Overview
Stockholm is the main colocation and interconnection market in Sweden. Most of its data centres sit in the city and its suburbs, with the densest cluster in the Kista technology district. Global operators such as Digital Realty and Equinix compete with Swedish hosting firms and internet providers. The market also reaches 60 to 100 km into Södermanland, where AWS runs a cloud campus at Eskilstuna.
History
The market grew out of Stockholm's early internet. D-GIX, Sweden's first internet exchange, launched at the Royal Institute of Technology (KTH) in 1992. The city founded Stokab in 1994 to lease dark fibre to all operators on equal terms. Netnod formed in 1996 and took over the exchange in 1997. Interxion opened its first Stockholm data centre in Kista.
Bahnhof opened Pionen in 2008, inside a former civil-defence bunker under Vita Bergen on Södermalm. TelecityGroup added sites in Sköndal in 2009 and Spånga in 2014 to its original data centre in Bromma. Equinix took over all three when it bought Telecity in January 2016. That year Nasdaq moved its Nordic primary data centre to DigiPlex's facility at Upplands Väsby, north of the city. Sungard Availability Services sold its Swedish business to Segulah in 2018. It relaunched as Conapto.
Amazon Web Services opened its Europe (Stockholm) cloud region in December 2018. Its data centres sit in Eskilstuna, Västerås and Katrineholm. Digital Realty took over Interxion's Kista campus in March 2020. It opened a sixth building there that September. Microsoft opened its Swedish cloud region in 2021, with data centres in Gävle, Sandviken and Staffanstorp. atNorth opened its first Swedish data centre in Kista in March 2022. Google Cloud launched its Stockholm cloud region in March 2025.
The Market Today
Kista, in the north-west of the city, holds the largest cluster. Digital Realty runs six buildings on its Kista campus, the city's most connected carrier hotel. atNorth runs SWE01 nearby. It is building SWE02, a liquid-cooled AI data centre due in late 2027. SWE01 hosts 6G AI Sweden's national AI cloud.
Equinix runs three sites, in Bromma, Sköndal and Spånga. Its Bromma site, SK1, ranks second among the city's carrier hotels. Conapto runs four sites in the city and Sollentuna. Its largest, STHLM 4 South in Sätra, opened in August 2024. CoreWeave took capacity there under a June 2026 agreement. Vaultica runs the former DigiPlex building at Upplands Väsby. STACK plans a second building beside it. nLighten runs the former Verizon data centre in Spånga. Bahnhof, Obenet, GlobalConnect, GleSYS, Kolo, Binero and Telia run smaller sites across the metro.
Netnod's Stockholm exchange connects at most of the large sites, alongside the STHIX, SONIX and SOLIX exchanges. Stokab's KN7 hub, in a rock shelter under a school in Östermalm, ranks third among the city's carrier hotels.
Advantages
-
Connectivity. Stokab's dark fibre reaches nearly every business in Stockholm. Any operator can lease it on equal terms.
-
Clean power. Sweden generates almost all its electricity from hydro, nuclear and wind. Buyers with carbon targets get low-carbon power from the grid itself.
-
Heat sales. Stockholm Exergi buys waste heat from data centres for the city's district heating network. Its Open District Heating programme has run since 2012. atNorth's SWE01 sends its heat to a neighbouring Stockholm Exergi plant.
-
Demand base. Government agencies, banks, the Nasdaq Stockholm exchange and a large technology sector want capacity close to the capital.
Challenges
-
Grid access. Svenska kraftnät (Svk) says Stockholm's power use is already so high that the current transmission grid cannot take further increases. Its Stockholms Ström and Storstockholm Väst reinforcements are due around 2030.
-
Queue pressure. On 1 November 2026, data centres held 8,200 MW of applications in Svk's national connection queue. On 3 November 2026, Svk said it is considering temporary restrictions on applications for very large loads.
-
Power prices. Stockholm sits in bidding zone SE3. Wholesale power there cost far more than in the northern zones SE1 and SE2 in 2025.
-
Energy tax. Sweden ended its reduced electricity tax for data centres on 1 July 2023. Data centres now pay the general rate of SEK 0.36 per kWh in 2026. A deduction of SEK 0.096 per kWh applies in parts of northern Sweden but not in Stockholm.
-
Stalled projects. Bahnhof cancelled Elementica, its planned large Stockholm data centre, in September 2025. It moved its growth to an underground site in Gothenburg.
Trends
-
Ownership is turning over. Apollo funds bought STACK's European colocation business in 2025. It now trades as Vaultica. CapMan's Kolo bought EcoDataCenter's two Stockholm sites the same year. CPP Investments and Equinix bought atNorth in September 2026. Telenor took control of Bahnhof in November 2026. Conapto's owner, the Marguerite II fund, is weighing strategic options. EQT has had GlobalConnect up for sale since September 2025.
-
AI moves into the city. CoreWeave and 6G AI Sweden run GPU clusters in Stockholm colocation halls. Scaleway chose the Stockholm area for its first AI supercomputer outside France in 2026.
-
Sovereign cloud. Evroc, a Swedish sovereign cloud company, plans its flagship AI data centre at Arlandastad, near Stockholm Arlanda Airport. It bought the building rights in 2025. It has not announced a construction start.
-
Large campuses go beyond the city. In 2025 Svk said Brookfield's planned AI campus at Strängnäs was too large for the local grid. Evroc has studied a nuclear-powered data centre at Studsvik since 2025. At the metro's southern edge, Stendörren holds a building permit and a grid agreement for a data centre at Almnäs in Södertälje. Its grid connection is due in the first half of 2028.
Power and Policy
Svk runs the transmission grid and its connection queue. Energimarknadsinspektionen (Ei) regulates the grid companies and grants their area licences. Ellevio distributes power in Stockholm municipality. Vattenfall Eldistribution, E.ON Energidistribution and smaller municipal companies serve the rest of the market. Since 1 July 2025, owners of data centres with at least 500 kW of installed IT power must report energy performance each year to an EU database. The Swedish Energy Agency (Energimyndigheten) supervises the reporting. The government is preparing a national data centre strategy, with no date set.