Oslo Data Center Market

Latest Podcast

The Oslo data center market is located in the country of Norway within EMEA. Oslo has 46 facilities with 864,307 sqft and 227 megawatts.

The top providers in Oslo are hscale (3 sites) and Polar DC with 3 facilities . The most popular facilities are Stack: OSL03A Fetsund and Stack OSL04C.

Market Facts

Oslo Data Center Map

Oslo Power Growth Over Time

+185% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Oslo

Name Company Size Status Type
Stack: OSL03A Fetsund STACK INFRASTRUCTURE Extra Small Operational HPC
Stack OSL04C STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL03B STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL03C STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL04B STACK INFRASTRUCTURE Small Planned HPC
Stack: OSL03D STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL04E STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL04A STACK INFRASTRUCTURE Small Operational HPC
Stack: OSL04D STACK INFRASTRUCTURE Small Planned HPC
Stack: OSL04F STACK INFRASTRUCTURE Small Planned HPC
TeliaSonera Oslo Telia Company Operational Carrier
Verizon Oslo Verizon Enterprise Operational Carrier
IP-Only: Availo DC0 GlobalConnect A / S Small Operational Carrier
IP-Only HMG9 GlobalConnect A / S Operational Carrier
Blix Gullhaugveien Blix Solutions AS Operational Carrier-Neutral
Blix CJH Oslo Blix Solutions AS Operational Carrier-Neutral
Blix BDC Oslo Blix Solutions AS Extra Small Operational Carrier-Neutral
Blix: NR5 Oslo Blix Solutions AS Small Operational Carrier-Neutral
EVRY AS Gjøvik EVRY Operational Carrier-Neutral
SSC Forskningsparken Oslo (Oslo Science Park) SSC Networks Norge AS Operational Carrier-Neutral
Fujitsu Oslo Fujitsu Operational Carrier-Neutral
Green Mountain: OSL1 DC1 Green Mountain AS Small Operational Carrier-Neutral
Green Mountain: OSL1 DC2 Green Mountain AS Small Operational Carrier-Neutral
Green Mountain: OSL1 DC3 Green Mountain AS Small Operational Carrier-Neutral
Green Mountain: OSL1 DC4 Green Mountain AS Small Operational Carrier-Neutral
Green Mountain: OSL1 DC5 Green Mountain AS Small Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Green Mountain AS Large Construction, Planned Carrier-Neutral
Bulk: Oslo Internet Exchange (OS-IX) Bulk Infrastructure AS Small Operational Carrier-Neutral
Central TowerInterested in this information?Contact us Microsoft Azure Small Operational Hyperscale
GammaInterested in this information?Contact us Google Large Planned, Prospective Expansion Hyperscale
Orange: Oslo OSL3 Orange Small Operational Carrier
Orange: Grorud OSL3 Orange Small Operational Carrier
Orange: Lorenskog OSL5 Orange Small Operational, Planned Carrier
StoreSpeed Fredrikstad DC1 StoreSpeed AS Small Operational Carrier-Neutral
Edge HubInterested in this information?Contact us Kryptovault AS Decommissioned Crypto Miner Hosting
Polar DC: OSL01 Polar DC Extra Large Construction, Operational, Planned Carrier-Neutral
Polar DC: Heroya Polar DC Large Construction Carrier-Neutral
hscale: OSL1 hscale Extra Large Construction, Operational, Planned Carrier-Neutral
hscale: OSL2 hscale Small Construction Carrier-Neutral
hscale: Oslo OSL3 hscale Extra Large Planned Carrier-Neutral
Skygard: Hovinbyen, Oslo Skygard Medium Operational Carrier-Neutral
Polarise: AI Hub One Polarise Medium Construction, Operational Carrier-Neutral
Magnora: Nedre Rommen 5 Magnora Extra Small Planned Carrier-Neutral
DC Sarpsborg: Hasle, Oslo DC Sarpsborg Extra Large Planned Energy
Vaultica: OSL01 Vaultica Extra Small Operational, Prospective Expansion Carrier-Neutral
Vaultica: OSL02 Vaultica Extra Small Operational Carrier-Neutral

Largest Providers in Oslo

hscale
Site
Power
Operational
1
50.0
Construction
2
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Polar DC
Site
Power
Operational
1
20.0
Construction
2
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Green Mountain AS
Site
Power
Operational
5
41.5
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
STACK INFRASTRUCTURE
Site
Power
Operational
7
31.6
Construction
0
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
7
View Provider

Largest Data Centers in Oslo

Location About Total SqFt Power (MW)
TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
Polar DC: OSL01 NN Request Dataset
Skygard: Hovinbyen, Oslo
Construction has begun on the first facility in Hovinbyen, Oslo, following a joint investment of ...
NN Request Dataset
Green Mountain: OSL1 DC3
The third building (DC3) of Green Mountain's OSL1-Enebakk campus was launched in December 2022. T...
NN Request Dataset NN Request Dataset
IP-Only: Availo DC0 NN Request Dataset

Sites Under Construction in Oslo

Location Building SqFt Power (MW) Estimated Launch
Polar DC: Heroya 240,000 SqFt 40 Megawatts
Polar DC: OSL01 SqFt 45 Megawatts Q1 2026
Polarise: AI Hub One SqFt 8 Megawatts Q4 2026
hscale: OSL1 SqFt 50 Megawatts Q2 2026
hscale: OSL2 SqFt 12 Megawatts Q2 2026

Related News See all

Read Entergy Adds 440MW Solar PPA For Google West Memphis Expansion
Entergy Arkansas plans roughly $600 million of new generation and transmission for [Google](https://baxtel.com/data-centers/google)'s data center campus in [West Memphis](https://baxtel.com/data-ce...

Entergy Adds 440MW Solar PPA For Google West Memphis Expansion

October 20, 2026 Google

Entergy Arkansas plans roughly $600 million of new generation and transmission for Google's data center campus in West Memphis, Arkansas, with Google covering the cost. The utility announced a second phase of its service agreement on Oct. 19 that adds a 440 MW solar contract and two battery...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read Google evaluates Wood Haven Technology Park in Roanoke County, Virginia
Google is considering developing a data center campus at Wood Haven Technology Park in Roanoke County, Virginia. Google and the Western Virginia Regional Industrial Facility Authority confirmed the...

Google evaluates Wood Haven Technology Park in Roanoke County, Virginia

October 19, 2026 Google

Google is considering developing a data center campus at Wood Haven Technology Park in Roanoke County, Virginia. Google and the Western Virginia Regional Industrial Facility Authority confirmed the potential project on October 16. Google's regional public affairs manager, Clay Allsop, said:...

Read more
Read Google Strategic Sourcing Executive Joins OpenAI
Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air c...

Google Strategic Sourcing Executive Joins OpenAI

October 17, 2026 Google

Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air cooling, interconnects, and mechanical equipment. She joined OpenAI in May and will focus on...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?