Fujitsu: London East (SDC01)
|
Fujitsu's London East (SDC01) data center on Weston Avenue in West Thurrock, Essex, is one of the company's UK service data centers and is staffed around the clock.
|
|
NN milesInterested in this information?Contact us
|
Custodian Dartford DA2
|
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
|
|
NN milesInterested in this information?Contact us
|
Statera: Thurrock Data Centre
|
Statera Energy proposes a data center campus of about 500 MW with battery storage and a 42 ha ecology park on farmland between Dock Road and Marshfoot Road at Tilbury in Thurrock, Essex, connected through its Thurrock power and storage site.
|
|
NN milesInterested in this information?Contact us
|
Digital Reef: East Havering Campus
|
Digital Reef proposes a data center campus of up to 340,000 m2 on Green Belt land at Fen Lane near Upminster in the London Borough of Havering, with a 600 MVA grid connection from Warley substation. Havering Council consulted on a draft Local Development Order for the scheme in 2026.
|
|
NN milesInterested in this information?Contact us
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
|
NN milesInterested in this information?Contact us
|
Stratus: Belvedere
|
Stratus Data Centres plans two Tier III data centers on a brownfield site on Norman Road North in Belvedere, in the London Borough of Bexley, with private-wire power from the neighbouring Riverside energy-from-waste plant. Bexley approved the scheme in 2020.
|
|
NN milesInterested in this information?Contact us
|
Clearstone Energy: Ebbsfleet Campus
|
Clearstone Energy proposes a 300 MW AI data center campus of four buildings on about 58.5 ha off New Barn Road near Southfleet, in the Borough of Dartford, Kent. The government directed in 2026 that the project be consented as a nationally significant infrastructure project.
|
|
NN milesInterested in this information?Contact us
|
DARE DC: St Cleres, Stanford-le-Hope
|
DARE DC proposes a 14 MW data center on a 3.9 ha greenfield site at St Cleres on Stanford Road, Stanford-le-Hope, in Thurrock, Essex, with a UK Power Networks connection targeted for 2030.
|