Station PrimeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Grays, United Kingdom
Planned
Future facility in planning stage
Operated by:

Google: Purfleet

Lot Size: 129 acres

Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments. The 129 acres, located on Arterial Road in Purfleet, was sold to Global Infrastructure UK Limited for £47 million ($57.3m) in a deal completed in July 2023. LSL sold it to tech giant google in late 2023.
The land was previously used as the Arena Essex Raceway; a stock car and speedway racing track that opened in 1978 and closed in 2018.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of SouthInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Fujitsu: London East (SDC01)
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
NN milesInterested in this information?Contact us Custodian Dartford DA2
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
NN milesInterested in this information?Contact us Digital Reef: East Havering Campus
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
NN milesInterested in this information?Contact us OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
NN milesInterested in this information?Contact us Stratus: Belvedere
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
NN milesInterested in this information?Contact us Clearstone Energy: Ebbsfleet Campus
UK developer Clearstone Energy has proposed the Ebbsfleet AI Data Centre Campus on 145 acres near Dartford, Kent.
NN milesInterested in this information?Contact us NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
NN milesInterested in this information?Contact us Clearstone Energy: East London Campus
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Google Identified as User Behind 1,200MW Goochland Data Center Campus
Google is considering a 1,200MW data center campus on about 1,000 acres in Goochland County, Virginia, the county confirmed on Oct. 28. The [county's announcement](https://www.goochlandva.us/) name...

Google Identified as User Behind 1,200MW Goochland Data Center Campus

October 29, 2026 Google

Google is considering a 1,200MW data center campus on about 1,000 acres in Goochland County, Virginia, the county confirmed on Oct. 28. The county's announcement named Google as the company behind a project that appeared in Virginia regulatory filings in July without an identified owner. Google...

Read more
Read Oracle To Deploy Google TPUs On OCI In Multi-Gigawatt Deal
Oracle will sell Google's Tensor Processing Units through Oracle Cloud Infrastructure under a deal the companies [announced](https://www.oracle.com/news/announcement/ai-world-oracle-brings-google-t...

Oracle To Deploy Google TPUs On OCI In Multi-Gigawatt Deal

October 28, 2026 Oracle

Oracle will sell Google's Tensor Processing Units through Oracle Cloud Infrastructure under a deal the companies announced on Oct. 27. The agreement makes OCI the first hyperscale cloud platform outside Google to offer the chips, Google Cloud said. TPU capacity on OCI is scheduled to become...

Read more
Read Hermantown Sets Friday Vote On Google Data Center After Protests Halt Meetings
Hermantown has moved its City Council vote on Google's proposed data center to Friday after protests shut down two meetings. The city scheduled the session for 6:30 p.m. on Oct. 30 with the same si...

Hermantown Sets Friday Vote On Google Data Center After Protests Halt Meetings

October 27, 2026 Google

Hermantown has moved its City Council vote on Google's proposed data center to Friday after protests shut down two meetings. The city scheduled the session for 6:30 p.m. on Oct. 30 with the same six resolutions from the canceled Oct. 27 agenda, according to a city press release. The resolutions...

Read more
Read Google Apologizes And Halts Work At Two Finnish Data Center Sites
Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its [Muhos](https://baxtel.com/data-center/google-muhos) and [Kajaani](https://bax...

Google Apologizes And Halts Work At Two Finnish Data Center Sites

October 26, 2026 Google

Finland's Licensing and Supervision Authority has told Google subsidiary Tuike Finland to keep preparatory work at its Muhos and Kajaani data center sites suspended. The agency set an Oct. 23 deadline for felling, excavation, blasting and road building to stop at both sites, according to its...

Read more
Read Google Expands Voltus Capacity Deal To More Than 1GW In PJM
Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies [announced](https://www.voltus.co/press/google-voltus-1gw) the expansion of their Bring Yo...

Google Expands Voltus Capacity Deal To More Than 1GW In PJM

October 23, 2026 Google

Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies announced the expansion of their Bring Your Own Capacity agreement on Oct. 22, adding 1,070 MW to the 100 MW they committed in June. Voltus aggregates flexible capacity from homes and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?