Latest Podcast Street AddressInterested in this information?Contact us, TTC Industrial Area, MIDC Industrial Area, Turbhe, Navi Mumbai, Maharashtra 400703, India
Under Construction
New facility under construction
Operated by:

Google: Navi Mumbai

Year Planned: 2027
Floors: 8
This site is leased from EverYondr in the EverYondr: Mumbai 1 building

In 2023, Google secured a long-term lease agreement for a substantial data center in Navi Mumbai, spanning 381,000 sq ft (35,400 sqm). The lease term extends beyond 28 years. This eight-story facility will be situated within the Maharashtra Industrial Development Corporation's (MIDC) industrial estate.

The transaction was executed through Google's affiliate, Raiden Infotech India, in partnership with Amanthin Info Parks Private Limited. Amanthin, which is leasing the land from MIDC, is a subsidiary of EverYondr – a joint venture established in 2021 between Everstone Group and data center developer Yondr Gr

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Point PlusInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of CloudInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us EverYondr: Mumbai 1
Yondr Group, a global developer, owner-operator and service provider of hyperscale data centres, in a joint venture partnership with the Everstone Group, is investing USD one billion to open data centres across multiple locations in India.
NN milesInterested in this information?Contact us Sify: Mumbai 01 Vashi
Sify’s data center in Vashi, Navi Mumbai, is India’s first commercial data center with 375 rack space.
NN milesInterested in this information?Contact us Bridge Data Centres Mumbai BBY1
NN milesInterested in this information?Contact us Nxtra: Mumbai III
Nxtra Data is building a Hyperscale park with 600,000 sq ft built-up area spread across 3 towers in Navi Mumbai.
NN milesInterested in this information?Contact us ESDS: Mumbai DC
This facility is spread over 80,000 sq. ft. of building space.
NN milesInterested in this information?Contact us NTT NAV1A
NTT's Navi Mumbai Data Center (NAV1A) is the first facility on the company's second hyperscale data center campus in India. Spread across 37,000m², it has the capacity to host 5,000 racks.
NN milesInterested in this information?Contact us NTT: NAV1B
This data center is a part of NTT's Mhape campus in Navi Mumbai.
NN milesInterested in this information?Contact us NTT: NAV1C
NAV1C is a data center building on NTT's Navi Mumbai 1 campus in the TTC Industrial Area at Mahape, Navi Mumbai, alongside NAV1A and NAV1B.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Google Expands Voltus Capacity Deal To More Than 1GW In PJM
Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies [announced](https://www.voltus.co/press/google-voltus-1gw) the expansion of their Bring Yo...

Google Expands Voltus Capacity Deal To More Than 1GW In PJM

October 23, 2026 Google

Google will buy 1,070 MW of additional flexible capacity from Voltus in the PJM grid region. The companies announced the expansion of their Bring Your Own Capacity agreement on Oct. 22, adding 1,070 MW to the 100 MW they committed in June. Voltus aggregates flexible capacity from homes and...

Read more
Read Entergy Adds 440MW Solar PPA For Google West Memphis Expansion
Entergy Arkansas plans roughly $600 million of new generation and transmission for [Google](https://baxtel.com/data-centers/google)'s data center campus in [West Memphis](https://baxtel.com/data-ce...

Entergy Adds 440MW Solar PPA For Google West Memphis Expansion

October 20, 2026 Google

Entergy Arkansas plans roughly $600 million of new generation and transmission for Google's data center campus in West Memphis, Arkansas, with Google covering the cost. The utility announced a second phase of its service agreement on Oct. 19 that adds a 440 MW solar contract and two battery...

Read more
Read Google evaluates Wood Haven Technology Park in Roanoke County, Virginia
Google is considering developing a data center campus at Wood Haven Technology Park in Roanoke County, Virginia. Google and the Western Virginia Regional Industrial Facility Authority confirmed the...

Google evaluates Wood Haven Technology Park in Roanoke County, Virginia

October 19, 2026 Google

Google is considering developing a data center campus at Wood Haven Technology Park in Roanoke County, Virginia. Google and the Western Virginia Regional Industrial Facility Authority confirmed the potential project on October 16. Google's regional public affairs manager, Clay Allsop, said:...

Read more
Read Google Strategic Sourcing Executive Joins OpenAI
Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air c...

Google Strategic Sourcing Executive Joins OpenAI

October 17, 2026 Google

Allyson Fealtman, a former Google data center strategic sourcing and supplier development lead, has joined OpenAI after 16 years at Google. She led 11 commodity managers overseeing liquid and air cooling, interconnects, and mechanical equipment. She joined OpenAI in May and will focus on...

Read more
Read AEP To Invest $4B In 702MW Fuel Cell Plant For Google
American Electric Power will invest about $4 billion in a 702 MW fuel cell generation project near Cheyenne, Wyoming, under a 20-year power purchase agreement with [Google](https://baxtel.com/data-...

AEP To Invest $4B In 702MW Fuel Cell Plant For Google

October 15, 2026 Google

American Electric Power will invest about $4 billion in a 702 MW fuel cell generation project near Cheyenne, Wyoming, under a 20-year power purchase agreement with Google, the utility announced. The plant is being developed through Cheyenne Fuel Cell, LLC, and is targeted to reach full operation...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?