Switch Adopts Nvidia Omniverse DSX Blueprint for EVO AI Data Center Design
March 16, 2026
Switch
| Distance | Site | About |
|---|---|---|
| 0.09 miles | Lumen: Las Vegas 2 | |
| 0.17 miles | Switch Las Vegas 2 | |
| 2.31 miles | ISP.Net DC1 |
|
| 4.01 miles | Edged Energy: Las Vegas LAS01 |
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
| 4.14 miles | Flexential Carson I & II |
|
| 4.30 miles | ISP.Net DC2 | |
| 4.58 miles | Lumen: Las Vegas 3 | |
| 6.15 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 6.32 miles | Fiberhub - Las Vegas |
|
| 6.71 miles | ColoXchange Las Vegas | |
| 6.87 miles | Lumen: Las Vegas (1 Aerojet) | |
| 6.94 miles | DataBank Las Vegas LAS1 |
The site was a former zColo (Zayo) facility before being acquired in 2020.
|
| 7.04 miles | Hyperscale Data Center Request Dataset |
|
| 7.41 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 7.94 miles | Verizon: 2240 Corporate Cir | |
| 8.44 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 8.44 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 8.97 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
| 9.40 miles | Hyperscale Data Center Request Dataset | |
| 9.40 miles | Contegix Las Vegas | |
| 9.40 miles | Switch Las Vegas 7 | |
| 9.43 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 9.49 miles | Switch Las Vegas 12 | |
| 9.55 miles | Switch Edge 1 | |
| 9.66 miles | Switch Las Vegas 8 | |
| 9.74 miles | Switch Las Vegas 11 | |
| 9.79 miles | Switch: Las Vegas 15 | |
| 9.84 miles | Switch Las Vegas 10 | |
| 9.87 miles | Switch Las Vegas 9 | |
| 15.48 miles | Novva: Apex Industrial Park |
Novva Data Centers, a US operator, has purchased nearly 205 acres within the North Las Vegas Apex Industrial Park from VanTrust Real Estate.
|
| 16.43 miles | Townsite Solar 2: Boulder City |
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
|
Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.
Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.
March 16, 2026
Switch
July 15, 2024
Las Vegas
September 01, 2023
Switch
January 02, 2023
Switch
December 09, 2022
DigitalBridge
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas