Switch: 300 Dell Way

300 Dell Way

Operated by:

Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 173,895 square feet of gross floor area.

Map and Nearby Locations:

300 Dell Way
Click Map to begin Search

Sites within 15 miles of Switch: 300 Dell Way

Show SqM
Distance Site About
0.28 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
0.73 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
1.14 miles Sabey: Austin 2
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
1.26 miles Sabey Austin
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
1.82 miles Amazon: Round Rock, TX
Amazon is planning to develop a data center in the Round Rock area of Austin, Texas. The site spans across 149 acres along County Road 172 and McNeil Road, north of State Highway 45.
2.45 miles Skybox: Austin 2
Skybox and Prologis have discussed investing $548 million to build a data center at 2515 South Kenney Fort Boulevard in Pflugerville.
2.56 miles Skybox Austin
6.87 miles Verizon: 11501 Domain
Formerly an XO site
6.88 miles DataBank Austin AUS1
7.93 miles Citigroup: Georgetown
9.37 miles Skybox: Hutto PowerCampus
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.44 miles Skybox: Hutto 2
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.49 miles Skybox: Hutto 3
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.58 miles Skybox: Hutto 4
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.65 miles Skybox: Hutto 5
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.74 miles Skybox: Hutto 6
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
9.82 miles Skybox: Hutto 7
Skybox Datacenters and Prologis are building a massive 600-megawatt campus near Austin, Texas which will offer up to 4 million square feet of data center space.
10.23 miles Element Critical Austin
In 2021, Element Critical acquired the building from vXchnge.
15.25 miles HP Austin
Building 2 is a 180,000-square-foot that includes two rooms of 25,000 of raised floor. The facility is designed to allow ease of future expansion up to 200,000 square feet of raised floor in a two-level configuration adjacent to the central support core for a total of 600,000 gross square feet.
15.50 miles American Tower: Austin
15.71 miles Flexential Austin
Flexential's Austin site is was previously branded under the ViaWest name.
16.06 miles Lumen Austin 3 (500 Chicon)
16.07 miles LOGIX Austin (1905 E 6th)
Recently acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
17.96 miles Verizon: 2100 HWY 35
Former XO Communications site
18.32 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
18.89 miles 7620 Metro - Digital Realty
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
18.96 miles Switch: 7401 E Ben White
Switch acquired Texas-based Data Foundry, another enterprise colocation provider for $420m in an all-cash transaction from the Yokubaitis Family.
18.98 miles CyrusOne Austin I
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
18.98 miles Data Foundry Austin 1 (ADC)
Operated since 2003. Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
18.99 miles 7401 E Ben White - Digital Realty
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
19.15 miles 7500 Metro Center - Digital Realty
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
19.15 miles LightEdge Austin Montopolis
OnRamp Staffs the site 24/7/365 Power Densities up to 30kW / Rack Outside of 100 year and 500 Year Flood Plains
19.16 miles Lumen Austin 4
19.63 miles CyrusOne Austin II
Supports 250 wpsf with the ability to support over 1,000 wpsf Raised Floor: 48"

Switch: 300 Dell Way Data Center Photos


Construction work going on at Switch Round Rock II Data Center
Source: Round Rock Council

Operating Company

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

24 Facilities Owned
6 Markets Served
471.0 Megawatts
View Company

News

Read More News