TowerInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Switzerland
Operational
Fully operational facility
Operated by:

Google Zurich

The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019. Alphabet's public cloud is building an availability region in Zürich, Switzerland. The region will launch with three separate zones.

The Zurich region launch comes equipped with the standard set of GCP products, including Compute Engine, Google Kubernetes Engine, Cloud Bigtable, Cloud Spanner, and BigQuery. This is in addition to Cloud Interconnect, Google’s private, software-defined network provides a link between each region around the world.

Map and Nearby Locations

This Facility ( Address is Approximate )
Google Sites
Nearby Facilities

Sites within 15 miles of Plaza UltraInterested in this information?Contact us

Distance Site About
1.26 miles nLighten: Zurich
1.26 miles Equinix Zurich ZH2 ZH4
1.30 miles Equinix Zürich ZH1
2.22 miles Swisscom Zürich
3.42 miles AtlasEdge: Zurich
3.92 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
3.94 miles Digital Realty: Zurich
3.97 miles Digital Realty: ZUR2
3.99 miles Green Datacenter Glattbrugg
4.04 miles Digital Realty: ZUR3
4.24 miles Equinix Zurich ZH5
5.06 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
5.20 miles Green Datacenter Zurich City (Schlieren)
6.25 miles Vantage: Zurich ZRH3
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.
8.10 miles Green Datacenter Dielsdorf Campus
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland. The 500 million Swiss franc ($561.5 million) project is being built in Dielsdorf, approximately 15 km (9.3 miles) north of Zurich.
8.14 miles Green Datacenter: Dielsdorf Bldg N
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
8.19 miles Green Datacenter: Dielsdorf Bldg O
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
11.97 miles Vantage Zurich ZRH1
12.24 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.
12.29 miles NorthC: Winterthur (Zurich)
13.58 miles Vantage: Zurich II
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
15.48 miles STACK ZUR01
16.17 miles Green Datacenter: Zurich West 4
Green Datacenter is expanding its Metro-Campus Zurich West with the construction of its fourth data center.
16.19 miles Green Datacenter Lupig Zurich West 1 + 2
16.23 miles Green Datacenter: Zurich West 3
In 2020, Green Datacenter expanded its Zurich West campus with a new data center building providing 5,500 m² of data center space.

CentralInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

233
Facilities
74
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your