Short Code: JNB11
Year Built: 2022
Utility Provider: ESKOM
Floors: 2
Lot Size: 30 acres

Sites on this Campus:

░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Johannesburg I Campus, otherwise known as Joburg, is located just 30 kilometers from OR Tambo International Airport. The campus sits on 30 acres (12 hectares) and will feature three data centers at full build-out. The first two-story facility spans 130,000 square feet (12,000 square meters) with 300W/SF (3.2kW/M2) average density. The other two two-story data centers span 260,000 square feet each (24,000 square meters each).

JNB11 Features


  • 100MVA HV substation on site
  • Power provided by ESKOM
  • Multiple, diverse power feeds supporting the campus
  • 400V electrical configuration
  • Two Meet-Me-Rooms (MMRs) for each data center on campus, allowing for diverse paths and multiple connectivity options
  • Four points-of-entry (POEs) for the campus ensuring maximum path diversity for inbound carriers
  • Diverse fiber pathways into the campus (minimum 2 paths per carrier)

Map and Nearby Locations:

Waterfall Logistics Precinct
Vantage Data Centers Sites
Nearby Facilities

Sites within 15 miles of Vantage Johannesburg

Distance Site About
0.08 miles Vantage: JNB12
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
0.16 miles Vantage: JNB13
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
0.56 miles ADC Midrand JHB1
6.22 miles ADC Samrand JHB2
ADC´s JHB2 Samrand Data Centre is a former Standard Bank data centre
6.45 miles xneelo JNB1 Samrand
6.57 miles Cosmas Data City – Samrand
The Cavaleros Group, a South African real estate firm, is expanding into the data centre sector with its new division, Cosmas Data Cities (CDC).
6.66 miles Digital Parks Africa: Samrand
DPA is adding 810 sqm (8,720 sq ft) and 570 racks to its existing Centurion facility, which currently features over 1,620 sqm of dedicated whitespace.
6.67 miles NTT Johannesburg 1
7.08 miles Hyperscale Data Center Request Dataset
Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.
9.44 miles Teraco JB4
Located in South Africa, the JB4 facility spans 80,000 sqm (861,110 sq ft) and features 14 data halls which comprise 17,000 sqm (182,985 sq ft) of space.
9.55 miles OADC: Isando
Pan-African operator Open Access Data Centres (OADC) launched its Johannesburg data center in December 2022.
9.57 miles Teraco JB5
Teraco, a South African data centre operator, launched its JB5 facility in 2025.
9.61 miles Telehouse Johannesburg
9.61 miles Teraco Johannesburg JB1
9.63 miles Teraco JB3
Teraco's JB3 facility spans 45,000 square metres of building structure, including 12,000 square metres of data white space.
10.23 miles Internet Solutions Johannesburg 158 Jan Smuts
10.65 miles Vantage: Johannesburg II
The first building of the JNB2 Islando campus consists of a 355,000 square foot (33,000 square meters) two-story data center. This is Vantage Data Centers' second campus in Johannesburg, South Africa.
10.76 miles Teraco Bredell Campus (JB2)
10.82 miles Equinix Johannesburg JN1

Vantage Johannesburg Data Center Photos (See all)

Rendering of Vantage's Johannesbug I Campus
Source: Vantage Data Centers
Rendering
Source: Baxtel
Vantage's 1st building in Johannesburg under construction in 2021
Source: Baxtel

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.