The Detroit data center market is located in the state of Michigan within Americas. Detroit has 40 facilities.
The top providers in Detroit are Related Digital (1 site) and Panattoni Development Company with 2 facilities . The most popular facilities are 365 Detroit (DT1) and Cogent: 3331 W Big Beaver.
| Name | Company | Size | Status | Type | |
|---|---|---|---|---|---|
|
365 Detroit (DT1) | 365 Data Centers | Extra Small | Operational | Carrier-Neutral |
|
Cogent: 3331 W Big Beaver | Cogent Communications | Extra Small | Operational | Carrier |
|
EdgeConneX Detroit | EdgeConneX | Extra Small | Operational | Carrier-Neutral |
|
Lumen Detroit 3 | Lumen Technologies | Extra Small | Operational | Carrier |
|
Lumen Detroit I | Lumen Technologies | Extra Small | Operational | Carrier |
|
Lumen: Detroit 4 | Lumen Technologies | Extra Small | Operational | Carrier |
|
US Signal: MI04 Southfield | US Signal | Extra Small | Operational | Carrier |
|
US Signal: MI03 Detroit Metro | US Signal | Extra Small | Operational | Carrier |
|
US Signal: MI05 Detroit North | US Signal | Small | Operational, Planned | Carrier |
|
US Signal: MI03 Bldg-2 | US Signal | Small | Planned | Carrier |
|
US Signal: MI03 Bldg-3 | US Signal | Small | Planned | Carrier |
|
Verizon: 21455 Melrose | Verizon Enterprise | Extra Small | Operational | Carrier |
|
123.net DC1 | 123.net | Small | Operational | Carrier-Neutral |
|
123NET: DC2 | 123.net | Extra Small | Operational | Carrier-Neutral |
|
123NET: DC3 | 123.net | Extra Small | Operational | Carrier-Neutral |
|
123NET: DC5 | 123.net | Extra Large | Planned | Carrier-Neutral |
|
|
Nexcess Southfield | Nexcess: Magento Hosting | Operational | Carrier-Neutral | |
|
ManagedWay Southfield | ManagedWay | Operational | Carrier-Neutral | |
|
ManagedWay Troy 600 Executive | ManagedWay | Small | Operational | Carrier-Neutral |
|
ManagedWay Troy 319 Executive | ManagedWay | Extra Small | Operational | Carrier-Neutral |
|
ManagedWay Southfield SFJ1 | ManagedWay | Operational | Carrier-Neutral | |
|
IronGate: Detroit, The Bunker | IronGate Data Centers | Large | Planned | Carrier-Neutral |
|
Telesystem DC-2 Monroe | Telesystem | Extra Small | Operational | MSP |
|
West Center | Extra Large | Planned | Hyperscale | |
|
|
Velocity Ann Arbor | Velocity Data Centers | Operational | Carrier-Neutral | |
|
Online Tech Ann Arbor | Otava | Extra Small | Operational | Carrier-Neutral |
|
Online Tech Ann Arbor 2 | Otava | Extra Small | Operational | Carrier-Neutral |
|
Online Tech Westland | Otava | Extra Small | Operational | Carrier-Neutral |
|
Mapletree: 19675 W Ten Mile | Mapletree Redwood Data Centre Trust | Operational | Real Estate | |
|
|
Quicken Loans | Quicken | Small | Operational | Enterprise |
|
Real Estate Data Center | Metrobloks | Large | Construction, Planned | Real Estate |
|
South Point | OpenAI | Extra Large | Planned | Hyperscale |
|
Ultra | OpenAI | Extra Large | Planned | Hyperscale |
|
Raeden: Detroit Carrier Hotel | Raeden | Extra Small | Operational | Real Estate |
|
Raeden: One Campus Martius | Raeden | Extra Small | Operational | Real Estate |
|
Panattoni: Detroit, Michigan | Panattoni Development Company | Large | Planned | Real Estate |
|
Panattoni: Detroit Expansion | Panattoni Development Company | Extra Large | Planned | Real Estate |
|
Related Digital: Benton, MI | Related Digital | Extra Large | Planned | Carrier-Neutral |
|
Education Data Center | University of Michigan (U-M) | In Doubt | Education | |
|
Verrus: Project Flex | Verrus | Large | Planned | Carrier-Neutral |
| Location | Total SqFt | Gross SqFt | Power (MW) |
|---|---|---|---|
| 123.net DC1 |
80,000 SqFt |
NN Request Dataset | |
| Quicken Loans |
47,500 SqFt |
NN Request Dataset | |
| US Signal: MI05 Detroit North |
76,000 SqFt |
NN Request Dataset | |
| ManagedWay Troy 600 Executive |
50,000 SqFt |
NN Request Dataset | |
| ManagedWay Troy 319 Executive |
20,000 SqFt |
NN Request Dataset |
| Location | Building SqFt | Power (MW) | Estimated Launch |
|---|---|---|---|
| Park Three | SqFt | 0 Megawatts | |
| Real Estate Data Center | SqFt | 18 Megawatts | Q4 2027 |