MetroInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Gilbert, AZ 85234, USA
Planned
Future facility in planning stage
Operated by:

Google: Mesa (Redhawk 3)

Site: Valley PlusInterested in this information?Contact us
Year Planned: 2029
Ownership: Google does not own the building.

This facility will be a part of Google's Redhawk campus in Mesa, AZ.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

PrimeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hub GammaInterested in this information?Contact us

Distance Site About
0.20 miles Cloud StationInterested in this information?Contact us
Phase II is expected to see Google build 280,000 square feet more.
0.34 miles Park GammaInterested in this information?Contact us
1.40 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
1.43 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
2.13 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
2.18 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
2.19 miles Comarch Mesa
2.22 miles Edged: Phoenix
Edged Energy’s PHX01-1 is a 36MW, two-story data center in Mesa, Arizona, spanning ~210,000 sq ft on a 12-acre site, launched in April 2026 with waterless cooling for high-density AI workloads.
2.22 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
2.22 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
2.31 miles Novva: Mesa Campus
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
2.37 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
2.39 miles West StationInterested in this information?Contact us
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
2.48 miles SouthInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
2.60 miles MetroInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
2.69 miles PlazaInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
2.70 miles CyrusOne Mesa
CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads.
2.80 miles AlphaInterested in this information?Contact us
This facility is a part of Meta's Mesa Campus in Arizona.
2.96 miles EdgeCore: PH03
3.08 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
3.11 miles EdgeCore: PH02
3.20 miles EdgeCore: Mesa PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
3.45 miles NTT PH2
3.46 miles NTT PH3
3.58 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
3.58 miles NTT Phoenix Campus
The first data center building encompasses 126,000 sqft of data floor space.
3.58 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
3.58 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
3.64 miles Center ProInterested in this information?Contact us
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
4.04 miles MaxInterested in this information?Contact us
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
5.20 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.28 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.37 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.44 miles NTT: Pacific Proving Tech Park
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
5.44 miles NTT: Pacific 7
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.52 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.60 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
5.65 miles Edge RidgeInterested in this information?Contact us
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
8.86 miles US Signal Phoenix AZ01
11.62 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
12.87 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
12.87 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
12.88 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
13.07 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
13.18 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
13.33 miles CyrusOne PHX10
13.36 miles CyrusOne PHX3
13.39 miles CyrusOne PHX1
13.41 miles CyrusOne PHX2
13.42 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
13.42 miles CyrusOne PHX9
13.42 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
13.44 miles CyrusOne PHX5
13.50 miles CyrusOne PHX4
13.52 miles DataCanopy: Phoenix, AZ
13.53 miles CyrusOne PHX7
13.55 miles CyrusOne PHX6
13.57 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
13.63 miles CyrusOne PHX8
13.67 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
13.76 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
13.83 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
17.34 miles EdgeConneX Phoenix
17.82 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
17.83 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
17.93 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
17.94 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
17.95 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
18.61 miles Iron Mountain: AZP3
Iron Mountain's AZP-3 data center is located in Phoenix, Arizona.
18.72 miles DataBank PHX2
18.76 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
18.76 miles Internap Phoenix
18.77 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
18.81 miles Centersquare: Phoenix PH1
19.01 miles Ryan: Florence Tech Park
The 780-acre development, dubbed the Florence Tech Park, has been presented with varying plans. Initial conceptual documents show five data centers, two office buildings, and one general industrial building.
19.25 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
19.32 miles Liquid Web Phoenix
19.82 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
19.89 miles EdgeCore: Dobson Expansion
19.96 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
19.98 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.

Global CampusInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

237
Facilities
75
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?