Vegas Sphere powered by 150 Nvidia RTX A6000 GPUs
July 15, 2024
Las Vegas
The site was a former zColo (Zayo) facility before being acquired in 2020.
SOC1/SSAE16 Type II Certified
| Distance | Site | About |
|---|---|---|
| 0.24 miles | ColoXchange Las Vegas | |
| 0.62 miles | Fiberhub - Las Vegas |
|
| 0.93 miles | EdgeConneX Las Vegas |
EdgeConnex has rights to adjacent space to accommodate expansion
|
| 3.44 miles | Lumen: Las Vegas 3 | |
| 3.61 miles | Contegix Las Vegas | |
| 3.61 miles | Switch Las Vegas 7 | |
| 3.61 miles | Hyperscale Data Center Request Dataset | |
| 3.62 miles | Switch Las Vegas 12 | |
| 3.67 miles | Switch Las Vegas CORE Campus |
The Core Campus in Las Vegas, Nevada currently encompasses nine separate data centers with up to approximately 2.0 million GSF of space and up to 275 MW of 100% renewable power available to these facilities.
|
| 3.76 miles | Switch Edge 1 | |
| 3.81 miles | Verizon: 2240 Corporate Cir | |
| 3.82 miles | Switch Las Vegas 11 | |
| 3.83 miles | Switch Las Vegas 8 | |
| 3.97 miles | Switch Las Vegas 10 | |
| 3.97 miles | Switch Las Vegas 9 | |
| 4.31 miles | Switch: Las Vegas 15 | |
| 6.73 miles | ISP.Net DC2 | |
| 6.94 miles | Switch Las Vegas 5 | |
| 7.01 miles | Lumen: Las Vegas 2 | |
| 7.02 miles | ISP.Net DC1 |
|
| 7.11 miles | Switch Las Vegas 2 | |
| 7.53 miles | Hyperscale Data Center Request Dataset |
|
| 7.57 miles | Flexential Carson I & II |
|
| 7.78 miles | Edged Energy: Las Vegas LAS01 |
Edged Energy intends to construct a data center campus in Las Vegas, with operations expected to begin in Q1 2028.
|
| 8.85 miles | Switch: Jones Boulevard Campus |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 8.85 miles | Switch: Jones 2 |
The company is developing two buildings, one measuring 199,000 sq ft (18,485 sqm) and the other 228,000 sq ft (21,180 sqm) in the southwest Las Vegas Valley to host specialized AI hardware.
|
| 12.36 miles | Lumen: Las Vegas (1 Aerojet) | |
| 13.29 miles | Flexential Las Vegas (Lone Mountain) |
The Lone Mountain Data Center in North Las Vegas opened in 2013. Flexential's Lone Mountain site is former ViaWest.
AwardedTier IV Design Certification by the Uptime Institute for the design documents
3,000 tons redundant, fault-tolerant cooling capacity
|
| 15.08 miles | Townsite Solar 2: Boulder City |
Townsite Solar 2 LLC has proposed a high-density AI data center campus on 88.5 acres of city-owned land in Boulder City, Nevada.
|
| 15.59 miles | Novva Las Vegas |
Novva’s newest purpose-built data center is located at 6115 Nicco Way, Las Vegas.
|
DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.
Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.
July 15, 2024
Las Vegas
November 29, 2023
DataBank
November 16, 2023
DataBank
November 01, 2023
DataBank
September 22, 2023
DataBank
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas