DataBank Houston Galleria

Latest Podcast
4201 Southwest Freeway
Operational
Fully operational facility
Operated by:

DataBank Houston Galleria

Short Code: HOU5
Year Built: 2007
░░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In March 2022, Databank acquired the facility from CyrusOne. The site was formerly known as "CyrusOne Houston Galleria"

  • SSAE 16 (SOC I type II), PCI DSS (sec 9 & 12), HIPAA, ISO 27001, FISMA
  • High Performance Computing (HPC) capable, supports 250 wpsf with the ability to support over 1,000 wpsf
  • Carrier-neutral and part of CyrusOne Texas IX
  • 100% uptime service level agreement on power
  • 24×7 staffed NOCC and remote hands support
  • Dedicated cages and private suite options available

Power

  • Multiple levels of redundancy available within same footprint (e.g. N, 2N)
  • 13.5 MW of critical capacity
  • Dual input PDU’s with static transfer switches
  • Backed by generator power
  • 3,300 belly tank each plus an added 6,000 gallon external tank for every generator

Map and Nearby Locations:

4201 Southwest Freeway
DataBank Sites
Nearby Facilities

Sites within 15 miles of DataBank Houston Galleria

Distance Site About
0.52 miles LOGIX 4635 Southwest Fwy
The site was previously operated by Alpheus Communications before it was acquired by Logix.
1.72 miles Verizon: 2401 Portsmouth
Former XO Communications site
5.06 miles 1301 Fannin - Netrality Houston
1301 Fannin Street is a 25 story 1.1 million square building which was acquired in 2015 by Netrality. 1301 Fannin is the primary telecom hotel and interconnection point in Houston. Netrality operates as a carrier-neutral facility manages the Meet Me Room
5.06 miles Verizon: 1301 Fannin
5.18 miles Two Shell Plaza (777 Walker)
5.18 miles LOGIX Houston (777 Walker)
The 777 Walker data center is only one city block from the Alpheus fiber network hub at 1010 Travis, and is interconnected with it on a high capacity DWDM system.
5.43 miles Quasar Data Center Houston
6.38 miles Lumen Houston 4
6.39 miles Prescott Realty Group-5959 Corporate
6.65 miles Lumen Houston 3
9.01 miles Iozera: Houston, TX
Iozera has acquired an operational enterprise data center in Houston, Texas, with plans to transform it into a cutting-edge, AI-ready multi-tenant hub capable of hosting Nvidia Blackwell GPUs.
10.40 miles DataBank Westway Park I
DataBank’s HOU1 data center is located on on the Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290
10.45 miles DataBank Westway Park II
10.58 miles Databank Westway Park III
At full build the site will offer up to 640,000 square feet of data center shell with 450,000sqft of raised floor. The first phase is approximately 320,000 square feet of shell.
10.60 miles DataCanopy: Houston, TX
11.76 miles Lumen: Houston 5
13.42 miles Windstream: Sugar Land, TX
A switch and data center facility that serves as an interconnected transmission site for routing telecommunication traffic across the network.
14.06 miles Windstream Houston
Previously a PAETEC data center
14.88 miles 12001-12235 North Freeway - Digital Realty
Located in Greenspoint, the Digital North Freeway campus consists of multiple buildings. SunGard, Fibertown, and Level3 are all Digital tenants on the campus.
14.91 miles 11:11 Systems: Houston
14.95 miles Fibertown Houston
Fibertown operates a data center in Houston built around 2011.
14.95 miles Lumen Houston 1
15.02 miles Cogent: 12061 N Freeway
Cogent's 27,000 sqft data center in Houston offers retail colocation
15.05 miles Switch: Houston 3
Switch plans to build data center, in its own style, on a 10-acre adjacent land parcel in Houston.
15.09 miles Switch: Houston 2
Located in Greenspoint, Data Foundry's Houston 2 site is situated on 18 acres in North Houston. There is a large office area available for lease.
15.12 miles Equinix Houston HO1
Equinix acquired HO1 as well as 28 other datacenters from Verizon in 2017. It was formerly named Verizon IAH1.
18.58 miles EdgeConneX Houston
Customer work spaces are available Raised Floor: 30" EdgeConnex has rights to adjacent space to accommodate expansion.
18.58 miles ScaleMatrix Houston
The Scalematrix site can expand by an additional 15,000 Square Feet
18.59 miles LOGIX Primewest Pkw
The site was operated by Alpheus before Logix acquired it in January 2018.
19.31 miles Skybox Houston One
Skybox is built to withstand them all with a 6″ concrete roof deck able to sustain winds up to 190+ mph. The Skybox Houston Campus is fed by a large loop-fed 300 MVA substation.
19.35 miles Element Critical: Houston One Bldg-2
Expansion is underway at Element Critical’s Houston One campus. The provider is adding a state-of-the-art, high-density data hall spanning 20,000 sq ft to its existing footprint.
19.37 miles Element Critical Houston One
Element Critical acquired the facility from Skybox Datacenters in March 2022 for an undisclosed amount. The site was expanded with new halls in September 2022.
19.78 miles Serverfarm: CTX1 DC2
This datacenter is a part of Serverfarm's CTX1 campus in Houston, Texas.
19.80 miles Serverfarm: CTX2
The proposed 438,000 sq ft (40,691 sqm) facility will be located next to the company's existing data centers.
19.92 miles ViVaVerse: Viva Center
Lone Star PACE and Nuveen Green Capital have secured $40 million in clean energy financing to transform the historic Compaq Computer campus in Houston into an AI data center.
19.94 miles Serverfarm: Houston CTX1
Known as CTX1, this campus comprises two buildings strategically located near the former Compaq/HP headquarters in the Cypress Creek area.

DataBank Houston Galleria Data Center Photos (See all)

Operating Company

Operated by:

DataBank is a data center developer and operator that provides colocation, interconnection, cloud and managed services. Founded in 2005 and headquartered in Dallas, the company expanded its footprint through acquisitions and new builds.

Following the December 2020 close of its purchase of zColo assets from Zayo, DataBank reported operating 60 data centers across 28 markets in the U.S. and the U.K. In October 2024, DataBank announced an approximately $2.0 billion equity raise led by AustralianSuper to support new campuses in Dallas, Culpeper and Atlanta.

DataBank History:

  • In October 2024, announced an approximately $2.0 billion equity raise led by AustralianSuper to fund development of new campuses in Dallas, Culpeper, and Atlanta.
  • In December 2020, Databank closed the acquisition of zColo data center assets in the U.S. and U.K. from Zayo.
  • In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently
  • Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.
  • In January 2017, acquired facilities in Cleveland and Pittsburgh from 365 Data Centers.
  • In July 2016, acquired by Digital Bridge Holdings from Avista Capital Partners.
  • Founded in 2005 in Dallas, Texas.
86
Facilities
23
Markets
423MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?