Digital Colony was rebranded as DigitalBridge in 2021.
Digital Colony is focused on investing in the next generation of digital infrastructure. The firm invests in the mobile and internet infrastructure landscape worldwide, including macro cell towers, data centers, small cell networks, and fiber networks.
░ Login to view MW Total Power
The company intends to invest $772 million in the campus. The first phase of the project is set to complete in Q2 2026
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
The facility is located in Northern Dallas in the Technology Business Corridor
AtlasEdge has expanded into Austria through the acquisition of an existing data center located on the Siemens Campus in Vienna-Floridsdorf. AtlasEdge Vienna sits on 11,000 sqm plot with 10MW future capacity.
DataBank’s newest Uptime Certified TIER III Data Center, and the third in the Dallas area
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
The site use to be called 4degrees Montréal before being acquired by Vantage in December 2019. The Montréal centre is now connected to the Québec City centre via Videotron’s fibre optic network.
In December 2020, Databank acquired the site from Zayo.
With proximity to ample hydroelectricity, the site has 750kW of reliable power onsite, redundant N+1 power availability 208VAC or 120VAC in 15A, 20A, 30A & 60A multiples in both single or 3-phase configurations.
The site was previously known at Openface Montreal before being acquired by Beanfield in February 2020.
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
DataBank’s South Lake facility is situated in the technology-rich, South Kansas City suburb of Lenexa, providing direct, on-site connectivity to several Tier 1 carriers.
Powered by two separate substations with on-site, diesel-powered generators for backup, the data center includes 6,000+ sqft of space for customer equipment and advanced cooling technology to ensure optimal operating temperatures.
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a 160MW mega-scale data center campus. Construction began in early 2019, with the first 32MW phase coming online in 2022.
Customers can utilize Zayos fiber and lit services to reach the Nap of the Americas
In 2023, Databank expanded the site from 15,000sqft and 1.2 MWs to a total of 60,000 sqft and 7.5 MWs.
Vantage Data Centers is planning a 1.7M SF data center complex on Riverside Parkway in Douglasville, Atlanta.
The office building (which contains the data centre) is centrally located at the heart of the Penang Cybercity business district, Bayan Baru.
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
Formerly known as zColo Cleveland-1525 Rockwell
The site was a former zColo (Zayo) facility before being acquired in 2020.
Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.
The AIMS carrier neutral data centre is situated in Telstra’s Paya Lebar Data Centre (SGCS 2) and is part of the Pacnet Enabled Network (PEN), the first Pan-Asia Network-as-a-Service (NaaS) architecture
a former zColo facility
The site was formerly known owned by Lightbound before being acquired in October 2019.
KC3 has 25,000 square feet of raised white floor and 3 MW of power capacity in Phase I
The site was acquired by Zayo in January 2016 from Stream Datacenters.
Databank acquired the facility in 2019 from PNC Bank in a sale-leaseback transaction. BNC Bank occupies the entire second floor.
Vantage acquired the land in August 2023 and has not yet announced construction
The first phase, scheduled for delivery in 2021, will include 8MW of IT capacity
UPS/DC power with battery back-up with 2N configuration
Located in Sagamihara, the Tokyo campus will be comprised of 300,000 square feet (28,000 square meters) and will feature three multi-story, earthquake resistant facilities.
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points.
The site was formerly operated by C7 before the Databank acquisition.
The site was originally a Peer 1 site before the Cogeco acquisition.
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
The "Sterling Building" in Cleveland's Theater District is a tech-focused office building, the structure dates from 1909 and once was the home of the old Sterling Lindner department store.
The data center is conveniently located near three major business districts: Galleria, Greenway Plaza, and Downtown.
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
The site was originally a Peer 1 site before the Cogeco acquisition.
The site was a former zColo (Zayo) facility before being acquired in 2020.
AtlasEdge's Hamburg facility is located at Obenhauptstraße 1C next to Hamburg airport. HAM001 offers 8MW across 2,600 sqm (27,985 sq ft) of technical space.
Vantage started to build a new data center at 14720 Omicron Drive, San Antonio, TX. The data center, which will span 242,667 sq ft (22,545 sqm) of floorspace, will be a two-story building with a total capacity of 32MW.
The DataBank site is part of the CODA development, a 645,000 sqft mixed-use office complex, currently under construction in Georgia Tech’s Technology Square.
Scala Data Centers has launched operations at its first data center in Porto Alegre, Brazil over a 43,809 sqft built area. Known as SPOAPA01, the data center has an IT capacity of 4.8MW.
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
AtlasEdge unveils Leeds first Tier 3 standard data center. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
Covering a total floor space of more than 42,000 square feet spread over 4 floors, the PCCW data center was opened in 2013.
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.
Vantage operates a 68-acre campus with three large data centers.
Name | Date Added | Description |
---|---|---|
0312_r5_vantage_corp_brochure_kd | September 2015 |
Vantage Corporate Overview |
zcolo-remote-hands-brochure | July 2019 |
Zayo's remote hands service and options |
switch-cloud-deployment-strategies | July 2019 |
Switch: Cloud Deployment Strategies |
switch-cloud-deployment-strategies-4328fd46-b341-4091-9089-9e264fab68f8 | July 2019 |
Switch's Cloud Ecosystem |
cp1-colocation-overview-en | April 2019 |
Cogeco Colocation Services Overview (pdf) |
datacenter2017_fin | December 2017 |
Digita Oy Colocation Overview (FI) |
remotehands2017_fin | December 2017 |
Remote Hands overview (FI) |