Google acquires Project Maize data center campus in Indiana
April 20, 2026
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019. Alphabet's public cloud is building an availability region in Zürich, Switzerland. The region will launch with three separate zones.
The Zurich region launch comes equipped with the standard set of GCP products, including Compute Engine, Google Kubernetes Engine, Cloud Bigtable, Cloud Spanner, and BigQuery. This is in addition to Cloud Interconnect, Google’s private, software-defined network provides a link between each region around the world.
| Distance | Site | About |
|---|---|---|
| 1.26 miles | nLighten: Zurich |
|
| 1.26 miles | Equinix Zurich ZH2 ZH4 |
|
| 1.30 miles | Equinix Zürich ZH1 | |
| 2.22 miles | Swisscom Zürich | |
| 3.42 miles | AtlasEdge: Zurich | |
| 3.92 miles | Digital Realty: ZUR4 |
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
|
| 3.94 miles | Digital Realty: Zurich |
|
| 3.97 miles | Digital Realty: ZUR2 |
|
| 3.99 miles | Green Datacenter Glattbrugg | |
| 4.04 miles | Digital Realty: ZUR3 |
|
| 4.24 miles | Equinix Zurich ZH5 | |
| 5.06 miles | NTT Zurich 1 |
The site was opened in June 2011, is located in Rümlang near Zurich.
|
| 5.20 miles | Green Datacenter Zurich City (Schlieren) |
|
| 6.25 miles | Vantage: Zurich ZRH3 |
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.
|
| 8.10 miles | Green Datacenter Dielsdorf Campus |
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland. The 500 million Swiss franc ($561.5 million) project is being built in Dielsdorf, approximately 15 km (9.3 miles) north of Zurich.
|
| 8.14 miles | Green Datacenter: Dielsdorf Bldg N |
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
|
| 8.19 miles | Green Datacenter: Dielsdorf Bldg O |
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
|
| 11.97 miles | Vantage Zurich ZRH1 |
|
| 12.24 miles | STACK: ZUR03 |
STACK Infrastructure plans to build another data center in Zurich.
|
| 12.29 miles | NorthC: Winterthur (Zurich) | |
| 13.58 miles | Vantage: Zurich II |
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
|
| 15.48 miles | STACK ZUR01 |
|
| 16.17 miles | Green Datacenter: Zurich West 4 |
Green Datacenter is expanding its Metro-Campus Zurich West with the construction of its fourth data center.
|
| 16.19 miles | Green Datacenter Lupig Zurich West 1 + 2 |
|
| 16.23 miles | Green Datacenter: Zurich West 3 |
In 2020, Green Datacenter expanded its Zurich West campus with a new data center building providing 5,500 m² of data center space.
|
April 20, 2026
April 15, 2026
April 13, 2026
April 07, 2026
March 27, 2026
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas