Vantage Johannesburg

Latest Podcast Waterfall Logistics Precinct
Operational
Fully operational facility
Operated by:

Vantage Johannesburg

Short Code: JNB11
Year Built: 2022
Utility Provider: ESKOM
Floors: 2
Lot Size: 30 acres

Sites on this Campus:

░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Johannesburg I Campus, otherwise known as Joburg, is located just 30 kilometers from OR Tambo International Airport. The campus sits on 30 acres (12 hectares) and will feature three data centers at full build-out. The first two-story facility spans 130,000 square feet (12,000 square meters) with 300W/SF (3.2kW/M2) average density. The other two two-story data centers span 260,000 square feet each (24,000 square meters each).

JNB11 Features


  • 100MVA HV substation on site
  • Power provided by ESKOM
  • Multiple, diverse power feeds supporting the campus
  • 400V electrical configuration
  • Two Meet-Me-Rooms (MMRs) for each data center on campus, allowing for diverse paths and multiple connectivity options
  • Four points-of-entry (POEs) for the campus ensuring maximum path diversity for inbound carriers
  • Diverse fiber pathways into the campus (minimum 2 paths per carrier)

Map and Nearby Locations

Waterfall Logistics Precinct
Vantage Data Centers Sites
Nearby Facilities

Vantage Johannesburg Power Growth Over Time

+200% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Vantage Johannesburg

Distance Site About
0.08 miles Vantage: JNB12
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
0.16 miles Vantage: JNB13
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
0.56 miles ADC Midrand JHB1
6.22 miles ADC Samrand JHB2
ADC´s JHB2 Samrand Data Centre is a former Standard Bank data centre
6.45 miles xneelo JNB1 Samrand
6.57 miles Cosmas Data City – Samrand
The Cavaleros Group, a South African real estate firm, is expanding into the data centre sector with its new division, Cosmas Data Cities (CDC).
6.66 miles Digital Parks Africa: Samrand
DPA is adding 810 sqm (8,720 sq ft) and 570 racks to its existing Centurion facility, which currently features over 1,620 sqm of dedicated whitespace.
6.67 miles NTT Johannesburg 1
6.92 miles NTT Data: JOH1, Johannesburg
The NTT Johannesburg 1 Data Center (JOH1) is a carrier-neutral, Tier-III standard colocation and interconnection facility that supports enterprise digital infrastructure and hyperscale cloud operations in South Africa
7.08 miles South PlazaInterested in this information?Contact us
Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.
9.44 miles Teraco JB4
Located in South Africa, the JB4 facility spans 80,000 sqm (861,110 sq ft) and features 14 data halls which comprise 17,000 sqm (182,985 sq ft) of space.
9.55 miles OADC: Isando
Pan-African operator Open Access Data Centres (OADC) launched its Johannesburg data center in December 2022.
9.57 miles Teraco JB5
Teraco, a South African data centre operator, launched its JB5 facility in 2025.
9.61 miles Telehouse Johannesburg
9.61 miles Teraco Johannesburg JB1
9.63 miles Teraco JB3
Teraco's JB3 facility spans 45,000 square metres of building structure, including 12,000 square metres of data white space.
9.65 miles Teraco: JB7
Teraco, a Digital Realty owned South African data center operator, has broken ground on its latest facility known as JB7, located at the Isando Campus in Ekurhuleni, east of Johannesburg.
10.23 miles Internet Solutions Johannesburg 158 Jan Smuts
10.65 miles Vantage: Johannesburg II
The first building of the JNB2 Islando campus consists of a 355,000 square foot (33,000 square meters) two-story data center. This is Vantage Data Centers' second campus in Johannesburg, South Africa.
10.70 miles Equinix Johannesburg JN1
10.76 miles Teraco Bredell Campus (JB2)

Vantage Johannesburg Data Center Photos See all

Rendering of Vantage's Johannesbug I Campus
Source: Vantage Data Centers
Rendering
Source: Baxtel
Vantage's 1st building in Johannesburg under construction in 2021
Source: Baxtel

Operating Company

Operated by:

Vantage is a wholesale datacenter provider operating in the Silicon Valley and Quincy, Washington markets.

Vantage was acquired by Digital Bridge Holdings LLC from Silver Lake Partners in January 2017.

176
Facilities
36
Markets

News See all

Read Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France
Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

Vantage and Altarea Plan 400MW Data Center Development in Bordeaux, France

February 25, 2026 Vantage Data Centers

The campus, to be built on land owned by Altarea, is expected to rank among the largest data center developments in France, according to the companies. Altarea has already secured a 400MW grid connection for the site. However, the exact location and construction timeline have not been disclosed....

Read more
Read Vantage Refused Approval For Data Center Project Outside Frankfurt.
Vantage Refused Approval For Data Center Project Outside Frankfurt.

Vantage Refused Approval For Data Center Project Outside Frankfurt.

February 08, 2026 Vantage Data Centers

US data center firm Vantage has been denied the chance to develop a new campus outside Frankfurt, Germany. The Groß-Gerau city council this month voted against entering into contract negotiations with the company Vantage Data Centers regarding the establishment of a data center.SPD parliamentary...

Read more
Read Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power
Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

Vantage Taps Liberty Energy to Deliver up to 1GW of Onsite Power

January 05, 2026 Vantage Data Centers

US data center developer Vantage Data Centers has signed a strategic partnership with US natural gas and oil services company Liberty Energy to deliver utility-scale power solutions for its North American data center portfolio. Under the terms of the agreement, Liberty Power Innovations (LPI), a...

Read more
Read Vantage Launches Final Building at Cyberjaya Data Center Campus
Vantage Launches Final Building at Cyberjaya Data Center Campus

Vantage Launches Final Building at Cyberjaya Data Center Campus

December 01, 2025 Vantage Data Centers

Vantage Data Centers this week announced that its fourth facility (KUL14) on the company’s first Cyberjaya campus in Malaysia is now operational. The 16MW data center is fully leased to a single unnamed customer.“We are thrilled to welcome our customer to KUL14 and support their expanding...

Read more
Read Vantage Finalizes $1.6bn Investment into APAC Platform
Vantage Finalizes $1.6bn Investment into APAC Platform

Vantage Finalizes $1.6bn Investment into APAC Platform

November 22, 2025 Vantage Data Centers

Vantage Data Centers has finalized a $1.6bn investment into its APAC platform using to acquire Yondr’s JHB1 campus in the southern peninsular Malaysian state of Johor. The facility sits on a 73-acre land parcel, and Vantage intends to expand the data center to deliver more than 300MW of capacity...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?