Milan Data Center Market

Latest Podcast

The Milan data center market is located in the country of Italy within EMEA. Milan has 101 facilities.

The top providers in Milan are Vantage Data Centers (6 sites) and DATA4 Group with 13 facilities . The most popular facilities are BT Italia: Milan BF1 and CyrusOne: Milan MIL1.

Market Facts

Milan Data Center Map

Milan Power Growth Over Time

+134% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Milan

Name Company Size Status Type
BT Italia: Milan BF1 BT Global Services Extra Small Operational Carrier
CyrusOne: Milan MIL1 CyrusOne Medium Construction, Planned Carrier-Neutral
CyrusOne: MIL2 CyrusOne Large Planned Carrier-Neutral
Digital Realty: Milan Digital Realty Trust Small Planned Carrier-Neutral
EdgeConneX: Lodi Campus EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: Milan 01 EdgeConneX Large Planned Carrier-Neutral
EdgeConneX: Milan 02 EdgeConneX Large Planned Carrier-Neutral
Equinix Milan ML2 Equinix Small Operational Carrier-Neutral
Equinix Milan ML3 Equinix Small Operational Carrier-Neutral
Equinix Milan ML4 Equinix Small Operational Carrier-Neutral
Equinix Milan ML5 Equinix Small Operational Carrier-Neutral
Equinix: ML7x Equinix Medium Operational Carrier-Neutral
Stack: MIL01A STACK INFRASTRUCTURE Small Operational HPC
STACK: MIL02A STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL01B STACK INFRASTRUCTURE Small Operational HPC
Stack: MIL03A STACK INFRASTRUCTURE Large Operational, Planned HPC
Stack: MIL08 STACK INFRASTRUCTURE Medium Operational HPC
Stack: MIL01C STACK INFRASTRUCTURE Small Operational HPC
Level3 Milan (Via Tortona) Lumen Technologies Operational Carrier
Level3 Milan (Via S Giusto) Lumen Technologies Operational Carrier
NTT: Milan NTT Large Planned Carrier-Neutral (Telco-Owned)
QTS: Vimercate, Milan QTS Data Centers Large Planned Carrier-Neutral
Vantage: MXP11 Vantage Data Centers Medium Operational Carrier-Neutral
Vantage: MXP21 Vantage Data Centers Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Medium Planned Carrier-Neutral
Vantage: MXP12 Vantage Data Centers Medium Operational Carrier-Neutral
Vantage: MXP13 Vantage Data Centers Medium Construction Carrier-Neutral
Vantage: MXP14 Vantage Data Centers Medium Construction Carrier-Neutral
Vantage: MXP22 Vantage Data Centers Medium Operational Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Medium Planned Carrier-Neutral
Carrier-Neutral Data CenterInterested in this information?Contact us Vantage Data Centers Extra Large Planned Carrier-Neutral
Verizon: Milan Sterling Verizon Enterprise Extra Small Operational Carrier
Virtus: Milan 1 VIRTUS Data Centres Ltd Large Construction Carrier-Neutral
GTT Milan EXA Infrastructure Extra Small Operational Carrier
Data4: Milan 1 DC1 DATA4 Group Small Operational Carrier-Neutral
Data4: Vittuone Campus DATA4 Group In Doubt Carrier-Neutral
Data4: Milan 1 DC2 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC3 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC4 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC5 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC6 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC7 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC10 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC9 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC8.2 DATA4 Group Small Operational Carrier-Neutral
Data4: Milan 1 DC11 DATA4 Group Small Construction Carrier-Neutral
Data4: Milan 1 DC12 DATA4 Group Small Planned Carrier-Neutral
Data4: Milan 1 DC15 DATA4 Group Small Construction Carrier-Neutral
Data4: Milan 1 DC14 DATA4 Group Small Planned Carrier-Neutral
Data4: Milan 1 DC8.1 DATA4 Group Small Construction Carrier-Neutral
Aruba: IT3 DC-A Aruba S.p.A. Extra Small Operational Carrier-Neutral
Aruba: IT3 DC-B Aruba S.p.A. Small Operational Carrier-Neutral
Aruba: IT3 DC-C Aruba S.p.A. Small Operational Carrier-Neutral
Aruba: IT3 DC-D Aruba S.p.A. Medium Construction Carrier-Neutral
Aruba: IT3 DC-E Aruba S.p.A. Withdrawn Carrier-Neutral
Infracom Milan Infracom Italia SpA Operational Carrier
CDLAN C21 Milan CDLAN Srl Small Operational Carrier-Neutral
Khazna: Ferrera Erbognone, Lombardy Khazna Extra Large Construction, Planned Carrier-Neutral
Keppel Milan Keppel Data Center REIT Small Operational Carrier-Neutral
CloudHQ: MXP1 CloudHQ Large Construction Carrier-Neutral
CloudHQ: MXP2 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP3 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP4 CloudHQ Large Planned Carrier-Neutral
CloudHQ: MXP5 CloudHQ Large Planned Carrier-Neutral
CampusInterested in this information?Contact us Microsoft Azure Small Operational Hyperscale
Station ProInterested in this information?Contact us Microsoft Azure Large Construction Hyperscale
EdgeInterested in this information?Contact us Microsoft Azure Small Operational Hyperscale
PlusInterested in this information?Contact us Microsoft Azure Medium Planned Hyperscale
Station PlusInterested in this information?Contact us Microsoft Azure Medium Planned Hyperscale
Valley BetaInterested in this information?Contact us Microsoft Azure Medium Planned Hyperscale
OVH: Milan OVH Group Small Operational Content
Compass Milan Compass Datacenters Large Operational, Planned Carrier-Neutral
Echelon: LIN10 Bldg-1 Echelon Data Centres Large Construction Carrier-Neutral
Echelon: LIN10 Bldg-2 Echelon Data Centres Extra Large Planned Carrier-Neutral
K2: Milan Campus K2 Data Centres Large Planned, Prospective Expansion Carrier-Neutral
AtlasEdge Milan AtlasEdge Small Operational Carrier-Neutral
Noovie: Rozzano DC4 Noovle S.p.A Small Operational Content
Noovle: Santo Stefano Ticino Noovle S.p.A Medium Operational Content
DAMAC: Milan MIL01 DAMAC Digital Extra Large Planned Carrier-Neutral
Apto: Lacchiarella Apto Extra Large Planned Carrier-Neutral
Rai Way: Milan Rai Way Data Center Small Operational Carrier
hscale: Milan MXP1 hscale Large Construction Carrier-Neutral
hscale: MXP2 Bldg1 hscale Large Planned Carrier-Neutral
hscale: MXP2 Bldg2 hscale Large Planned Carrier-Neutral
hscale: MXP2 Bldg3 hscale Large Planned Carrier-Neutral
AiOnX: Pregnana Innovation Campus SWI Group Large Planned Private Equity
Qarnot: Brescia Qarnot Extra Small Construction, Operational Enterprise
Eni Green Data Center Eni SpA Medium Operational Carrier-Neutral
MOMIT Milan MOMIT SRL Small Operational MSP
Magnora: Milan 2 Magnora Medium Planned Carrier-Neutral
GSM: Certosa di Pavia G.S.M. S.r.l. Medium Planned Real Estate
Retelit: Avalon 3 Retelit S.p.A. Small Operational Carrier-Neutral
Retelit: Corsico DC2 Retelit S.p.A. Small Construction Carrier-Neutral
Retelit: Corsico DC1 Retelit S.p.A. Small Construction Carrier-Neutral
Retelit: Avalon 2 Retelit S.p.A. Extra Small Operational Carrier-Neutral
Retelit: Avalon 1 Retelit S.p.A. Small Operational Carrier-Neutral
Unidata: Milan Unidata Extra Small Operational Mobile
Poste Italiane: Lombardy Poste Italiane Large Planned Government
Vitali: Arcene Innovation Hub Vitali S.p.A In Doubt Real Estate
Vaultica: MIL03 Vaultica Small Construction Carrier-Neutral
Vaultica: Siziano MIL01 Vaultica Operational Carrier-Neutral

Largest Providers in Milan

Vantage Data Centers
Site
Power
Operational
4
64.0
Construction
2
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider
DATA4 Group
Site
Power
Operational
10
55.4
Construction
3
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
13
View Provider
Microsoft Azure
Site
Power
Operational
2
16.14
Construction
1
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
STACK INFRASTRUCTURE
Site
Power
Operational
6
51.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
6
View Provider

Largest Data Centers in Milan

Location About Total SqFt Power (MW)
Compass Milan NN Request Dataset
Eni Green Data Center
This facility spans 5,200 square meters (55,970 sq ft) and offers a power density of 50kW per squ...
NN Request Dataset
Noovle: Santo Stefano Ticino
This facility is operated by Noovle S.p.A., the TIM Group’s cloud and data-center company.
NN Request Dataset
Equinix: ML7x
Equinix ML7x is the second IBX on Equinix's Settimo Milanese campus, at Via Marisa Bellisario 7 w...
NN Request Dataset
Data4: Milan 1 DC9
DC9 is a two-storey data center on Data4's Milan 1 campus in Cornaredo and Settimo Milanese, buil...
NN Request Dataset NN Request Dataset

Sites Under Construction in Milan

Location Building SqFt Power (MW) Estimated Launch
Retelit: Corsico DC2 96,875 SqFt 6 Megawatts
Data4: Milan 1 DC15 117,670 SqFt 15 Megawatts
Data4: Milan 1 DC11 117,670 SqFt 15 Megawatts
Data4: Milan 1 DC8.1 111,410 SqFt 10 Megawatts
Retelit: Corsico DC1 96,875 SqFt 6 Megawatts
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030
Subscribe to Baxtel NN Sqft NN Megawatts NN 2030

Data Center Events in Milan See all

1 events
Event Starts in Details
212 days
View DCN Milan 2027
Organized by:
Data Center Nation
Type:
Data Center
Description:

DCN Milan 2027 is an annual digital infrastructure summit organized by Data Center Nation, taking place on May 27, 2027 at Allianz MiCo in Milan, Italy. Entering its sixth edition, the full-day gathering connects hyperscalers, colocation operators, enterprise buyers, engineering consultants, utilities, and infrastructure technology suppliers. The summit expects more than 3,400 data center decis...

Related News See all

Read O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan
O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a [Vantage Data Centers](https://baxte...

O-Green Replaces Vantage In 570MW Zaragoza Data Center Campus Plan

October 23, 2026 Aragon

O-Green, an investment fund linked to the Sultanate of Oman, will finance a 570MW data center campus at San Mateo de Gállego in Zaragoza. The project replaces a Vantage Data Centers campus announced for the same area in September 2025. elEconomista reports the total investment reaches €7.446...

Read more
Read Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
[Vantage](https://baxtel.com/data-centers/vantage-data-centers) has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to ...

Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses

October 22, 2026 Vantage Data Centers

Vantage has reserved more than 1GW of manufacturing capacity for Heron Link, the solid-state transformer made by Heron Power Electronics, to deploy across its hyperscale data center campuses. The agreement, announced Oct. 21, delivers medium-voltage grid power straight to 800 volts DC, cutting...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Magnora Data Center Acquires 2MW Operating Oslo Site With Blix Group
Magnora Data Center ASA has acquired [an operating data center in Oslo](https://kommunikasjon.ntb.no/announcement/19111297?lang=en) from an international telecom operator, adding u![commons.wikimed...

Magnora Data Center Acquires 2MW Operating Oslo Site With Blix Group

October 21, 2026 Magnora

Magnora Data Center ASA has acquired an operating data center in Oslo from an international telecom operator, adding up to 2MW of IT load. The seller is not named, and financial terms were not disclosed. Magnora Data Center owns 75 percent of the facility, and Blix Group AS, the owner of...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your