Switch SUPERNAP Pyramid Grand Rapids

6200 60th St SE

░░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.

The building was originally built in 1989 to house offices for the Steelcase furniture company. The first phase of construction is an adaptive reuse of the pyramid that will create 225,000 square feet of data center space.

The site has a Foucault pendulum suspended from the ceiling in the main lobby of the massive data center.

Map and Nearby Locations:

6200 60th St SE
Click Map to begin Search

Sites within 15 miles of Switch SUPERNAP Pyramid Grand Rapids

Show SqM
Distance Site About
3.23 miles US Signal Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
8.64 miles US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup
8.68 miles ManagedWay Byron Center

Switch SUPERNAP Pyramid Grand Rapids Data Center Photos


Rendering of the Supernap Pyramid Campus

Rendering of the Switch PYRAMID
Source: Switch.com

Operating Company

Switch (NYSE: SWCH), the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

16 Facilities Owned
5 Markets Served
421.2 Megawatts
View Company