Latest Podcast Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

Google: Inzai, Japan

Year Built: 2023
░░░░ Request Dataset MW
Total Power

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Google: Inzai, Japan Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hub Gamma

Distance Site About
0.16 miles STT Tokyo 2
STT Tokyo 2 is the second of two buildings in STT GDC's data center campus
0.17 miles STT Tokyo 1
STT Tokyo 1 is the first of two buildings in STT GDC's data centre campus, supporting the demand for critical digital infrastructure in Japan.
0.41 miles Goodman: Shirakami
The Shirakami Data Centre developed by Goodman Group is located in Inzai City, Chiba Prefecture, within the Goodman Business Park—a major data center cluster about 50 kilometers east of central Tokyo.
0.79 miles Hyperscale Data Center Request Dataset
0.79 miles Hyperscale Data Center Request Dataset
0.88 miles MC Digital Realty-Inazi (NRT10)
0.91 miles Colt Inzai 4
Known as Inzai 4 and set on a site area of 8,750 sqm (94,185 sq ft), the facility is already 100 percent pre-let.
0.91 miles Equinix TY12x
0.94 miles Equinix: TY13x
Equinix opened a new hyperscale data center, TY13x, in Tokyo, Japan in 2023. The facility is located in the Inzai region, adjacent to the existing TY12x data center.
1.02 miles Hyperscale Data Center Request Dataset
1.04 miles MC Digital Realty: NRT14
Digital Realty’s NRT14 is a 31MW data center at its Inzai campus near Tokyo, marking the third building in the development and bringing the site to ~104MW as an AI-optimized facility that became operational in April 2026.
1.11 miles MC Digital Realty (NRT12)
NRT12 is designed to offer high-density power of up to 70kW per rack
1.16 miles Colt: Inzai 3
This facility is a part of Colt's Inzai campus in Tokyo.
1.17 miles Colt: Inzai 2
This facility is a part of Colt's Inzai campus in Tokyo.
1.19 miles Colt Tokyo Inzai
The Colt campus in Chiba was opened in 2011 and hosts three facilities
1.20 miles MC Digital: Tokyo Connected Campus @ Inzai
1.45 miles Colt: Inzai 5
Colt is building Inzai 5 Campus on a 2.5 acre site in Chiba, Tokyo.
1.56 miles AirTrunk Tokyo TOK1
AirTrunk’s first data centre in Japan, AirTrunk TOK1 in Inzai near Tokyo, officially opened its doors in November 2021.
1.57 miles AirTrunk: TOK1 DC6
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.61 miles AirTrunk: TOK1 DC2
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.62 miles AirTrunk: TOK1 DC5
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.63 miles AirTrunk: TOK1 DC7
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.66 miles AirTrunk: TOK1 DC4
This planned facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.66 miles AirTrunk: TOK1 DC3
This facility is part of AirTrunk's Tokyo 1 campus in Japan.
1.97 miles STACK TKY01
Stack Infrastructure completed their first Tokyo facility in 2024. The campus, situated in the Inzai District of Greater Tokyo, was developed collaboratively with IPI Partners and Oaktree Capital Management.
1.98 miles STACK: TKY01B
This facility is part of Stack Infrastructure's first campus in Tokyo, Japan.
2.07 miles Carrier-Neutral Data Center Request Dataset
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
2.13 miles Carrier-Neutral Data Center Request Dataset
This facility is part of ADA Infrastructure's Tokyo East Campus in Tokyo.
2.17 miles ADA: Tokyo East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
2.30 miles IIJ: Shiroi Bldg 4
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
2.30 miles IIJ: Shiroi DCC
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
2.31 miles IIJ: Shiroi Bldg 3
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
2.35 miles IIJ: Shiroi Bldg 2
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
4.61 miles NTT: Shiroi SHR1
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
4.99 miles ADA: Tokyo East 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
15.52 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
15.55 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
16.72 miles INAP Edogawa-ku
19.67 miles NTT TK9
19.68 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
19.76 miles NTT TK2

Global Hub Data Center Photos See all

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

233
Facilities
74
Markets

News See all

Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read Google Plans $1.5 Billion Expansion of Alabama Data Center Campus
Google will invest an additional $1.5 billion to expand its data center campus in Jackson County through 2027. The site, built on the former Widows Creek coal plant, has been operational since 2019...

Google Plans $1.5 Billion Expansion of Alabama Data Center Campus

June 16, 2026 Google

Google will invest an additional $1.5 billion to expand its data center campus in Jackson County through 2027. The site, built on the former Widows Creek coal plant, has been operational since 2019. According to Baxtel, it currently includes two 135,000 sq ft (12,540 sqm) data center buildings,...

Read more
Read Top Data Center News for 8th-13th of June, 2026
**[OpenAI in Early Talks for 10GW Data Center Lease in Ohio](https://baxtel.com/news/openai-in-early-talks-for-10gw-data-center-lease-in-ohio)**
**OpenAI is in advanced talks to lease a proposed 1...

Top Data Center News for 8th-13th of June, 2026

June 15, 2026 Google

OpenAI in Early Talks for 10GW Data Center Lease in Ohio OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio which could be built in phases starting with an 800MW first stage expected in 2028, with full build-out estimated to cost up to $500 billion. Microsoft Acquires...

Read more
Read Jinko Power Targets 1GW Solar-Backed AI Data Center Project in Western China
Chinese solar developer Jinko Power, a subsidiary of the broader Jinko Solar Group, is planning a 1GW data center project in Ningxia, western China, that will be powered directly by a dedicated sol...

Jinko Power Targets 1GW Solar-Backed AI Data Center Project in Western China

June 12, 2026 Google

Chinese solar developer Jinko Power, a subsidiary of the broader Jinko Solar Group, is planning a 1GW data center project in Ningxia, western China, that will be powered directly by a dedicated solar facility. According to a report by Nikkei, the company has signed a framework investment...

Read more
Read Google to Pay SpaceX-xAI $920 Million Per Month for AI Data Center Capacity
Google has entered into an agreement with SpaceX to secure large-scale computing capacity. According to a regulatory filing submitted by SpaceX on June 5, Google will lease roughly 110,000 GPUs, CP...

Google to Pay SpaceX-xAI $920 Million Per Month for AI Data Center Capacity

June 08, 2026 Google

Google has entered into an agreement with SpaceX to secure large-scale computing capacity. According to a regulatory filing submitted by SpaceX on June 5, Google will lease roughly 110,000 GPUs, CPUs, memory modules, and related infrastructure for approximately $920 million per month. The...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?