MaxInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Grays, UK
Planned
Future facility in planning stage
Operated by:

Google: Purfleet

Lot Size: 129 acres

Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments. The 129 acres, located on Arterial Road in Purfleet, was sold to Global Infrastructure UK Limited for £47 million ($57.3m) in a deal completed in July 2023. LSL sold it to tech giant google in late 2023.
The land was previously used as the Arena Essex Raceway; a stock car and speedway racing track that opened in 1978 and closed in 2018.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of MetroInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Fujitsu: London East (SDC01)
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
NN milesInterested in this information?Contact us Custodian Dartford DA2
NN milesInterested in this information?Contact us Digital Reef: East Havering Campus
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
NN milesInterested in this information?Contact us OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
NN milesInterested in this information?Contact us Stratus: Belvedere
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
NN milesInterested in this information?Contact us Clearstone Energy: Ebbsfleet Campus
UK developer Clearstone Energy has proposed the Ebbsfleet AI Data Centre Campus on 145 acres near Dartford, Kent.
NN milesInterested in this information?Contact us NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
NN milesInterested in this information?Contact us Clearstone Energy: East London Campus
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Google Reveals It Is Behind 506-Acre Project Clydesdale Data Center In Oklahoma
Google has confirmed it is behind the Project Clydesdale data center campus near Tulsa, Oklahoma. Developed by Beale Infrastructure, the 506-acre campus will be located near the Cherokee Industrial...

Google Reveals It Is Behind 506-Acre Project Clydesdale Data Center In Oklahoma

August 19, 2026 Google

Google has confirmed it is behind the Project Clydesdale data center campus near Tulsa, Oklahoma. Developed by Beale Infrastructure, the 506-acre campus will be located near the Cherokee Industrial Park in Owasso. “The Tulsa Regional Chamber is thrilled that Google is deepening its footprint in...

Read more
Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?