThreeInterested in this information?Contact us
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
16.84 miles Campus TwoInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
16.90 miles EastInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
16.97 miles SouthInterested in this information?Contact us
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
17.50 miles Aligned: Pataskala
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
17.57 miles Hub MaxInterested in this information?Contact us
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
17.93 miles Ridge MaxInterested in this information?Contact us
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
18.45 miles Ridge ProInterested in this information?Contact us
In 2021 Google bought a farm at 104 Whiley Road, west of U.S. 33 and the first site was completed in 2024.
18.61 miles DartPoints: Dublin, OH
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
18.61 miles Expedient Dublin (CMH2)
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
18.62 miles Cologix COL3
18.68 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
18.76 miles Metro RidgeInterested in this information?Contact us
This facility is part of Google's Lancaster campus in Ohio.
18.79 miles Metro CenterInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
18.80 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
18.88 miles WestInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
18.97 miles HubInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
18.97 miles Prime CampusInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
19.17 miles Center OneInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
19.20 miles QTS: New Albany 2 DC2
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
19.29 miles South TowerInterested in this information?Contact us
This facility is part of Google's New Albany campus in Ohio.
19.37 miles Edge RidgeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
19.38 miles Central CampusInterested in this information?Contact us
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
19.38 miles QTS: New Albany 2 DC1
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC1 is located at 785 Beech Rd SW, Pataskala, OH.
19.39 miles WeConnect Westerville
19.41 miles PlusInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
19.44 miles GlobalInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
19.47 miles Valley ThreeInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
19.49 miles MaxInterested in this information?Contact us
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
19.71 miles QTS: New Albany 1 DC2
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
19.76 miles Hub AlphaInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
19.79 miles QTS: New Albany 1 DC1
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
19.82 miles Metro RidgeInterested in this information?Contact us
This data center is a part of Meta's New Albany Campus in Ohio.
19.89 miles QTS: Babbitt Rd, New Albany
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.

Cloud StationInterested in this information?Contact us Data Center Photos See all

Google's data center construction is progressing rapidly on the site of the former Hartman Stock Farm
Source: Doral Chenoweth/The Columbus Dispatch

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

235
Facilities
74
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News