DataBank SLC1

Latest Podcast
179 Social Hall Avenue
Operational
Fully operational facility
Operated by:

DataBank SLC1

Short Code: City Creek
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points.

The site was formerly operated by C7 before the Databank acquisition.

Map and Nearby Locations:

179 Social Hall Avenue ( Suite 200 )
DataBank Sites
Nearby Facilities

Sites within 15 miles of DataBank SLC1

Distance Site About
0.55 miles XMission 51 E 400 S
1.85 miles Flexential Salt Lake (Fair Park)
3.56 miles Unisys Salt Lake City
Unisys's Salt Lake City data center supports multiple Unisys business functions for IT Managed Services
3.63 miles Flexential Downtown Salt Lake (Delong)
3.71 miles Lumen Salt Lake 1
4.89 miles Lumen Salt Lake City 4
5.51 miles Flexential Salt Lake (Mill Creek)
5.69 miles Senawave
6.09 miles Flexential Salt Lake (Presidents)
6.14 miles Voonami Salt Lake City SLC2
6.14 miles EdgeConneX Salt Lake
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
6.61 miles Hyperscale Data Center Request Dataset
6.63 miles Lumen Salt Lake 2
9.03 miles Aligned SLC-04
Aligned's SLC-04 is located in West Valley City, Utah, which is part of the Salt Lake City metropolitan area. SLC-04 is the first facility of approximately 270MW of new data center development that Aligned has planned.
10.06 miles Flexential Salt Lake (Cottonwood)
11.51 miles Flexential Salt Lake (South View)
11.77 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
12.35 miles Verizon: 8871 South Sandy
Former XO site
13.36 miles Aligned Salt Lake City
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
13.51 miles Aligned SLC-02
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
13.61 miles Aligned SLC-03
15.77 miles Novva: West Jordan 2
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
15.82 miles Novva: West Jordan Campus
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
15.85 miles Novva: West Jordan 3
The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility.
16.00 miles Hyperscale Data Center Request Dataset
Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.
16.22 miles Carrier-Neutral Data Center Request Dataset
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
16.48 miles Content Data Center Request Dataset
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
16.52 miles Content Data Center Request Dataset
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
16.55 miles Content Data Center Request Dataset
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
19.36 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.
19.87 miles DataBank SLC4
19.87 miles DataBank SLC5
19.91 miles DataBank SLC6
19.96 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
19.96 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
19.98 miles DataBank SLC3

DataBank SLC1 Data Center Photos (See all)

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
86
Facilities
23
Markets
423MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?