Telemark, Norway
Telemark hosts Google's first Norwegian data centre campus, at Skien, and a cluster of AI sites on hydropower and former industrial land. Polar DC leases its buildings to Crusoe and CoreWeave, and EdgeConneX is building in Fyresdal. Grid capacity and generator permits set the pace. Read More

Market Facts

Telemark Data Center Map

Telemark Power Growth Over Time

+852% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Telemark

Google
Site
Power
Operational
1
120.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Polar DC
Site
Power
Operational
1
12.0
Construction
2
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Crusoe
Site
Power
Operational
1
12.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
EdgeConneX
Site
Power
Operational
0
0.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Telemark

Location About Total SqFt Power (MW)
Tower GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
Polar DC: DRA01
Polar DC's DRA01 is a data center at Tørdal in Drangedal, Telemark, leased in full to Crusoe for ...
NN Request Dataset
Crusoe: Tordal
Crusoe leases the DRA01 data center from Polar DC at Tørdal in Drangedal, Telemark, for its Cruso...
NN Request Dataset
Green Mountain RJU1-Rjukan
TEL-Rjukan is Green Mountain's data center at Rjukan in Tinn, Telemark, on a brownfield site in a...
NN Request Dataset
Fossefall: Fyresdal Molandsmoen 7B
Fyresdal Datacenter, Norsk Data's original crypto-hosting hall in an industrial building at Molan...
NN Request Dataset

About Telemark

Overview

Telemark, in southern Norway, grew around hydropower and heavy industry. Its data centre market centres on Grenland, the urban area around Skien and Porsgrunn, and on inland valleys with spare power. Google, GPU clouds and AI developers lead the new projects.

History

Green Mountain opened a data centre at Rjukan in 2014, in a valley of hydropower plants. Bitcoin miners followed, and Northern Data halted its Notodden mine in May 2022. Google bought about 200 hectares at Gromstul in Skien in 2019 and broke ground in 2024. Polar DC signed Crusoe for its Tørdal campus in June 2025, and its first building there went live in early 2026. Fossefall bought Norsk Data's crypto hall in Fyresdal in 2025.

The Market Today

Google's Skien campus started its first building in October 2026, and Skien has granted the frame permit for a second. Nscale and landowner Løvenskiold-Fossum plan AI data centres next to it and at Bolvik, beside Statnett's Grenland station. In Porsgrunn, Polar DC is converting the former REC Wafer building in Herøya Industrial Park for CoreWeave. BW Velora plans a campus at Frier Vest in Bamble.

Inland, Crusoe leases Polar's first Tørdal building in Drangedal, and a second is due in late 2027. EdgeConneX is building six data centre buildings at Molandsmoen in Fyresdal. Fossefall runs its crypto hall there and is building its first AI factory beside it. Green Mountain runs its Rjukan site, and Skygard and Tinfos are studying a site at Svelgfoss near Notodden.

Advantages

  • Hydropower. Telemark's valleys hold many hydropower plants, and Statnett's Rød and Grenland stations serve Grenland.
  • Industrial land. Herøya and Frier Vest offer brownfield plots with grid connections.
  • Cool climate. Free cooling covers most of the year.

Challenges

  • Grid access. Power at Herøya stays capped until more Statnett capacity arrives in late 2027. Statnett's November 2026 pause on new reservations slows other projects.
  • Generator permits. Large campuses need emission permits for their backup generators. Google's second Skien building and EdgeConneX's Fyresdal campus both wait on one.
  • Power prices. Telemark lies in NO2, where prices follow continental Europe more closely than in the north.

Trends

  • AI tenants lease whole buildings. Crusoe and CoreWeave lease Polar DC's buildings at Tørdal and Herøya.
  • Crypto halls convert. Fossefall is adding AI capacity beside the Fyresdal crypto hall it bought.

Power and Policy

Statnett runs the transmission grid. Lede distributes power in Grenland, Herøya Nett runs the grid inside Herøya Industrial Park, and Tnett serves Fyresdal. Telemark lies in the NO2 bidding zone.

Get Quotes

Related News See all

Read Crusoe Files For $4.8B Data Center Campus In Jayton, Texas
Crusoe has filed plans with the [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/tabs/search) for a two-building data center campus in Jayton, in rural Kent County, Texas, ...

Crusoe Files For $4.8B Data Center Campus In Jayton, Texas

November 27, 2026 Crusoe

Crusoe has filed plans with the Texas Department of Licensing and Regulation for a two-building data center campus in Jayton, in rural Kent County, Texas, carrying an estimated investment of $4.8 billion. The filings, first reported by Data Center Dynamics, place the site along County Road 233...

Read more
Read Galaxy Digital Files To Build 349,594 Sq Ft Helios 5 Data Center In Texas
[Galaxy Digital](https://baxtel.com/data-centers/galaxy-digital) has filed to build a 349,594-square-foot data center building at its Helios campus near Afton, Texas. The registration with the Texa...

Galaxy Digital Files To Build 349,594 Sq Ft Helios 5 Data Center In Texas

November 27, 2026 Galaxy Digital

Galaxy Digital has filed to build a 349,594-square-foot data center building at its Helios campus near Afton, Texas. The registration with the Texas Department of Licensing and Regulation lists the building as Helios 5 and puts its estimated construction cost at $1.3 billion, Data Center Dynamics...

Read more
Read Lea County Approves $130B Bond Deal For Google's Project Rancho
Lea County commissioners approved $130 billion in industrial revenue bonds for Project Rancho, a [Google](https://baxtel.com/data-centers/google) data center planned west of Hobbs, [New Mexico](htt...

Lea County Approves $130B Bond Deal For Google's Project Rancho

November 23, 2026 New Mexico

Lea County commissioners approved $130 billion in industrial revenue bonds for Project Rancho, a Google data center planned west of Hobbs, New Mexico. The 4-1 vote came at a Nov. 19 meeting in Lovington, where the board also rejected a proposed six-month moratorium on data center development, the...

Read more
Read Google Signs 50MW Superhot Geothermal PPA With Quaise in Oregon
Google will buy 50MW of superhot geothermal power from Quaise Energy's Project Obsidian in Central Oregon under a [power purchase agreement](https://www.quaise.com/news/quaise-energy-signs-50-mw-ge...

Google Signs 50MW Superhot Geothermal PPA With Quaise in Oregon

November 17, 2026 Google

Google will buy 50MW of superhot geothermal power from Quaise Energy's Project Obsidian in Central Oregon under a power purchase agreement announced Nov. 17. Quaise develops and operates Project Obsidian and will generate the electricity and sell it to Google under the agreement. The power is...

Read more
Read CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B
[CoreWeave](https://baxtel.com/data-centers/coreweave) added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud [reported third-quarter resu...

CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B

November 12, 2026 CoreWeave

CoreWeave added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud reported third-quarter results on Nov. 10 with revenue of $3.66 billion for the quarter ended Sept. 30, up 168 percent from a year earlier. The company said the gain doubled...

Read more
Read Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake
A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, [Oman](https://baxtel.com/regions/oman), backed by $3 billion of initial i...

Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake

November 11, 2026 Oman

A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, Oman, backed by $3 billion of initial investment, DCD reported Wednesday. US AI infrastructure firm Crusoe has indicated interest in becoming an off-taker. The facility would...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...