Switch: Houston 2

Latest Podcast 660 Greens Pkwy
OperationalPlanned
Operational with future phases planned
Operated by:

Switch: Houston 2

Short Code: Houston 2
Site was first built in 2015 and has expansions through 2029
Utility Provider: CenterPoint Energy
Ownership: Switch owns the real estate.
Lot Size: 18 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Houston 2 is Data Foundry's largest purpose-built data center, on Switch's 18-acre campus at 660 Greens Parkway in the Greenspoint area of North Houston. Data Foundry opened it in 2015 and added a second data hall in 2020. Switch bought Data Foundry in June 2021 and added a UPS and generator wing on the south side in 2024-2025.

Power

  • Houston 2's power design is 100% concurrently maintainable.
  • Dual underground, concrete-encased 34.5 kV utility feeds
  • Closed-transition Automatic Transfer Switch (ATS)
  • Fault tolerance and concurrent maintainability for single and dual-corded loads
  • 1500 kW PowerWare 9395 UPS lineups per power train
  • N+1 to 2N redundancy available
  • Multiple 2.25 MW Cummins diesel engine-generators
  • 8,400 gallons of fuel per generator (48 hours)

Cooling

  • Houston 2's concurrently maintainable chilled water cooling system is ideal for High Performance Computing (HPC), supporting 50 kW cabinets and blade server environments.
  • 550-ton VFD York chillers with fast restart
  • N+1 redundancy
  • 28,000 CFM chilled water Computer Room Air Handlers (CRAHs)
  • N+20% redundancy

Location

  • Built above the 500-year flood plain
  • 12 minutes from George Bush Intercontinental Airport
  • A multitude of hotels and restaurants within a 1-mile radius
  • Located in an area of dense fiber-optic connectivity

Map and Nearby Locations

660 Greens Pkwy
Switch Sites
Nearby Facilities

Switch: Houston 2 Power Growth Over Time

+167% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Switch: Houston 2

Distance Site
0.08 miles Switch: Houston 3
0.46 miles Lumen Houston 1
0.47 miles Cogent: 12061 N Freeway
0.48 miles 12001-12235 North Freeway - Digital Realty
0.48 miles Windstream Houston
0.49 miles Fibertown Houston
0.54 miles 11:11 Systems: Houston
3.66 miles Equinix Houston HO1
6.93 miles Energy Data CenterInterested in this information?Contact us
8.61 miles TRG Datacenters: Houston HOU1
8.70 miles Education Data CenterInterested in this information?Contact us
8.71 miles TRG Datacenters: HOU2
8.72 miles TRG Datacenters: HOU3
8.76 miles Lumen: Houston 5
9.01 miles Serverfarm: CTX1 Building 2
9.11 miles Serverfarm: CTX1 Building 1
9.13 miles Serverfarm: CTX2
10.17 miles ViVaVerse: Viva Center
10.48 miles DataBank Westway Park I
10.56 miles DataBank Westway Park II
10.66 miles CyrusOne: Houston HOU4
10.74 miles Databank Westway Park III
10.76 miles Hyperscale Data CenterInterested in this information?Contact us
10.77 miles CyrusOne: Houston HOU3
10.78 miles DataCanopy: Houston, TX
12.25 miles Energy Data CenterInterested in this information?Contact us
12.37 miles Saragon: Houston (8902 Point Six Circle)
12.79 miles Lumen Houston 4
12.81 miles Cogent: Houston Edge
12.90 miles Lumen Houston 3
13.27 miles HPC Data CenterInterested in this information?Contact us
13.30 miles LOGIX Houston (777 Walker)
13.30 miles Two Shell Plaza (777 Walker)
13.33 miles Quasar Data Center Houston
13.69 miles 1301 Fannin - Netrality Houston
13.70 miles Verizon: 1301 Fannin
13.99 miles Carrier Data CenterInterested in this information?Contact us
14.65 miles Verizon: 2401 Portsmouth
15.02 miles LOGIX 4635 Southwest Fwy
15.04 miles DataBank Houston Galleria
16.13 miles PS Lightwave: Lighthouse Data Center
16.27 miles Raeden: Jacinto City (4202 Fidelity)
16.51 miles Stream Houston - Woodlands
16.57 miles Enterprise Data CenterInterested in this information?Contact us
16.60 miles Disney: The Woodlands Digital Center 3
17.59 miles Energy Transfer: Ardmore Data Center
17.70 miles Prescott Realty Group-5959 Corporate
19.86 miles Rice University: Data Center

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

News See all

Read Mavria Raises $130M at $1B Valuation to Mass-Produce Modular Data Centers
Mavria launched on Nov. 9 with $130 million raised and a $1 billion valuation. The Houston-area company manufactures data centers in a factory and says its first unit is already in production. Mavr...

Mavria Raises $130M at $1B Valuation to Mass-Produce Modular Data Centers

November 09, 2026 Houston

Mavria launched on Nov. 9 with $130 million raised and a $1 billion valuation. The Houston-area company manufactures data centers in a factory and says its first unit is already in production. Mavria announced the figures in its launch post. Mavria designs and builds the physical data center. Its...

Read more
Read Switch Files Plans for 176-Acre Apex Data Center Campus in North Las Vegas
Switch has submitted a letter of intent to North Las Vegas officials for a roughly 175-acre data center campus at Apex Industrial Park, the first formal development proposal for a land position the...

Switch Files Plans for 176-Acre Apex Data Center Campus in North Las Vegas

September 26, 2026 Switch

Switch has submitted a letter of intent to North Las Vegas officials for a roughly 175-acre data center campus at Apex Industrial Park, the first formal development proposal for a land position the company has quietly assembled along the US-93 corridor since the start of the year. KTNV Las Vegas...

Read more
Read Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track
Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three faci...

Switch Files Plans For Data Center Campus At Former Pittsburgh Race Track

August 24, 2026 Switch

Switch has filed plans for a new three-building data center campus in Big Beaver Borough, near Pittsburgh, Pennsylvania. The proposed Big Beaver Data Center/Switch Pit 01-03 will feature three facilities, each covering 201,690 sq ft (18,737 sqm). Planning documents indicate a combined backup...

Read more
Read Iron County, Utah Data Center Proposal Gets Green Light
Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4.

The...

Iron County, Utah Data Center Proposal Gets Green Light

June 13, 2026 Switch

Plans for a 640-acre data center in Iron County, Utah, have been approved by local authorities. The Iron County Planning Commission voted in favor of the proposal during a meeting on June 4. The Antelope Data Center campus will include five buildings totaling around 1.35 million sq ft (125,000...

Read more
Read Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion
Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3...

Switch Expands Debt Facility to $9.5B to Fund AI Data Center Expansion

June 10, 2026 Switch

Data center firm Switch has increased its available debt capacity to $9.5 billion. The company now has access to a more than $6 billion corporate revolving credit facility, alongside an expanded $3.5 billion syndicated uncommitted performance letter of credit facility (LCF). In April, Switch...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.