Denmark Data Center Market

Login to Add Favorite Login to

The Denmark Data Center Map Has 26 Sites

Search Denmark's Data Centers


Denmark Data Center List

  • Utility: Energinet
  • Owns Owns the Building

As of April 2019, work on the data center has reportedly been stopped.

Apple Denmark Viborg
Hobro Landevej 8
8830 Tjele, Denmark
  • Utility: Energinet
  • Owns Owns the Building

The data center will be located next to one of Denmark’s largest electrical substations, which Apple said will help it eliminate the need for additional generators. The facility is designed to capture excess heat from equipment inside and conduct it into the district heating system to help warm homes in the neighboring community.

  • 18.0 MWs Under Construction
  • Q3 2019 Scheduled completion

Bulk's DK01 Campus, Esbjerg, southwest Denmark, was launched in December 2019.

Colt Copenhagen
Borgmester Christiansens Gade 55
2450 København SV, Denmark
Located in Copenhagen
  • 12,917 Gross SqFt
  • 2.8 Megawatts
DigiPlex Copenhagen
Holmbladsgade 142
2300 København, Denmark
Located in Copenhagen

Top Data Center Providers in Denmark

Sites Sites Gross SqFt Gross SqFt Power (MW) Power (MW)
Colt Data Centre Services 1 12,917 2.80
InterXion 1 0 0.00
Styrelsen for Undervisning og Kvalitet 1 0 0.00
Teracom, Boxer Group 1 0 0.00
DigiPlex Norway AS 1 0 0.00
{{ provider.company_name }} {{ provider.sites_count_for_region }} {{ provider.sqft_for_region }} {{ provider.power_mw_for_region }}

Largest Data Centers in Denmark

Gross SqFt Gross SqFt Power (MW) Power (MW)
Colt Copenhagen 12,917 2.80
GlobalConnect Kolding
Level3 Malmö
Nianet Vallensbæk
Facebook Odense Denmark
{{ datacenter.site_name }} {{ datacenter.total_gross_sqft }} {{ datacenter.total_power_mw }}

Top Denmark Datacenter Markets by # of Sites

Loading...

Top Denmark Datacenter Markets by Power Capacity (MW)

Loading...

Data Center Construction in Denmark

Company Region Name Site Name Building SqFt Gross SqFt Power (MWs) Estimated Launch
Facebook Denmark Facebook Odense Denmark 270000 120.0
Bulk Infrastructure AS Denmark Bulk Infrastructure: Esbjerg Denmark DK01 18.0 Nov 01 2019
Total 270000 0 138.0

Google, Facebook, and two Apple Data Centers are being constructed in Denmark.
A visualization from Cowi shows the proposed data center in Esbjerg. The campus will have four data centers and administration buildings. In total, the center will have fully built 250,000 square m...
The plan calls for 6 data center buildings
The administration building is to the left of the picture, while the current DC power station Tjele is just outside the picture to the right. 

There are two transformer stations which are below ...
The administration building is in the foreground
Present for the Groundbreaking Ceremony were Jesper Frost Rasmussen, Mayor of Esbjerg Kommune, Peder Nærbø, founder and chairman of Bulk Infrastructure and Karsten Rieder, commercial manager at Bus...
Google, Facebook, and two Apple Data Centers are being constructed in Denmark.
Webscale Data Center Deployments in Denmark

Google, Facebook, and two Apple Data Centers are being constructed in Denmark.

Source: viborg-folkeblad.dk
Facebook's Heat Recovery Project in Denmark
Posted in Facebook Odense Denmark Source: Facebook
A visualization from Cowi shows the proposed data center in Esbjerg. The campus will have four data centers and administration buildings. In total, the center will have fully built 250,000 square m...
Rendering of FB's Proposed Data Center in Esbjerg
Posted in Facebook Esbjerg Denmark

A visualization from Cowi shows the proposed data center in Esbjerg. The campus will have four data centers and administration buildings. In total, the center will have fully built 250,000 square meters.

Source: Cowi
Plot of Land for Facebook Data Center in Esbjerg
Posted in Facebook Esbjerg Denmark
Project Ember Land Plot
Posted in Facebook Esbjerg Denmark Source: Christer Holte
Apple's Data Center in Foulum (Viborg) under Construction in 2017
Posted in Apple Denmark Viborg
The Apple Data Center is Located next to the Aarhus Universitet Foulum Campus
Posted in Apple Denmark Viborg
The plan calls for 6 data center buildings
Viborg Campus Plan
Posted in Apple Denmark Viborg

The plan calls for 6 data center buildings

The administration building is to the left of the picture, while the current DC power station Tjele is just outside the picture to the right. 

There are two transformer stations which are below ...
Another Sketch of the Viborg Facility in Denmark
Posted in Apple Denmark Viborg

The administration building is to the left of the picture, while the current DC power station Tjele is just outside the picture to the right.

There are two transformer stations which are below the data halls.

The administration building is in the foreground
Rendering of Viborg Data Center Campus
Posted in Apple Denmark Viborg

The administration building is in the foreground

Source: Apple
Caverion built a dedicated 150kV high-voltage station for Apple
Posted in Apple Denmark Viborg Source: Caverion
Google Acquired Land Adjacent to Apple's Data Center Construction Project in Aabenraa
Posted in Apple Aabenraa Kassø (Construction Halted) Source: Aabenraa Municipality
Site Plan for Apple's 2nd Data Center in Denmark
Posted in Apple Aabenraa Kassø (Construction Halted) Source: Aabenraa Kommune
Transformer Station Near the Apple (and Google) Construction Projects
Posted in Apple Aabenraa Kassø (Construction Halted)
In 2017 Google Acquired Land Adjacent to Apple's Defunct Data Center Construction Project in Aabenraa
Posted in Google Aabenraa (Prospective)
Glass Facade of DigiPlex in Denmark
Posted in DigiPlex Copenhagen
First Building on Bulk's DK01 campus
Posted in Bulk Infrastructure: Esbjerg Denmark DK01 Source: Bulk Infrastructure
Present for the Groundbreaking Ceremony were Jesper Frost Rasmussen, Mayor of Esbjerg Kommune, Peder Nærbø, founder and chairman of Bulk Infrastructure and Karsten Rieder, commercial manager at Bus...
Shovel in. Groundbreaking Ceremony
Posted in Bulk Infrastructure: Esbjerg Denmark DK01

Present for the Groundbreaking Ceremony were Jesper Frost Rasmussen, Mayor of Esbjerg Kommune, Peder Nærbø, founder and chairman of Bulk Infrastructure and Karsten Rieder, commercial manager at Business Esbjerg